DOB violations
2939 Brighton 8 Street, Brooklyn • Block 08668 • Lot 0802
18 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jul 28, 2025 | 25-01825 | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FTM BUILDING IN CODE COMPLIANT MANNER. NB IN STATE OF DISREPAIR. CMU WALL AT CORNER OF EXP 2/3 ON THE 5TH FLOOR IS LE... | — |
| Mar 14, 2025 | 19071 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V*-DOB VIOLATION - DISMISSED | REPAIR PARAPET PANELS ON SIDEWALK SHED EXPOSURE #1, SECURE PARAPET PANELS IN UPRIGHT POSITION. REPLACE DETERIORATING ... | Mar 25, 2025 |
| Mar 14, 2025 | 19071 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V-DOB VIOLATION - ACTIVE | REPAIR PARAPET PANELS ON SIDEWALK SHED EXPOSURE #1, SECURE PARAPET PANELS IN UPRIGHT POSITION. REPLACE DETERIORATING ... | — |
| Mar 14, 2025 | 19071 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V-DOB VIOLATION - ACTIVE | REPAIR PARAPET PANELS ON SIDEWALK SHED EXPOSURE #1, SECURE PARAPET PANELS IN UPRIGHT POSITION. REPLACE DETERIORATING ... | — |
| Apr 16, 2020 | 1301RH | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | STOP ALL WORK IMMEDIATELY AND MAKE THE SITE SAFE, CONTACT BOROUGH COMM. OFFICE AT 718 802-3677 FOR INFORMATION | — |
| Apr 16, 2020 | 1302RH | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | STOP ALL WORK IMMEDIATELY MAKE THE SITE SAFE CONTACT BOROUGH COMM. OFF ICE AT 718 802-3685B9RB3677 INFORMATION | — |
| Oct 17, 2019 | 01135 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V*-DOB VIOLATION - DISMISSED | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | Oct 2, 2020 |
| Aug 7, 2019 | 00582 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Jun 26, 2019 | 01156 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Apr 30, 2019 | 13699 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V*-DOB VIOLATION - DISMISSED | PARTIAL DEMOLITION - REMOVE ALL EIFS INSULATION BOARD + FINISH COAT AT EXP#4 WALL FROM BASE TO ROOF | Jan 27, 2022 |
| Feb 27, 2019 | 12577 | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | V*-DOB VIOLATION - DISMISSED | INSTALL APPROX. 50 LINEAR FT OF SIDEWALK SHED ALONG THE ENTIRE FRONT EXP#1 FOR SIDEWALK PROTECTION.SIDEWALK SHED SHAL... | Jan 27, 2022 |
| Apr 12, 2016 | 1301SH | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | — | — |
| Jun 12, 2015 | 1301KB | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | DUE TO CONTRACTOR WITHDRAWAL THE BOROUGH COMMISSIONER ISSUED SWO FOR A PPL.#302031904-NB APPROX.50% OF THE JOB COMPLE... | — |
| May 13, 2015 | 00307 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Dec 2, 2010 | 01542 | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | V-DOB VIOLATION - ACTIVE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION | — |
| Mar 10, 2009 | 1302SH | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Dec 18, 2014 |
| Feb 26, 2009 | 1301JS | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | — | Dec 18, 2014 |
| Apr 11, 2007 | 1301RB | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | BOROUGH COMMISSIONER HAS ISSUED A 10 DAY LETTER OF INTENT TO REVOKE APP# 302031904,ON 03-30-2007 REMEDY:STOP ALL WORK... | Mar 6, 2008 |