2209 Knapp Street, Brooklyn
Brooklyn • Block 08821 • Lot 0001 • Zip: 11229
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Downtown Brooklyn 69 min 33 walking, 36 riding
- Union Square 73 min 33 walking, 40 riding
- Times Square 77 min 33 walking, 44 riding
- Fulton Street 77 min 33 walking, 44 riding
- Grand Central 83 min 33 walking, 50 riding
- Penn Station 84 min 33 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Bus
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
-
HPD violation Dec 12, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, ...
-
HPD violation Dec 12, 2025
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LATCH SET AT COMPACTOR CLOSET DOOR AT PUBLIC HALL, ...
-
HPD violation Dec 12, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Dec 12, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Dec 12, 2025
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #39052486R ISSUED ON 12/08/2021, AND FAILURE TO FILE...
2024
-
CLASS - 1
28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND APPURTENANCES C...
-
CLASS - 1
28-323.8 AND RCNY 103-13(5). FAILURE TO SECURE PUBLIC SAFETY AND/OR MAKE THE BUILDING'S STRUCTURE AND APPURTENANCES C...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER ON AN ACTIVE PS CONSISTING OF 1 LEVEL BELOW 6FL BLDG, OBSERVED CRACKED/SPALLING CONCRETE/EXPOSED...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
VACATE ORDER EWO. EMERGENCY WORK ORDER TO VACATE ENTIRE PARKING LOT @ THIS LOCATION DUE TO IMMINENT UNSAFE COND. NOTE...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
VACATE ORDER EWO. EMERGENCY WORK ORDER TO VACATE ENTIRE PARKING LOT DUE TO IMMINENT UNSAFE CONDITIONS.NOTE: AT TIME O...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER.NOTE: ON AN ACTIVE PS CONSISTING OF 1 LEVEL BELOW 6FL BLDG,I SEVERE CRACKED/SPALLING CONCRETE/EX...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
VACATE ORDER EWO. EMERGENCY WORK ORDER TO VACATE ENTIRE PARKING LOT AT THIS LOCATION DUE TO IMMINENT UNSAFE CONDITION...
-
DOB violation Aug 28, 2024
C-CONSTRUCTION OTHER OPTIONAL
EMERGENCY WORK ORDER TO VACATE ENTIRE PARKING LOT AT THIS LOCATION.DUE TO IMMINENT UNSAFE CONDITIONS. NOTE: AT THE TI...
-
HPD violation Apr 16, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2021
-
CLASS - 1
I OBSERVED IN APT NEWLY INSTALLED PIPING, FITTINGS AND VALVES FOR STOVE IN APT #5D ON 5TH FLOOR AND NO PERMITS ON FIL...
-
CLASS - 1
I OBSERVED IN APT #5D ON 5TH FLOOR NEWLY INSTALLED GAS PIPING, FITTINGS AND VALVES FOR STOVE MORE THAN 6 FEET AWAY FR...
2020
-
Alteration Type II
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
-
Alteration Type II
LEAK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2019
-
Alteration Type II
LEAK REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2018
-
Alteration Type II
FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
2017
-
Alteration Type III
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33....
2016
-
Alteration Type III
INSTALLATION OF TEMPORARY SIDEWALK SHED AS PER PLAN SUBMITTED. WORK SHALL COMPLY WITH 2014 BUILDING CODES CHAPTER 33....
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records