35-61-35-63 9 Street, Queens
Queens • Block 00329 • Lot 0001 • Zip: 11106
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 19 min 2 walking, 17 riding
- Grand Central 19 min 2 walking, 17 riding
- Penn Station 22 min 2 walking, 20 riding
- Union Square 24 min 2 walking, 22 riding
- Fulton Street 31 min 2 walking, 29 riding
- Downtown Brooklyn 39 min 2 walking, 37 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Ferry
Bus
Citi Bike
Places nearby
Dutch Kills
No description yet
Sami's Kabab House
Unfussy mom-&-pop eatery offering traditional Afghan kebab meals, appetizers, bread & desserts.
Manhattan Park Pool Club
No description yet
Darjeeling Kitchen & Café
No description yet
Mama Hattie’s kitchen
Food truck
Sunshine Coffee (fresh juices & smoothies)
Sunshine Coffee is a cozy cafe in Astoria offering a variety of fresh juices and smoothies. Enjoy a relaxing atmosphe...
The Buffs
Thai restaurant
Coffee & Green
Juice shop
Activity
Sales, filings, permits and violations from every dataset, in one order.
2022
2019
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
-
DOB violation Feb 24, 2017
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2015
-
DOB violation Oct 1, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
2014
-
DOB violation May 15, 2014
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2013
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2011
-
Alteration Type III
REPLACE EXISTING WOOD BEAMS WITH NEW STEEL BEAMS IN CELLAR.
2010
-
CLASS - 2
WORK W/O A PERMIT WORK NOTED @ GRADE LEVEL OF PREMISES 36 AVE INSTALLED 1 ROLL UP GATE APPROX 8H-6W PAINTED YELLOW & ...
-
CLASS - 2
WORK W/O A PERMIT.WORK NOTED:@ GRADE LEVEL OF PREMISES; BRAKE CURB,INSTALLED CURB CUT FOR DRIVEWAY APPROX 8'WIDE X 1'...
2009
-
CLASS - 2
FAIL TO MAINTAIN. NOTED: AT CELLAR. 3 X 8 WOOD JOIST IS DISREPAIR AND ROTTEN, MAIN GUARDER HAS CRACK. REMEDY: REPAIR ...
2005
-
Alteration Type III
APPLICATION HEREWITH FILED TO ADD 12'-0" CURB CUT WITH (2) 1'-6" SPLAYS DISTANT 88.11' EAST FROM THE INTERSECTION OF ...
2004
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records