Crescent Street, Queens
Queens • Block 00395 • Lot 0006 • Zip: 11101
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Times Square 19 min 2 walking, 17 riding
- Grand Central 19 min 2 walking, 17 riding
- Penn Station 22 min 2 walking, 20 riding
- Union Square 24 min 2 walking, 22 riding
- Fulton Street 31 min 2 walking, 29 riding
- Downtown Brooklyn 39 min 2 walking, 37 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Hello! Bangladesh
No description yet
Dutch Kills
No description yet
Red Sorghum 夜宴 | Best Hunan Cuisine in LIC
Chinese restaurant
Sami's Kabab House
Unfussy mom-&-pop eatery offering traditional Afghan kebab meals, appetizers, bread & desserts.
John Brown BBQ
Counter-service BBQ spot serving Kansas City-style meats along with sides, salads, beer & wine.
Soothr LIC
No description yet
Astoria Seafood
Family-owned, counter-serve seafood market with create-your-own eats in busy, old-school digs.
Boishakhi Restaurant
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
2021
-
Alteration Type II
MODIFICATION TO EXISTING SPRINKLER SYSTEM ON THE 1ST FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
2019
2016
-
Alteration Type II
MECHANICAL WORK ON THE 1ST FLOOR. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015
2014
-
Alteration Type III
INSTALLATION OF 100 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERATION, FILED SEPARATELY. LIVE LOAD 300 ...
-
CLASS - 2
SIDEWALK SHED PARAPET PANEL NOT PROVIDED. NOTE: SIDEWALK SHED HAS BEENERECTED AT EXP #1 (24ST) UNDER PERMIT #42092850...
-
CLASS - 2
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. NOTE: SIDEWALK SHED HAS BEEN ERECTE...
2010
-
Alteration Type I
Convert storage/warehouse to vivarium (animal storage facility). New extension at second floor. correct metes and bou...
2009
-
Alteration Type II
INSTALL NEW FIRE ALARM SYSTEM FOR ANIMAL STORAGE FACILITY AS SHOWN ON RAWINGS FILED HEREWITH. NO CHANGE IN USE , EGRE...
2008
-
Alteration Type II
INSTALL MEDICAL GAS ALARM PANEL IN CONJUNCTION WITH JOB# 401754400 FOR MEDICAL GAS. NO CHANGE IN USE, OCCUPANCYOR EGR...
2006
1988
-
Non-Hazardous
EXCESSIVE PRESSURE IN SYSTEM. _______________________________________________________________________________________...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records