29-13 GARAGE 40 Road, Queens • Block 00402 • Lot 0032
39 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jun 17, 2026 | 39555648P | ACTIVE | CLASS - 2 | ACTIVE 12STORY MB. OBSERVED NEEDLE BEAM INSTALLED ON 2ND FLOOR AT CORNER OF EXPO2/3 WITH SCAFFOLD ON TOP IN USE. NEED... | $1,250 | $1,250 | Aug 25, 2026 |
| Jun 17, 2026 | 39555649R | ACTIVE | CLASS - 2 | OBS INADEQUATE HOUSEKEEPING THRUOUT SITE & ON PIPE SCAFFOLD DECKS. NOTED EXCESSIVE COMBUSTIBLE DEBRIS/GARBAGE BAGS NO... | $1,250 | $1,250 | Aug 25, 2026 |
| May 20, 2026 | 39554483L | RESOLVE | CLASS - 1 | OBSERVED INADEQUATE TEMPORARY WALKWAY ON ROADWAY WITH YODDOCK BARRIERS NOT BEING FILLED WITH WATER OR SAND AND NOT BE... | $1,250 | $0 | Jul 28, 2026 |
| May 20, 2026 | 39554482J | RESOLVE | CLASS - 2 | PROPOSED 12 STORY BUILDING WITH UNFINISHED EXTERIOR, OBSERVED ERECTED SIDEWALK SHED UPON FURTHER REVIEW NO ACTIVE PER... | $0 | $0 | Jul 28, 2026 |
| May 20, 2026 | 39554484N | RESOLVE | CLASS - 2 | OBSERVED ERECTED SIDEWALK SHED AT AN ACTIVE DRIVEWAY/GARAGE WITHOUT HIGH VISIBILITY MARKINGS OR OUTRIGGER KICKS ON VE... | $2,500 | $0 | Jul 28, 2026 |
| Apr 3, 2026 | 39552587R | RESOLVE | CLASS - 1 | ACTIVE 12STORY MB. NOTED SUPPORTED SCAFFOLDS AT EXPO2,3,4 AND INTERIOR COURTYARD BUILT W/ WOODEN PLANKS NOT REFLECTED... | $2,500 | $0 | Jun 9, 2026 |
| Apr 3, 2026 | 39552588Z | RESOLVE | CLASS - 1 | ACTIVE 12STORY MB WITH INADEQUATE HOUSEKEEPING THRUOUT. GREAT PILE OF COMBUSTIBLE CONSTRUCTION DEBRIS IN COURTYARD OB... | $2,500 | $0 | Jun 9, 2026 |
| Dec 20, 2025 | 39548212Z | RESOLVE | CLASS - 2 | BC 3303.3-WATCHPERSON-AT THE TIME OF MY INSPECTION OF CONSTRUCTION SITE WITH TOTAL SQUARE FOTAGE OF 191525.00 -NO WAT... | $2,500 | $2,500 | Nov 10, 2026 |
| Jul 9, 2025 | 35693938N | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENT. AS NOTED: AT TIME OF INSPECTION AT AN ACTIVE JOBSI... | $2,500 | $0 | Sep 18, 2025 |
| Jul 3, 2025 | 39541954X | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: SIDEWALK SHED IN PLACE AT EXPOSURE# 1-3 MISSING EXTEND SECTION AT CORNER EXPO# 1-4 AN... | $1,250 | $0 | Sep 9, 2025 |
| Jul 2, 2025 | 39541952M | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: AT EXPOSURE# 1 MATERIAL DELIVERY IN PROGRESS AT STORAGE ZONE AREA INADEQUATE PEDESTRI... | $0 | $0 | Sep 9, 2025 |
| Jul 2, 2025 | 39541942Z | RESOLVE | CLASS - 2 | RESPONDING AN INCIDENT, WHERE UNKNOWN INTRUDER TRESPASS INTO JOB SITE AND FALL FROM 3RD FL. TO 2ND FL. B STAIRWELL. C... | $5,000 | $0 | Sep 9, 2025 |
| Jun 20, 2025 | 39541640N | RESOLVE | CLASS - 1 | OBSERVED COMPLETED DEMOLITION OF A REAR GARAGE. UPON RESEARCHING DOB RECORDS NO PERMIT FOR DEMO WAS ISSUED. NEW BUILD... | $12,500 | $12,500 | Sep 3, 2026 |
| Jun 18, 2025 | 39541594L | RESOLVE | CLASS - 2 | AT TIME OF MY INSPECTION, I OBSERVED SIDEWALK SHED AT EXPOSURE 1 COMPLETELY INSTALLED, AND ACTIVELY BEING USED AS OVE... | $0 | $0 | Aug 26, 2025 |
| Jun 18, 2025 | 39541587N | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION, I OBSERVED THAT HOUSEKEEPING IS NOT BEING MAINTAINED IN A SAFE AND ORDERLY CONDITION AS... | $2,500 | $0 | Aug 26, 2025 |
| Jun 18, 2025 | 39541595N | RESOLVE | CLASS - 1 | AT TIME OF MY INSPECTION I OBSERVED A SUPPORTED SCAFFOLD INSTALLED AT EXPOSURE 4, CONTRARY TO APPROVED DOB PLANS. SUP... | $2,500 | $0 | Aug 26, 2025 |
| Jun 18, 2025 | 39541591X | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION I OBSERVED THAT GUARDRAILS REQUIRED FOR FALL PROTECTION WERE MISSING IN NUMEROUS LOCATIO... | $5,000 | $0 | Mar 24, 2026 |
| Jun 18, 2025 | 39541592H | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION, I OBSERVED THAT REQUIRED TOE BOARDS WERE MISSING AT NUMEROUS ELEVATED WORK SURFACES WHE... | $0 | $0 | Mar 24, 2026 |
| Mar 10, 2025 | 39537874Y | RESOLVE | CLASS - 2 | OBSERVATION: UPON MY REVIEW OF STRUCTUAL DRAWING FOR 12 STORY NEW BUILDING, APPROVED DRAWING SHOW STRUCTUAL BUILDING ... | $1,280 | $0 | May 20, 2025 |
| Mar 10, 2025 | 39537862R | RESOLVE | CLASS - 2 | OBSERVATION: UPON MY REVIEW OF STRUCTUAL DRAWING FOR 12 STORY NEW BUILDING, STRUCTUAL PLANS INADEQUATE MISSING FLOOR ... | $1,280 | $0 | May 20, 2025 |
| Jan 13, 2025 | 39535913Z | RESOLVE | CLASS - 1 | ON DECEMBER 20, 2024 IN A 12 STORY BUILDING AN INDIVIDUAL WAS INJURED IN A 5TH FLOOR STAIRWELL. AS PER DOB RECORDS TH... | $10,000 | $0 | Mar 25, 2025 |
| Dec 20, 2024 | 39535282L | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF 12 STORY NEW BUILDING OBSERVED AREA AT 5 FLOOR STAIRWELL A WHERE PERSON OF THE PUBLIC ENTERE... | $5,000 | $0 | Feb 25, 2025 |
| Dec 10, 2024 | 35686944Y | RESOLVE | CLASS - 2 | FAILURE TO PROVIDE PROTECTION OF ADJOINING PROPERTY DURING CONSTRUCTION OR DEMOLITION AS REQUIRED-NO WINDOW PROTECTIO... | $2,500 | $0 | Feb 18, 2025 |
| Dec 10, 2024 | 35686945X | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS. AS NOTED, AT TIME OF INSPECTION ... | $1,250 | $0 | Feb 18, 2025 |
| Dec 10, 2024 | 35686947J | RESOLVE | CLASS - 2 | FAILURE TO PERFORM SPECIAL INSPECTIONS AND VERIFICATIONS FOR CONCRETE CONSTRUCTION AS REQUIRED BY SECTION AND TABLE 1... | $2,500 | $0 | Feb 18, 2025 |
| Dec 10, 2024 | 35686946H | RESOLVE | CLASS - 2 | FAILURE TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES AND COLLECTION AND CONTAINMENT. AS NOTED, AT TIME OF INSP... | $2,500 | $0 | Feb 18, 2025 |
| Oct 1, 2024 | 37029914X | RESOLVE | CLASS - 1 | FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMEN... | $0 | $0 | Dec 31, 2024 |
| Jul 29, 2024 | 39530899Z | RESOLVE | CLASS - 1 | OBSERVED PROPOSED 12 STR / 120 FT NB WITH MULTIPLE SIMULTANEOUS ACTIVE STAGES OF CONSTRUCTION- EXCAVATION, FOUNDATION... | $10,000 | $0 | Oct 8, 2024 |
| Jul 29, 2024 | 39530901Z | RESOLVE | CLASS - 2 | OBSERVED PROPOSED 12 STR / 120 FT NB WITH MULTIPLE SIMULTANEOUS ACTIVE STAGES OF CONSTRUCTION- EXCAVATION, FOUNDATION... | $1,250 | $0 | Oct 8, 2024 |
| Jul 29, 2024 | 39530902K | RESOLVE | CLASS - 2 | OBSERVED PROPOSED 12 STR / 120 FT NB WITH MULTIPLE SIMULTANEOUS ACTIVE STAGES OF CONSTRUCTION- EXCAVATION, FOUNDATION... | $0 | $0 | Oct 8, 2024 |
| Jul 29, 2024 | 39530900R | RESOLVE | CLASS - 2 | OBSVD PROPOSED 12STR NB WITH SECTION OF BLNG AT SUPERSTRUCTURE PHASE- 1ST FL WORKING DECK BEING ERECTED AND STRUCTURA... | $1,250 | $0 | Oct 8, 2024 |
| Apr 15, 2024 | 39527543K | RESOLVE | CLASS - 2 | BC 3303.14.2. OBSVD SITE- CITED ON 4/10 FOR FAILR TO REMOVE STANDING WATER FROM EXCVN SITE- WITH WORSENED WATER CONDN... | $2,500 | $0 | Aug 27, 2024 |
| Apr 10, 2024 | 39527406Y | RESOLVE | CLASS - 2 | BC 3303.14 WATER CONDITIONS. OBSVD ACTIVE EXCAVATION SITE W/ 2 LARGE 10FTX10FT PITS DUG-OUT AND FILLED WITH SEVERAL F... | $2,500 | $0 | Sep 17, 2024 |
| Apr 10, 2024 | 39527404K | RESOLVE | CLASS - 2 | OBSERVED AN ACTIVE EXCAVATION SITE W/ MULTIPLE EXISTING FOUNDATION WALLS DESIGNATED TO REMAIN AND UTILIZED IN THE SUP... | $1,250 | $0 | Sep 17, 2024 |
| Apr 10, 2024 | 39527405M | RESOLVE | CLASS - 1 | BC 3304.1.2 SAFETY OF THE PUBLIC AND PROPERTY. OBSVD ACTIVE EXCAVATION SITE W/ AN EXISTING BRACED FDTN WALL PERPENDIC... | $5,000 | $0 | Sep 17, 2024 |
| Apr 10, 2024 | 39527403Z | RESOLVE | CLASS - 1 | SUPPORT OF EXCAVATION- BRACING AT EXP#1 BUILT CONTRARY TO THE DOB-APRVD & PE-STAMPED PLANS/DD: I-BEAMS INSTLD AS HORI... | $2,500 | $0 | Sep 17, 2024 |
| Apr 10, 2024 | 39527408H | RESOLVE | CLASS - 2 | 3301.13.3 DESIGNATION OF PRIMARY CS. ACTIVE SITE W/ ONGOING SOE/EARTHWORK- WORK UNDER SOE PERMIT Q00682330-Z2, FILED ... | $2,500 | $0 | Sep 17, 2024 |
| Mar 23, 2023 | 39514539P | RESOLVE | CLASS - 2 | SIDEWALK SHED BUILT IN CLOSE PROXIMITY TO UNINSULATED POWERLINES. AT THE TIME OF MY INSPECTION I OBSERVED A SWS INSTA... | $0 | $0 | May 30, 2023 |
| Mar 23, 2023 | 39514537L | RESOLVE | CLASS - 2 | NOTED: DURING INSPECTION I OBSERVED A SIDEWALK SHED INSTALLED AT EXPOSURE 1. AFTER REVIEWING APPROVED DRAWING IT WAS ... | $0 | $0 | May 30, 2023 |