Skip to content

ECB violations

29 Avenue, Queens • Block 00538 • Lot 0002

36 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Jun 9, 2026 39555247Y ACTIVE CLASS - 2 PROPOSED 4 STORY NEW BUILDING. ACTIVE SITE DURING SUPERSTRUCTURE PHASE, OBSERVED TEMPORARY CONSTRUCTION FENCE PERMIT ... $1,250 $1,250 Aug 18, 2026
Dec 10, 2025 39547805J ACTIVE CLASS - 2 ROOF PROTECTION AT EXPOSURE#2 AND #4 ADJOINING PROPERTY NOT INSTALLED PER CODE BC 3309.1 PROTECTION SHALL CONSIST OF ... $5,000 $5,000 Jan 5, 2027
Dec 10, 2025 39547815N ACTIVE CLASS - 2 MISSING SITE SAFETY PLAN ON SITE. SIDEWALK SHED DAILY INSPECTION LOGS MISSING SUPPORTED SCAFFOLD DAILY LOGS IN VIOLAT... $1,250 $1,250 Jan 5, 2027
Dec 10, 2025 39547811X ACTIVE CLASS - 2 SUPPORTED SCAFFOLD NOT MAINTAINED/BUILT PER CODE BC 3314.4.2SUPPORTED SCAFFOLD PLANKS NOT TIED DOWN BC 3314.12.6 PLAN... $2,500 $2,500 Jan 5, 2027
Dec 10, 2025 39547810Y ACTIVE CLASS - 1 GUARDRAILS AT ENTRANCE(EXP#1) OF SITE WAS NOT IN PLACE AND MISSING NETTING. OPEN SHAFT AT REAR OF STRUCTURE EXPOSURE#... $5,000 $5,000 Jan 5, 2027
Sep 7, 2025 39544527P ACTIVE CLASS - 2 FAILURE TO MAINTAINED NETTING AS PER BC 3314.1 AT THE TIME OF INSPECTION ON A NON ACTIVE JOB SITE, I OBSERVED LARGE O... $10,000 $10,000 Nov 18, 2025
Aug 9, 2025 39543458X ACTIVE CLASS - 2 AT TIME OF INSPECTION OBSERVED :THAT IN FRONT OF THE JOBSITE SIDEWALK WAS BADLY CRACKED CREATING A HAZARD AND TRIPPIN... $10,000 $10,000 Oct 14, 2025
Aug 9, 2025 39543456M ACTIVE CLASS - 2 NEW 4 STORY BUILDING OBSERVED: SITE CLOSED ,NO ONGOING CONSTRUCTION ACTIVITY , ALSO NOTED ON EXPOSURE 1 ONE TREE HAS ... $10,000 $10,000 Oct 14, 2025
Apr 17, 2025 39539229K RESOLVE CLASS - 2 4 STORY NB. STALL SITE UPON REVIEW OF DEPARMENT RECORDS PERMIT#Q00660905-I1-FN EXPIRED ON 4-4-2025RENEW PERMIT $0 $0 Jun 24, 2025
Feb 19, 2025 39537097Z ACTIVE CLASS - 2 INACTIVE CLOSED JOB WITH NO ACTIVE WORK PERMIT. I OBSERVED EXISTING SUPPORTED PIPE SCAFFOLD (ACTIVE PERMIT Q01039048-... $10,000 $10,000 Nov 10, 2026
Dec 24, 2024 39535327X RESOLVE CLASS - 2 FAILURE TO CORRECT VIOLATING CONDITION AND FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR VIOLATION... $0 $0 Dec 2, 2025
Oct 24, 2024 39533744H RESOLVE CLASS - 2 RESPONDENT FAILED TO CORRECT VIOLATING CONDITION AND FILE FOR A CERTIFICATE OF CORRECTION PURSUANT TO AC 28-204.4 FOR... $3,125 $3,125 Dec 31, 2024
Aug 24, 2024 35659701X RESOLVE CLASS - 1 INSTALLATION INSPECTION FOR SUPPORTED SCAFFOLD. OBSERVED POWER LINES IN CLOSE PROXIMITY/SECURED TO SUPPORTED PILE SCA... $0 $0 Jun 24, 2025
Apr 16, 2024 39527591P ACTIVE CLASS - 2 OBSERVED A 4 STR NEW BUILDING UNDER CONSTRUCTION FOR WHICH THE RESPONDENT IS THE GC ON THE CURRENT PERMIT, WITH A SID... $6,250 $6,250 Jun 25, 2024
Apr 16, 2024 39527590N RESOLVE CLASS - 2 OBSERVED A 4 STR NEW BUILDING UNDER CONSTRUCTION FOR WHICH THE RESPONDENT IS THE GC ON THE CURRENT PERMIT, WITH A SID... $3,125 $3,125 Jun 25, 2024
Mar 8, 2023 39513891J ACTIVE CLASS - 1 AT THE TIME OF MY INSPECTION OF A 4 STORY NB AND AFTER REVIEW THE PREVIOUS PICTURES OF COMPLIANT# 4911450. I OBSERVED... $25,000 $25,000 May 16, 2023
Jan 2, 2023 35545054N RESOLVE CLASS - 1 CONSTRUCTION SUPER FAILED TO PERFORM DUTIES PER CODE.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE OF A 4 STORY BUILDING... $10,000 $0 Mar 14, 2023
Jan 2, 2023 35545056R RESOLVE CLASS - 1 FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASUES-GUARDRAILS.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE WHERE 3 ... $2,500 $2,500 Mar 14, 2023
Jan 2, 2023 35545057Z ACTIVE CLASS - 1 3301.6.3 CAPACITY-LOADED DECK ON ROOF.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE,IT WAS OBSERVED TOP FLOOR/ROOF LOADE... $2,500 $2,500 Mar 14, 2023
Jan 2, 2023 35545053L RESOLVE CLASS - 1 FAILURE TO MAINTAIN/DISPLAY ONSITE DOCUMENTS REQURIED BY BC CHAPTER 33AT TIME OF INSPECTION AT AN ACTIVE SITE WHILE M... $1,250 $1,250 Mar 14, 2023
Jan 2, 2023 35545055P RESOLVE CLASS - 1 3301.1.1 RESPONSIBILITY FOR SAFETY.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE WITH 3 WORKERS PERFORMING MANSORY WORK,... $625 $625 Mar 14, 2023
Jan 2, 2023 35545058K ACTIVE CLASS - 1 3307.6.3 AREA TO BE PROTECTED-SIDEWALK SHED.AT TIME OF INSPECTION AT AN ACTIVE JOBSITE,IT WAS OBSERVED A SIDEWALK SHE... $2,500 $2,500 Mar 14, 2023
Sep 29, 2022 39507002J RESOLVE CLASS - 1 AT THE TIME OF MY INSPECTION OF AN APPROXIMATELY 50 NEW CONSTRUCTION ,I OBSERVED WORK IN PROGRESS AT EXPOSURE ONE WIT... $2,500 $2,500 Nov 15, 2022
Sep 29, 2022 39507001H RESOLVE CLASS - 1 INSPECTION OF AN 4 STORY BUILDING WITH ACTIVE WORK IN PROGRESS, I OBSERVED WORKER AT LEVEL THREE REMOVING CMU BRISK F... $2,500 $2,500 Nov 15, 2022
Sep 29, 2022 39507000X RESOLVE CLASS - 1 INSPECTION OF AN 4 STORY BUILDING WITH WORK IN PROGRESS, I OBSERVED ON AT SECOND FLOOR LEVEL AT CEILING LEVEL MIX USE... $625 $625 Nov 15, 2022
Sep 29, 2022 39506999X RESOLVE CLASS - 1 INSPECTION OF AN 4 STORY BUILDING WITH WORK IN PROGRESS , I OBSERVED AT EXPOSURE ONE A OF STREET LEVEL ADJACENT TO SI... $2,500 $2,500 Nov 15, 2022
Sep 29, 2022 39506998Y RESOLVE CLASS - 1 INSPECTION OF AN 4 STORY BUILDING WITH WORK IN PROGRESS, I OBSERVED 6 WORK ON SITE AT TOP LEVEL REMOVE CMU BRISK. UPO... $5,000 $5,000 Nov 15, 2022
Jul 13, 2022 39503496K ACTIVE CLASS - 1 FAILURE TO NOTIFY THE DEPARTMENT PRIOR TO THE COMMENCEMENT OF EARTHWORK.AT TIME OF INSPECTION OBSERVED EARTHWORK CONS... $2,500 $2,500 Jan 24, 2023
Mar 29, 2022 35636760Y RESOLVE CLASS - 1 BC3303.4.1.1 ALL AREAS USED BY PUBLIC SHALL BE MAINTAINED -SW FAILURE TO COMPLY.NOTE:OBSERVED INADEQUATE SW EXP1 DUE ... $625 $0 Jun 28, 2022
Mar 22, 2022 35645478P RESOLVE CLASS - 1 FAILURE TO PROVIDE REQUIRED NOTIFICATION PRIOR TO THE COMMENCEMENT OF DEMOLITION.AT ONE STORY DM BUILDING CURRENTLY A... $2,500 $2,500 Sep 13, 2022
Mar 22, 2022 35645898L RESOLVE CLASS - 1 PERMIT HOLDER FAILED TO ENSURE WORKERS ATTEND PRE-SHIFT SAFETY MEETINGPRIOR TO COMMENCEMENT OF WORK.INSPECTION OF 1 S... $2,500 $2,500 Sep 13, 2022
Mar 22, 2022 35645475J RESOLVE CLASS - 2 CONSTRUCTION JOBSITE FENCE NOT CONSTRUCTED AND MAINTAINED PURSUANT TO SUBSECTION.INSPECTION OF ONE STORY DM BUILDING ... $500 $500 Sep 13, 2022
Mar 22, 2022 35645476L RESOLVE CLASS - 2 FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.AT ONE STORY DM BUILDING CURRENTLY A... $5,000 $5,000 Dec 6, 2022
Mar 22, 2022 35645477N RESOLVE CLASS - 1 FAILURE TO MAINTAIN ADEQUATE HOUSEKEEPING PER SECTION REQUIREMENTS.AT ONE STORY DM BUILDING CURRENTLY AT GROUND WORK ... $625 $625 Dec 6, 2022
Mar 22, 2022 35645899N RESOLVE CLASS - 1 3301.13.1 FAILURE TO OBTAIN SITE SAFETY PLAN FOR DM SITE.INSPECTION OFONE STORY DM BUILDING CURRENTLY AT GROUND WORK ... $0 $0 Sep 13, 2022
Dec 29, 2009 34795489H ACTIVE CLASS - 2 WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROVED AMENDMENTS.INSP DWG 05/25/08 PC JOB ALT II 4... $2,500 $0 Feb 23, 2010