Maintenance code violations
34-01 28 Avenue, Queens • Block 00632 • Lot 0075
389 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Aug 10, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2D | Sep 3, 2021 |
| Aug 10, 2021 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st WINDOW FRAME FROM WE... | 2D | Nov 13, 2021 |
| Aug 10, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2D | Sep 3, 2021 |
| Aug 10, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 2D | Sep 3, 2021 |
| Aug 9, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4B | Sep 13, 2021 |
| Aug 9, 2021 | B | INVALID CERTIFICATION | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4C | Sep 27, 2021 |
| Jul 22, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5C | Aug 26, 2021 |
| Jul 22, 2021 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY SECURE THE LOOSE LIGHT FIXTURE AT THE CEILING AT PUBLIC HALL, 2nd STORY | — | Aug 26, 2021 |
| Jul 22, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | BM | Aug 26, 2021 |
| Jul 19, 2021 | C | NOV SENT OUT | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL REC... | — | Jul 23, 2021 |
| Jul 15, 2021 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3C | Aug 19, 2021 |
| Jul 15, 2021 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4C | Aug 19, 2021 |
| Jul 15, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3B | Aug 19, 2021 |
| Jul 15, 2021 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4H | Aug 19, 2021 |
| Jul 15, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4E | Aug 19, 2021 |
| Jul 15, 2021 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1B | Aug 19, 2021 |
| Jul 15, 2021 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | — | Jul 19, 2021 |
| Jun 4, 2021 | C | NOV SENT OUT | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 5G | Jun 8, 2021 |
| Jun 4, 2021 | C | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.8, 27-2056.9 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURI... | 5G | Jun 28, 2021 |
| Jun 3, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... | 5G | Jun 27, 2021 |
| Jun 3, 2021 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PRESUMED LEAD PAINT THAT IS PEELING OR ON A DETERIORATED... | 5G | Jun 27, 2021 |
| Jun 1, 2021 | C | VIOLATION CLOSED | § 27-2005, 2007 ADM CODE ARRANGE AND MAKE SELF-CLOSING THE DOORS AT APT ENTRANCE LOCATED AT APT 5G, 5th STORY, 1st AP... | 5G | Jun 27, 2021 |
| Apr 12, 2021 | C | NOT COMPLIED WITH | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th ... | 5G | May 8, 2021 |
| Apr 12, 2021 | C | NOT COMPLIED WITH | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 5G, 5th STO... | 5G | May 8, 2021 |
| Sep 29, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 4C | Oct 3, 2020 |
| Sep 29, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 2H | Oct 3, 2020 |
| Sep 29, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 3G | Oct 3, 2020 |
| Sep 3, 2020 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 5D | Oct 8, 2020 |
| Sep 3, 2020 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 5D | Sep 27, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | — | Sep 7, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 3H | Sep 7, 2020 |
| Sep 3, 2020 | C | VIOLATION CLOSED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 5D | Sep 27, 2020 |
| Sep 3, 2020 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT CEILING IN THE 3rd ROOM FROM EAST LOCATED AT APT 5D, 5... | 5D | Oct 8, 2020 |
| Sep 3, 2020 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 5D | Oct 8, 2020 |
| Sep 3, 2020 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FRAME FROM NORT... | 5D | Dec 7, 2020 |
| Sep 3, 2020 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 5D | Dec 7, 2020 |
| Sep 3, 2020 | C | NOV CERTIFIED LATE | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th ... | 5D | Sep 29, 2020 |
| Sep 3, 2020 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 5D | Sep 29, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 1A | Sep 7, 2020 |
| Sep 3, 2020 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | 5D | Oct 8, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 3C | Sep 7, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 4B | Sep 7, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 4E | Sep 7, 2020 |
| Sep 3, 2020 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 5D, 5th STOR... | 5D | Oct 8, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 5D | Sep 7, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 2C | Sep 7, 2020 |
| Sep 3, 2020 | C | NOV SENT OUT | § 27-2056.8 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERIOD OF UNIT VACA... | 2A | Sep 7, 2020 |
| Sep 2, 2020 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AT PUBLIC HALL, 5... | — | Dec 6, 2020 |
| Sep 2, 2020 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT... | — | Dec 6, 2020 |
| May 15, 2020 | C | NOV SENT OUT | § 27-2056.4(H) AND 27-2056.17 ADM CODE -CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL REC... | — | May 19, 2020 |