DOB violations
Woodside Houses, Queens • Block 00738 • Lot 0050
218 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 18907 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | — |
| Nov 14, 2025 | 18906 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | — |
| Oct 29, 2025 | SR40101XN | C-CONSTRUCTION OTHER OPTIONAL | V*-DOB VIOLATION - DISMISSED | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED BROKEN WINDOW ON EXPOSURE 2 ON 3RD FLOOR SAME WINDO... | May 20, 2026 |
| Jun 6, 2025 | SR40101XN | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED STEP CRACKING SPALLED BRICK WORK ON EXPOSURE 4 EAST E... | — |
| Jun 6, 2025 | SR40102XN | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | EMERGENCY WORK ORDER DUE TO STEP CRACKING ON EXPOSURE 4 EAST ELEVATION NORTH & SOUTH ENDS. STEP CRACKS SEEN AT 5TH AN... | — |
| Sep 23, 2024 | 17468 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| Sep 23, 2024 | 17467 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| May 1, 2024 | 00048 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00060 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00057 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00056 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00061 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00047 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00063 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00062 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00066 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00054 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00065 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00058 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00064 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00059 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| May 1, 2024 | 00055 | RWNRF-RETAINING WALL NONE | V-DOB VIOLATION - ACTIVE | FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09 | — |
| Jun 20, 2023 | 25873 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Mar 5, 2025 |
| Jun 20, 2023 | 05009 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION | Sep 24, 2024 |
| Feb 22, 2023 | 01284 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 01283 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02123 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 02125 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 01282 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | Sep 5, 2025 |
| Feb 22, 2023 | 01280 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 01285 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V-DOB VIOLATION - ACTIVE | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | — |
| Feb 22, 2023 | 01289 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | Sep 5, 2025 |
| Feb 22, 2023 | 02124 | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | V*-DOB VIOLATION - DISMISSED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 | Sep 5, 2025 |
| Dec 17, 2021 | 01311 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 28, 2024 |
| Dec 17, 2021 | 01310 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 22, 2024 |
| Dec 17, 2021 | 01312 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 28, 2024 |
| Dec 17, 2021 | 01309 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 28, 2024 |
| Dec 17, 2021 | 01308 | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | V*-DOB VIOLATION - DISMISSED | FAILURE TO PERFORM CATEGORY 5 INSPECTION | May 28, 2024 |
| Mar 17, 2020 | 9028/699995 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 5, 2022 |
| Mar 17, 2020 | 9028/669988 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Mar 17, 2020 | 9028/699987 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2022 |
| Mar 17, 2020 | 9028/669989 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | May 14, 2021 |
| Mar 17, 2020 | 9028/669986 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 22, 2022 |
| Mar 17, 2020 | 9028/669996 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 22, 2022 |
| Mar 17, 2020 | 9028/669991 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 5, 2022 |
| Mar 17, 2020 | 9028/669994 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Dec 16, 2021 |
| Mar 17, 2020 | 9028/669993 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Apr 5, 2022 |
| Mar 17, 2020 | 9028/4P1675 | E-ELEVATOR ELEVATORREQUIRED | V-DOB VIOLATION - ACTIVE | — | — |
| Mar 17, 2020 | 9028/669996 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | Jul 22, 2022 |
| Mar 17, 2020 | 9028/669985 | E-ELEVATOR ELEVATORREQUIRED | V*-DOB VIOLATION - Resolved | — | May 14, 2021 |