DOB violations
24-03 23 Avenue, Queens • Block 00867 • Lot 0002
8 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Nov 14, 2025 | 16371 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION | Jan 8, 2026 |
| Sep 23, 2024 | 14988 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION | — |
| Apr 25, 2023 | 21935 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION | — |
| Apr 6, 2018 | 17015 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT | — |
| Feb 24, 2017 | 14321 | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT | — |
| Jun 28, 1993 | 13527 | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | V*-DOB VIOLATION - DISMISSED | — | Sep 13, 1993 |
| Dec 10, 1991 | 76287-02 | B-BOILER BOILER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Apr 24, 2012 |
| Dec 10, 1991 | 76287-01 | B-BOILER BOILER OPTIONAL | VP*-VIOLATION UNSERVED ECB- DISMISSED | — | Apr 24, 2012 |