Skip to content

Job filings

39 Avenue, Queens • Block 01216 • Lot 0083

10 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Sep 21, 2016 440117561 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... $0 B H & B CONSTRUCTION INC.
Sep 21, 2016 440117865 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER ... $0 B H & B CONSTRUCTION INC.
Aug 2, 2016 420945455 Alteration Type III SIGNED OFF POINTING & POWER WASHING EXTERIOR WALL OF BUILDING. $230,000 STEVEN KAPETANOS & ASSOCIATES
Jan 11, 2016 420936189 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF AN EXISTING APARTMENT #B10. REMOVE NON BEARING PARTITION WALL. NEW WOOD FLOOR IN THE BEDROOM. ... $15,025 STEVEN KAPETANOS & ASSOCIATES
Dec 9, 2015 420936198 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF AN EXISTING APARTMENT #C5. REMOVE NON BEARING PARTITION WALL. NEW WOOD FLOOR IN THE BEDROOM. N... $15,525 STEVEN KAPETANOS & ASSOCIATES
Sep 22, 2014 420953007 Alteration Type II SIGNED OFF REPLACE BURNER IN EXISTING BOILER AND INSTALL HOT WATER HEATER. CHANGE FUEL FROM #2 OIL TO #2 OIL AND GAS. INSTALL NE... $20,800 DERBY REALTY LLC
Sep 10, 2014 420928241 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF AN EXISTING APARTMENT #C2. REMOVE NON BEARING PARTITION WALL. NEW WOOD FLOOR IN THE BESROOMS, ... $16,300 STEVEN KAPETANOS & ASSOCIATES
Apr 8, 2014 420911696 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF AN EXISTING ATP.#B2. INSTALL NEW WOOD FLOOR, NEW GRANITE TILE IN THE EXISTING KITCHEN & BA... $10,000 STEVEN KAPETANOS & ASSOCIATES
Mar 19, 2014 420923629 Alteration Type II SIGNED OFF INTERIOR RENOVATION OF AN EXISTING APT. #A7. REPLACE NEW WOOD FLOOR IN THE EXISTING BEDROOM & LIVING ROOM, NEW GR... $10,000 STEVEN KAPETANOS & ASSOCIATES
Nov 25, 2013 440117589 Alteration Type III PLAN EXAM - IN PROCESS PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY... $0 B H & B CONSTRUCTION INC.