Skip to content

Maintenance code violations

40-45 Elbertson Street, Queens • Block 01511 • Lot 0001

500 records

HPD grades a violation A for non-hazardous through C for immediately hazardous.

Issued Class Status Violation Apartment Correct by
Oct 18, 2024 B VIOLATION CLOSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT NORTH WALL IN TH... 630 Nov 22, 2024
Oct 18, 2024 B VIOLATION CLOSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE 4... 630 Nov 22, 2024
Oct 18, 2024 A VIOLATION DISMISSED § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM NORTH AT EAST WALL IN THE KIT... 630 Jan 21, 2025
Oct 18, 2024 A VIOLATION DISMISSED § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RISER FROM SOUTH AT WEST WALL IN THE BATHRO... 630 Jan 21, 2025
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 630 Nov 25, 2024
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 630 Nov 25, 2024
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... 630 Nov 25, 2024
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 630 Nov 25, 2024
Oct 18, 2024 A VIOLATION DISMISSED § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st RADIATOR FROM WEST AT NORTH WALL IN THE 1st... 630 Jan 21, 2025
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 630 Nov 25, 2024
Oct 18, 2024 C VIOLATION CLOSED § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... 630 Nov 25, 2024
Oct 18, 2024 B NOT COMPLIED WITH § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 630, 6th STORY... 630 Nov 22, 2024
Jun 12, 2024 A VIOLATION DISMISSED § 27-2005 ADM CODE REPLACE WITH NEW THE MISSING CONCRETE LANDING PAD UNDER DROP LADDER AT WEST AT 2ND INNER COURT FRO... Sep 15, 2024
Jun 12, 2024 C VIOLATION DISMISSED § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF BUSHES PREVENTING DROP LADDER FROM FREE FALLING AT ... Jun 18, 2024
May 13, 2024 B VIOLATION DISMISSED § 27-2005 HMC: REFIT COMPACTOR CHUTE DOOR AT EAST WALL AT PUBLIC HALL, 6th STORY Jun 17, 2024
May 13, 2024 C VIOLATION DISMISSED § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LOCKING ASSEMBLY DEVICE AT BUILDING FRONT ENTRANCE ... May 19, 2024
May 13, 2024 C VIOLATION CLOSED § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... May 27, 2024
Apr 18, 2024 C VIOLATION DISMISSED § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL APPROX 30 SQ FT IN ... 234 May 14, 2024
Apr 18, 2024 B VIOLATION DISMISSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE... 234 May 23, 2024
Apr 18, 2024 B VIOLATION DISMISSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL AND CE... 234 May 23, 2024
Apr 1, 2024 C NOT COMPLIED WITH § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... 234 Apr 27, 2024
Apr 1, 2024 B VIOLATION DISMISSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT WEST WALL IN THE... 234 May 6, 2024
Apr 1, 2024 B VIOLATION DISMISSED § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 234, 2nd STO... 234 May 6, 2024
Apr 1, 2024 C VIOLATION CLOSED § 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL... 527 Apr 15, 2024
Apr 1, 2024 B DEFECT LETTER ISSUED § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT WEST WALL APPR 16 SQ FT IN TH... 234 May 6, 2024
Apr 1, 2024 C VIOLATION DISMISSED § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE GLASS PANE AT UPPER WINDOW GLASS IN THE BATHROOM LO... 234 Apr 7, 2024
Apr 1, 2024 B VIOLATION DISMISSED § 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE SPRING BALANCE AT LOWER WINDOW SASH IN THE 3rd ROOM... 234 May 6, 2024
Apr 1, 2024 B VIOLATION DISMISSED § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT ALL WALLS AND CE... 234 May 6, 2024
Apr 1, 2024 A VIOLATION DISMISSED § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AROUND WINDOW APPR 1 SQ FT IN TH... 234 Jul 5, 2024
Apr 1, 2024 B VIOLATION DISMISSED § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... 234 May 6, 2024
Nov 9, 2023 C VIOLATION DISMISSED § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SECONDARY EGRESS DOOR SEALED SHUT ON SOUTH WALL IN ... 527 Nov 15, 2023
Oct 30, 2023 A VIOLATION DISMISSED § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING IN THE BATHROOM L... 128 Feb 2, 2024
Oct 19, 2023 B LEAD DOCS SUBMITTED, NOT ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 226 Nov 23, 2023
Oct 19, 2023 B FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... L2 Nov 23, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 236 Dec 7, 2023
Oct 19, 2023 B FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 139 Nov 23, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 124 Nov 23, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, NOT ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 336 Nov 23, 2023
Oct 19, 2023 B VIOLATION CLOSED § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 223 Nov 23, 2023
Oct 19, 2023 B CERTIFICATION POSTPONMENT GRANTED § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 138 Dec 7, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, NOT ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 528 Nov 23, 2023
Oct 19, 2023 B FIRST NO ACCESS TO RE- INSPECT VIOLATION § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 318 Nov 23, 2023
Oct 19, 2023 B CERTIFICATION POSTPONMENT GRANTED § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 319 Dec 7, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 526 Nov 23, 2023
Oct 19, 2023 B VIOLATION CLOSED § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 137 Nov 23, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, NOT ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 617 Nov 23, 2023
Oct 19, 2023 B VIOLATION CLOSED § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 630 Nov 23, 2023
Oct 19, 2023 B LEAD DOCS SUBMITTED, NOT ACCEPTABLE § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... 335 Nov 23, 2023
Oct 10, 2023 C NOV SENT OUT § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... 636 Oct 14, 2023
Oct 10, 2023 C NOV SENT OUT § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. 636 Oct 14, 2023