Maintenance code violations
Hampton Street, Queens • Block 01569 • Lot 0001
469 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| May 25, 2022 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR ,MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STORY... | 3C | Jun 29, 2022 |
| May 25, 2022 | B | VIOLATION CLOSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). ,MISSING IN THE ENTIRE APARTMENT LOCATED ... | 3C | Jun 29, 2022 |
| May 25, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 3C | Aug 28, 2022 |
| May 25, 2022 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd ... | 3C | Jun 20, 2022 |
| May 25, 2022 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3C, 3rd STO... | 3C | Jun 20, 2022 |
| May 25, 2022 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 3C | Jun 20, 2022 |
| Apr 20, 2022 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT WASH/BASIN IN THE BATHROOM LOCATED AT APT 4N, 4th STO... | 4N | May 25, 2022 |
| Apr 20, 2022 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th ... | 4N | May 16, 2022 |
| Apr 20, 2022 | C | FIRST NO ACCESS TO RE- INSPECT VIOLATION | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STO... | 4N | May 16, 2022 |
| Apr 20, 2022 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 4N, 4th STORY,... | 4N | May 25, 2022 |
| Apr 20, 2022 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED A... | 4N | May 25, 2022 |
| Mar 8, 2022 | A | VIOLATION DISMISSED | (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ... | — | Jun 11, 2022 |
| Jan 28, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5E | Mar 4, 2022 |
| Jan 28, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3D | Mar 4, 2022 |
| Jan 28, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3M | Mar 4, 2022 |
| Jan 28, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6S | Mar 4, 2022 |
| Jan 13, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4A | Feb 17, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL IN TH... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE NORTH WALL, WES... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | A | VIOLATION CLOSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION THE 1st RADIATOR FROM SOUTH AT WEST WALL, 2nd RADI... | 6J | Apr 16, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6K | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6L | Feb 15, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6R | Feb 15, 2022 |
| Jan 11, 2022 | C | DEFECT LETTER ISSUED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 6J | Feb 4, 2022 |
| Jan 11, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 6J | Apr 16, 2022 |
| Jan 11, 2022 | C | DEFECT LETTER ISSUED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | 6J | Feb 4, 2022 |
| Jan 11, 2022 | C | DEFECT LETTER ISSUED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD-PAINT THAT IS XRF TESTED INCONCLUSIVE FOR LEAD CONTENT AT ... | 6J | Feb 4, 2022 |
| Jan 11, 2022 | C | DEFECT LETTER ISSUED | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 6J | Feb 4, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1L | Feb 15, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1K | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1H | Mar 1, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1E | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1B | Mar 1, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 4S | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5D | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 5S | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6A | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 6H | Feb 15, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 6J, 6th STOR... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 6J | Feb 6, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING, EAST W... | 6J | Feb 15, 2022 |
| Jan 11, 2022 | A | VIOLATION CLOSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE 1st DOOR FROM NORTH AT E... | 6J | Apr 16, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3C | Mar 1, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 2E | Mar 1, 2022 |
| Jan 11, 2022 | B | NOV SENT OUT | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 2B | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 1R | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3E | Feb 15, 2022 |
| Jan 11, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7 AND 27-2056.17 ADM CODE -CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PERI... | 3J | Feb 15, 2022 |