Skip to content

ECB violations

101-22 43 Avenue, Queens • Block 01619 • Lot 0161

8 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Jun 28, 2024 39118057H ACTIVE CLASS - 2 WORK WITHOUT A PERMIT. NOTE : OBSERVED WORK HAS BEEN DONE TO BUILD AN ILLEGAL STRUCTURE (SHED) WITH GLASS PANELS AND ... $6,250 $6,250 Sep 3, 2024
Mar 18, 2019 37014564N RESOLVE CLASS - 2 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35326622M ISSUED ON 05-14-18 & TO FILE A C OF C PURSUAN... $3,125 $0 Jun 11, 2019
Oct 17, 2018 35367620J RESOLVE CLASS - 1 FAILURE TO INSTITUTE SAFETY OPERATION(PPE).@ TIME OF INSPECTION OF A 4 STY NB CURRENTLY @ ROOF LEVEL.I OBSERVED WORKE... $10,000 $10,000 Oct 8, 2019
Oct 17, 2018 35367618K RESOLVE CLASS - 1 BC 3303.2.3.1 TEMPORARY LIGHTING. AT TIME OF INSPECTION OF A 4 STORY NB CURRENTLY AT THE ROOF LEVEL, I OBSERVED WORK ... $2,500 $2,500 Oct 8, 2019
Oct 17, 2018 35367619M RESOLVE CLASS - 2 BC 3308.5 VERTICAL NETTING. AT TIME OF INSPECTION OF A 4 STORY NB CURRENTLY AT THE ROOF LEVEL. I OBSERVED MASONRY WOR... $1,250 $1,250 Oct 8, 2019
May 14, 2018 35326623Y RESOLVE CLASS - 2 LOGS. AT THE TIME OF INSPECTION OF A NEW 4 STORY BUILDING, CURRENTLY AT EXCAVATION PHASE, CONSTRUCTION WORK IN PROGRE... $2,500 $0 Oct 2, 2018
May 14, 2018 35326624X RESOLVE CLASS - 1 BC3303.11 EGRESS. AT THE TIME OF MY INSPECTION OF A NEW 4 STORY BUILDING, CURRENTLY AT EXCAVATION PAHSE, CONSTRUCTION... $2,500 $2,500 Nov 27, 2018
May 14, 2018 35326622M RESOLVE CLASS - 2 BC3301.2 REBAR CAPS. AT THE TIME OF MY INSPECTION OF A NEW 4 STORY BUILDING CURRENTLY AT EXCAVATION PHASE, CONSTRUCTI... $1,250 $1,250 Jul 3, 2018