| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| May 21, 2026 | 39554619L | RESOLVE | CLASS - 2 | 3307.6.5.7. OBSERVED SIDEWALK SHED INSTALLED AND IN USE WITHOUT REQUIRED INSTALLATION INSPECTION BY QUALIFIED PERSON.... | $2,500 | $2,500 | Nov 17, 2026 |
| May 21, 2026 | 39554617H | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A #7 STORY NEW BUILDING, OBSERVED INADEQUATE AND MISSING EXIT SIGNS AND... | $0 | $0 | Aug 4, 2026 |
| May 21, 2026 | 39554615Y | RESOLVE | CLASS - 2 | OBS SWS ERECTED CONTRARY TO APPROVED ENGINEERED DRAWINGS. FILED PLANS INDICATE INSTALLATION OF FIXED CROSS BRACING @D... | $0 | $0 | Aug 4, 2026 |
| May 21, 2026 | 39554618J | RESOLVE | CLASS - 2 | 3314.4.3.3. OBSERVED SUPPORTED SCAFFOLD ERECTED &/OR MODIFIED WITHOUT REQUIRED INSTALLATION INSPECTION REPORT. NO SIG... | $2,500 | $2,500 | Nov 17, 2026 |
| May 21, 2026 | 39554611R | RESOLVE | CLASS - 1 | OBS SUPPORTED SCAFFOLD INSTALL @ EXPOS.1 & 3.NOT FULLY PLANKED/DECKED,EXCESSIVE GAPS/OPENINGS BETWEEN PLATFORM&BUILDI... | $2,500 | $2,500 | Nov 17, 2026 |
| May 21, 2026 | 39554612Z | RESOLVE | CLASS - 1 | OBSERVED INADEQUATE HOUSEKEEPING THROUGHOUT ROOF WORK AREA. LOOSE LUMBER, PALLETS, CINDER BLOCKS, METAL PIECES, DEBRI... | $2,500 | $2,500 | Nov 17, 2026 |
| May 21, 2026 | 39554613K | RESOLVE | CLASS - 1 | 3301.4 AT TIME OF INSPECTION ON AN ACTIVE JOBSITE, OBSERVED CONCRETE EMBEDDED STRAPS INSTALLED ON THE CEILING THROUGH... | $5,000 | $5,000 | Nov 17, 2026 |
| May 21, 2026 | 39554614M | RESOLVE | CLASS - 2 | 3306.9.12.1 OBSERVED FLOOR OPENING/HOLE GREATER THAN 2 INCHES NOT SUBSTANTIALLY COVERED OR SECURED. PLYWOOD COVER NOT... | $2,500 | $2,500 | Nov 17, 2026 |
| May 21, 2026 | 39554616X | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION ON AN ACTIVE JOBSITE OF A 7 STORY NEW BUILDING, OBSERVED EVIDENCE OF SMOKING ON THE 2ND FLOOR. ... | $1,250 | $1,250 | Mar 8, 2027 |
| Apr 24, 2026 | 39553449N | RESOLVE | CLASS - 2 | IT WAS OBSERVED THAT SITE HAS A ERECTED CONSTRUCTION FENCE ON EXP 1. AT TIME OF INSPECTION FENCE WAS FOUND TO HAVE A ... | $0 | $0 | Jun 30, 2026 |
| Apr 24, 2026 | 39553459R | RESOLVE | CLASS - 2 | IT WAS OBSERVED THAT SIDEWALK SHED ON EXP 1 DOES NOT CONFORM TO PLANS. SPECIFICALLY, THE CROSS BRACING COMPONENTS UTI... | $0 | $0 | Jun 30, 2026 |
| Apr 24, 2026 | 39553458P | RESOLVE | CLASS - 2 | OBSERVED SITE NOT IN COMPLIANCE WITH FDNY REGULATIONS. MULTIPLE FIRE EXTINGUISHERS LOCATED THROUGH CONSTRUCTION SITE ... | $2,500 | $2,500 | Oct 6, 2026 |
| Apr 24, 2026 | 39553457N | RESOLVE | CLASS - 2 | OBSERVED NEEDLE BEAMS ON EXP 2 & 4 TO BE INSTALLED CONTRARY TO PLANS. PLANS REQUIRE 2 SHORING POST BE INSTALLED DIREC... | $0 | $0 | Jun 30, 2026 |
| Feb 9, 2026 | 39550129K | RESOLVE | CLASS - 2 | 3307.6.5.1 CLOSED 7 STORY NB CONSTRUCTION SITE. OBSERVED SWS @EXPO1 NUMEROUS MUDSILLS ARE UNMAINTAINED AND DISLODGING... | $5,000 | $5,000 | Mar 23, 2027 |
| Dec 22, 2025 | 39548368P | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OF ACTIVE CONSTRUCTION JOB SITE OBSERVED ALTERNATE SITE SAFETY COORDINATOR AT SITE(JIANG... | $12,500 | $12,500 | Mar 3, 2026 |
| Dec 22, 2025 | 39548369R | RESOLVE | CLASS - 1 | BC 3310.3-SITE SAFETY PLAN-AT THE TIME OF MY INSPECTION OF ACTIVE CONSTRUCTION JOB SITE -UPON ASKING FOR SUPERSTRUCTU... | $5,000 | $5,000 | Mar 3, 2026 |
| Dec 22, 2025 | 39548371X | RESOLVE | CLASS - 1 | AT THE TIME OF MY INSPECTION OBSERVED NEEDLE BEAMS INSTALLED AT EXP#4 PERMIT#Q01310373 CONTRARY TO PLANS-AS PER PLAN ... | $6,250 | $6,250 | Mar 3, 2026 |
| Dec 16, 2025 | 39548005X | RESOLVE | CLASS - 2 | BC 3307.2.1 DOT PERMITS: DURING INSPECTION OF A 7 STORY BUILDING WITH AN ACTIVE DELIVERY AT EXPOSURE #1 WITH SEVERAL ... | $2,500 | $2,500 | Jan 12, 2027 |
| Dec 16, 2025 | 39548003M | RESOLVE | CLASS - 2 | 28-105.12.8 WHERE A SITE SAFETY PLAN IS REQUIRED BY CODE OR BY THE DEPARTMENT, ALL WORK SHALL ADHERE TO THE SITE SAFE... | $1,250 | $1,250 | Jan 12, 2027 |
| Dec 16, 2025 | 39548004Y | RESOLVE | CLASS - 2 | BC 3307.4.7 PEDESTRIAN PROTECTION: DURING INSPECTION OF AN ACTIVE 7 STORY BUILDING, PERFORMING A DELIVERY, I OBSERVED... | $2,500 | $2,500 | Jan 12, 2027 |
| Oct 27, 2025 | 39546356Z | RESOLVE | CLASS - 2 | OBSERVED MISSING WINDOW PROTECTION AT THE NEIGHBORING PROPERTY AT EXPOSURE 2 AND 4, THIS CREATES UNSAFE CONDITIONS TO... | $2,530 | $2,530 | Nov 10, 2026 |
| Oct 27, 2025 | 39546355R | RESOLVE | CLASS - 2 | OBSERVED SIDEWALK SHED WITH INADEQUATE OVERHEAD PROTECTION, SIDEWALK SHED FAILS TO BE TIGHTLY AGAINST THE FACE OF ABU... | $2,430 | $2,430 | Nov 10, 2026 |
| Sep 16, 2025 | 39544997J | RESOLVE | CLASS - 2 | RESPONDING AN INCIDENT WHERE CONCRETE TRUCK HIT AND DRAG SIDEWALK SHED TO ROADWAY AND PARTIALLY COLLAPSE, INSPECTION ... | $5,000 | $5,000 | Sep 3, 2026 |
| Sep 16, 2025 | 39544999N | RESOLVE | CLASS - 1 | RESPONDING AN INCIDENT WHERE CONCRETE TRUCK HIT AND DRAG SIDEWALK SHEDTO ROADWAY AND PARTIALLY COLLAPSE, INSPECTION R... | $5,000 | $5,000 | Sep 3, 2026 |
| Sep 16, 2025 | 39544998L | RESOLVE | CLASS - 1 | RESPONDING AN INCIDENT WHERE CONCRETE TRUCK HIT AND DRAG SIDEWALK SHEDTO ROADWAY AND PARTIALLY COLLAPSE, INSPECTION R... | $2,500 | $2,500 | Sep 3, 2026 |
| Sep 15, 2025 | 39544875L | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A PROPOSED 7 STORY BUILDING I OBSERVED NO GUARDRAILS AT EXPOSURE 3 WHERE A FALL OF GREATER T... | $5,000 | $5,000 | Sep 3, 2026 |
| Jul 21, 2025 | 39542638Z | RESOLVE | CLASS - 2 | BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS. AT TIME OF INSPECTION OBSERVED: EXCAVATION/FOUNDATION WORK I... | $0 | $0 | Jun 8, 2026 |
| Jul 21, 2025 | 39542637R | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OBSERVED: EXCAVATION/FOUNDATION WORK IN PROGRESS IN A PROPOSED 7 STORY NEW BUILDING. WORK CONTR... | $0 | $0 | Sep 30, 2025 |
| Jul 21, 2025 | 39542636P | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OBSERVED: PROPOSED 7 STORIES NEW BUILDING AT EXCAVATION/FOUNDATION STAGE UNDER PERMIT # Q008932... | $12,500 | $12,500 | Sep 24, 2026 |
| Feb 21, 2025 | 39537186K | RESOLVE | CLASS - 2 | OBSERVED CONSTRUCTION FENCE GATE AT EXP. #1 SWAYING IN WIND & LEANING OFF POST IN DANGER OF OPENING/FALLING ONTO PUBL... | $1,000 | $0 | Mar 26, 2026 |
| Sep 27, 2024 | 39532863X | RESOLVE | CLASS - 2 | BC 3307.2 STREETS, INCLUDING BICYCLE LANES AND SIDEWALKS, AS WELL AS WALKWAYS AND PATHWAYS. INSPECTION OF A DEMO JOB ... | $625 | $0 | May 6, 2025 |
| Aug 13, 2024 | 39531362N | RESOLVE | CLASS - 1 | 3307.4 WARNING SIGNS, PERSONNEL, AND BARRIERS. 1 STR BLDG UNDER DEMOLITION W/ A DUMP-TRUCK PARTIALLY BACKED INTO THE ... | $2,500 | $0 | Mar 6, 2026 |
| Aug 13, 2024 | 39531363P | RESOLVE | CLASS - 2 | BC 3303.7.2 FIRE EXTINGUISHERS. OBSERVED 1 STR BLDG UNDER DEMOLITION WITH ACTIVE DEMOLITION WORK ON ROOF- ONLY 1 FIRE... | $625 | $0 | Sep 23, 2025 |
| Aug 13, 2024 | 39531359M | RESOLVE | CLASS - 1 | 1 STR BLDG-3 ADJND SCTNS (LEFT, RIGHT, REAR) UNDER DEMO W/ DM WORK PRFMD OUT OF SEQNC- REAR SCTN W/ RF, EXP#3 EXTR WA... | $625 | $0 | Mar 25, 2025 |
| Aug 13, 2024 | 39531360J | RESOLVE | CLASS - 1 | OBSVD 1 STR BLDG UNDER ACTIVE DEMO WITH COMMENCED & UNFINISHED DEMO WORK AT EXP#1 W/ EXTERIOR WALL PARTIALLY DEMOLISH... | $1,250 | $0 | Mar 25, 2025 |
| Aug 13, 2024 | 39531361L | RESOLVE | CLASS - 1 | OBSERVED 1 STR BUILDING UNDER ACTIVE DEMOLITION WITH COMMENCED & UNFINISHED DEMOLITION WORK AT EXPS# 1, 2 & 4, OVER T... | $5,000 | $0 | Mar 6, 2026 |
| Aug 13, 2024 | 39531364R | RESOLVE | CLASS - 1 | OBSVD 1 STR BUILDING UNDER DEMOLITION WITH WORKERS PERFORMING WORK AT THE ROOF LEVEL- APROX. 10-12 FT ABOVE GRADE- WI... | $2,500 | $0 | Mar 6, 2026 |
| Aug 13, 2024 | 39531365Z | RESOLVE | CLASS - 1 | BC 3301.13.8 INSPECTION BY THE CS. OBSVD 1 STR BLDG UNDER DEMO W/ MULTIPLE HAZARDOUS & VIOLATING CONDITIONS SUCH AS D... | $0 | $0 | Sep 22, 2025 |
| Jul 8, 2024 | 39118642Z | RESOLVE | CLASS - 1 | DEMO OF BUILDING STARTED NO PERMITS ON FILE, JOB# Q00847621 FOR DEMO APPLICATIONS APPROVED ONLY, NOT PERMITTED 5-14-2... | $625 | $0 | Sep 2, 2025 |
| Apr 29, 2024 | 39112976L | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING: THE MASONRY AT THE FRONT IS BULGING CRACKED, ALSO AT EXPOSURE 4 THE CMU HAS A STEP CRAC... | $1,250 | $0 | Jul 15, 2025 |
| Nov 15, 2021 | 35566025R | RESOLVE | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453837L ISSUED ON 1/26/2020 AND TO F... | $1,250 | $0 | May 18, 2022 |
| Sep 1, 2021 | 35536266K | RESOLVE | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453837L ISSUED ON 1/26/2020 AND TO F... | $3,125 | $0 | Nov 30, 2021 |
| Jul 8, 2021 | 35534018M | RESOLVE | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER CONTAINED IN SUMMONS/VIOLATION#35453837L ISSUED ON 1/26/2020 AND TO F... | $1,250 | $0 | Nov 16, 2021 |
| May 5, 2021 | 35530378H | RESOLVE | CLASS - 2 | OCCUPANCY CONTRARY TO THAT ALLOWED BY THE C OF O OR DOB RECORDS FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINE... | $3,125 | $0 | Jul 27, 2021 |
| Mar 12, 2021 | 35528008H | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/COMMISSIONER'S ORDER CONTAINED IN SUMMONS/V35453837L ISSUED1/26/20&TO FILE C/C PURSUANT TO28-201.... | $1,250 | $0 | Jun 1, 2021 |
| Dec 21, 2020 | 35525051J | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35453837L ISSUED ON 01/26/20 & TO FILE A CERT OF CORREC... | $1,250 | $0 | Apr 13, 2021 |
| Oct 28, 2020 | 35502765J | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35453837L ISSUED ON 01/26/20 & TO FILE A CERT OF CORREC... | $1,250 | $0 | Oct 17, 2023 |
| Mar 24, 2020 | 35517322M | RESOLVE | CLASS - 2 | FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN SUMMONS/VIO#35453837L ISSUED ON 01/26/20 & TO FILE A CERT OF CORREC... | $3,125 | $0 | Nov 10, 2020 |
| Feb 21, 2020 | 39018107Z | RESOLVE | CLASS - 1 | I OBSERVED ON COMMERCIAL STOVE IN COMMERCIAL GAS FLEX CONNECTOR ON NON MOBILE COMMERCIAL COOKING AND FUTURE GAS CONNE... | $3,125 | $0 | Jan 5, 2021 |
| Feb 21, 2020 | 39018105P | RESOLVE | CLASS - 1 | I OBSERVED IN COMMERCIAL KITCHEN AS PER PLANS REMOVAL OF GAS SHUT OFF VALVE AND COMMERCIAL FRYING EQUIPMENT WHICH WAS... | $6,250 | $0 | Jan 5, 2021 |