ECB violations
Forest Hill Co Op Building 1, Queens • Block 02159 • Lot 0002
69 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jun 23, 2026 | 39193426Y | ACTIVE | CLASS - 1 | REPAIR AND RESTORE TO SERVICE. | $1,250 | $1,250 | Sep 1, 2026 |
| Jun 23, 2026 | 39193425M | ACTIVE | CLASS - 1 | REPAIR AND RESTORE TO SERVICE. | $1,250 | $1,250 | Sep 1, 2026 |
| Jun 16, 2026 | 39195825K | ACTIVE | CLASS - 1 | 1) BRAKE TAG IS EXPIRED (8.11.1.6) 2) AN ELEVATOR IN SECTION OF BUILDING OR BUILDING IS OUT-OF-SERVICE. UPON INSPECTI... | $1,250 | $1,250 | Sep 22, 2026 |
| Jun 16, 2026 | 35686023J | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING IN CODE-COMPLIANT MANNER(PASSENGER ELEVATOR EQUIPMENT). AT TIME OF INSPECTION, OBSERVED ... | $1,250 | $1,250 | Aug 25, 2026 |
| Jun 16, 2026 | 39195824Z | ACTIVE | CLASS - 1 | AN ELEVATOR IN SECTION OF BUILDING OR BUILDING IS OUT-OF-SERVICE. UPON INSPECTION THE DEVICE IS FOUND TO BE OUT-OF-SE... | $1,250 | $1,250 | Sep 22, 2026 |
| Apr 20, 2026 | 37036653M | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $3,155 | $3,155 | Jul 28, 2026 |
| Mar 19, 2026 | 39181008N | ACTIVE | CLASS - 1 | CLASS 1 RTS:FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. SERVICE ELEVATOR EQUIPMENT AS PER BC3001.2 & 27-98... | $1,250 | $1,250 | Jan 19, 2027 |
| Dec 11, 2025 | 39547856J | ACTIVE | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.... | $6,250 | $6,250 | Dec 4, 2026 |
| Nov 5, 2025 | 39546662R | ACTIVE | CLASS - 2 | OBSERVED PARAPET PANEL AT EXP4 AT THE VERGE OF COLLAPSING ONTO NEIGHBORING PLAYGROUND. THIS CREATES UNSAFE CONDITIONS... | $2,400 | $2,400 | Feb 10, 2026 |
| Oct 15, 2025 | 39545989Y | ACTIVE | CLASS - 1 | 3307. 6.5 OBSERVED SEVERAL PARAPET PANELS AT EXPOSURE 1 DISLODGED ON THE GROUND, LOOSE PANELS CREATE UNSAFE CONDITION... | $10,000 | $10,000 | Dec 15, 2026 |
| Oct 15, 2025 | 39545987K | ACTIVE | CLASS - 1 | BC 3307.6.5 OBSERVED SIDEWALK SHED PARAPET PANELS AT EXPOSURE 1&2 W/DETERIORATING WOOD, LOOSE SCREWS, & LOOSE PANELS,... | $10,000 | $10,000 | Dec 15, 2026 |
| Jun 5, 2025 | 39150198L | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING - APPURTENANCES - TEMPORARY BOILER AT EXPOSURE 1 IS DRIPPING DIESEL FUEL ONTO THE STREET... | $25,000 | $25,000 | Mar 4, 2027 |
| Apr 8, 2025 | 37034469N | ACTIVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8C AND 9C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTE... | $6,250 | $6,250 | Jun 24, 2025 |
| Jan 10, 2025 | 35689495L | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING EXTERIOR WALLS FACADE AND APPURTENANCES. OBSERVED AT EXPOSURE 1 EAST ELEVATION DAMAGED C... | $12,500 | $12,500 | Sep 8, 2026 |
| Dec 18, 2024 | 35689364L | RESOLVE | CLASS - 1 | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER #35686836R REQUESTIG TO TAKE SAFETY MEASURES ADEQUATELY AT EXPOSURE 1(NOR... | $6,250 | $6,250 | Feb 25, 2025 |
| Oct 29, 2024 | 35686836R | RESOLVE | CLASS - 1 | FAILURE TO TAKE/PROVIDE REQUIRED ACTION TO SECURE PUBLIC SAFETY AT A DESIGNATED UNSAFE BUILDING FACADE AS PER TECHNIC... | $0 | $0 | Jul 10, 2025 |
| Oct 15, 2024 | 35683325L | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS; ATOI OBSERVED WORK AREA ON ROOF NOT... | $10,000 | $10,000 | Jun 11, 2026 |
| Oct 1, 2024 | 37030369H | ACTIVE | CLASS - 1 | FAILURE TO SUBMIT THE REQUIRED PARKING STRUCTURE INITIAL OBSERVATION REPORT FOR AN EXISTING PARKING STRUCTURE DOCUMEN... | $12,500 | $12,500 | Feb 11, 2025 |
| Aug 7, 2024 | 39121111R | ACTIVE | CLASS - 2 | FAILURE TO REPAIR UNDER GROUND STEAM PIPE LEAKING STEAM CREATING A NUISANCE TO BUILDING TENANTS WITH WINDOWS FACING T... | $625 | $625 | Dec 3, 2024 |
| Jul 18, 2024 | 35683732Z | ACTIVE | CLASS - 1 | FAILURE TO PROVIDE SIDEWALK SHED WHERE REQUIRED. AT TIME OF INSPECTION, I OBSERVED INADEQUATE SAFETY MEASURES AT EXPO... | $10,000 | $10,000 | Aug 26, 2025 |
| Jun 12, 2024 | 39529539R | RESOLVE | CLASS - 2 | DURING INSPECTION OF A SIDEWALK SHED, I OBSERVED ELECTRICAL WIRING AND ILLUMINATED BULBS INSTALLED UNDERNEATH. DOB RE... | $3,125 | $3,125 | Aug 20, 2024 |
| Jun 12, 2024 | 39529554P | RESOLVE | CLASS - 1 | DURING INSPECTION I OBSERVED THAT THERE WERE BROKEN AND SHATTERED PIECES OF BRICK THAT WAS NOT CONTAINED OR CLEANED U... | $0 | $0 | Jun 9, 2026 |
| Jun 12, 2024 | 39529553N | RESOLVE | CLASS - 2 | 3303.4.7 STORAGE NEAR SIDEWALKS, WALKWAYS, AND PATHWAYS: DURING INSPECTION OF AN APARTMENT COMPLEX THERE WERE SEVERAL... | $0 | $0 | Jun 9, 2026 |
| May 28, 2024 | 35685286R | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN BUILDING EXTERIOR FACADE AND APPURTENANCES. NOTE: AT TIME OF INSPECTION, I OBSERVED AT EXPOSURE #... | $0 | $0 | Jul 22, 2025 |
| Mar 4, 2024 | 39526110K | ACTIVE | CLASS - 2 | AT TIME OF RESPONDING COMPLAINT OBSERVED: SIDEWALK SHED/OVERHEAD PROTECTION INSTALLED AT PERIMETER OF THE BUILDING WI... | $2,430 | $0 | Oct 29, 2024 |
| Mar 4, 2024 | 39526109N | RESOLVE | CLASS - 2 | AT TIME OF RESPONDING COMPLAINT OBSERVED: SIDEWALK SHED INSTALLED AT EXPOSURE# 1. UPON REVIEW DEPARTMENT RECORD IT AP... | $1,280 | $0 | Oct 29, 2024 |
| Feb 2, 2024 | 35679987Z | ACTIVE | CLASS - 1 | UNLAWFUL ACT. FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. NOTE: RESPONDENT FAILURE TO COMPLY PRIOR SUMMON #35675434K... | $2,500 | $2,500 | Sep 24, 2024 |
| Jan 16, 2024 | 37026150L | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $3,125 | $3,125 | Jul 2, 2024 |
| Dec 4, 2023 | 35675435M | ACTIVE | CLASS - 2 | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. OBSERVED AT EXPOSURE #1 (EAST) SPALLED CONCRETE WITH ... | $1,250 | $1,250 | Aug 27, 2024 |
| Dec 4, 2023 | 35675434K | ACTIVE | CLASS - 1 | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. OBSERVED AT EXPOSURE #1 (WEST), EXPOSURE #2 (NORTH) A... | $2,500 | $2,500 | Aug 27, 2024 |
| Nov 16, 2023 | 39099489K | RESOLVE | CLASS - 2 | BRAKE SLEEVE WORN REPLACE DIRY PIT CLEAN | $0 | $0 | Jan 23, 2024 |
| Sep 27, 2023 | 39095908H | RESOLVE | CLASS - 2 | REPAIR AND RESTORE TO SERVICE. | $1,562 | $1,562 | Dec 5, 2023 |
| Aug 22, 2023 | 39093048H | RESOLVE | CLASS - 2 | REPAIR AND RESTORE TO SERVICE. | $312 | $312 | Aug 27, 2024 |
| Aug 14, 2023 | 39092450L | RESOLVE | CLASS - 2 | REPAIR AND RESTORE TO SERVICE. | $1,562 | $1,562 | Oct 24, 2023 |
| Jun 26, 2023 | 39089106P | ACTIVE | CLASS - 1 | REPAIR AND RESTORE TO SERVICE. | $12,500 | $12,500 | Sep 5, 2023 |
| Mar 14, 2023 | 35662292L | RESOLVE | CLASS - 2 | ELECRICAL W/O PERMIT.NOTE:AT TIME OF INSPECTION OBSERVED IN BIS SYSTEM THAT ELECTRICAL PERMIT (Q00202785-I1-EL)FOR SI... | $0 | $0 | Jun 20, 2023 |
| Jan 20, 2023 | 35670174K | ACTIVE | CLASS - 3 | FAILURE TO POST EXTERIOR WALL CONDITION CERTIFICATE AS REQUIRED UNDER 1RCNY 103.04.NOTE:AT THE TIME OF INSPECTION THE... | $500 | $500 | Mar 28, 2023 |
| Jan 20, 2023 | 35670425X | ACTIVE | CLASS - 3 | FAILURE TO POST EXTERIOR WALL CONDITION CERTIFICATE AS REQUIRED UNDER 1RCNY 103.4.NOTE:AT TIME OF INSPECTION NO CERTI... | $500 | $500 | Mar 28, 2023 |
| Dec 2, 2022 | 37024170J | ACTIVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 8A AND 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTE... | $3,125 | $3,125 | Mar 21, 2023 |
| Dec 2, 2022 | 37024168K | ACTIVE | CLASS - 2 | FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA... | $1,250 | $1,250 | Mar 21, 2023 |
| Oct 19, 2022 | 37023147R | ACTIVE | CLASS - 2 | FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE8C REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL&A... | $1,250 | $1,250 | Feb 14, 2023 |
| Aug 10, 2022 | 39067745Y | ACTIVE | CLASS - 1 | ELEVATOR IN BUILDING OUT OR SERVIVE . UPON INSPECTION THE DEVICE IS FOUND TO BE OUT OF SERVICE CREATING A HAZARDOUS C... | $3,125 | $3,125 | Mar 21, 2023 |
| Aug 4, 2022 | 39068691M | RESOLVE | CLASS - 1 | UPON INSPECTION DEVICE WAS FOUND OUT OF SERVICE . WITH THE MAIN LINE IN THE OFF POSTITION. RESTORE TO SERVICE IMMEDIA... | $500 | $500 | Nov 22, 2022 |
| Aug 4, 2022 | 39067400Z | ACTIVE | CLASS - 1 | UPON INSPECTION DEVICE WAS FOUND OUT OF SERVICE. WITH THE MAIN LINE IN THE OFF POSITION. RESTORE TO SERVICE IMMEDIATE... | $1,250 | $1,250 | Oct 25, 2022 |
| May 16, 2022 | 35586545Z | RESOLVE | CLASS - 2 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATION OBSERVED SIDEWALK SHED ERECTED AT ALL EXPOSURES AT THE PLACE O... | $5,000 | $0 | Aug 16, 2022 |
| May 5, 2022 | 39061698N | RESOLVE | CLASS - 2 | AT TWO LOCATION CONSTRUCTION AREA ACCESSIBLE FOR PEDESTRIANS/PUBLIC ,LEFT SIDE FROM THE BUILDING ENTRANCE AND AT EXPO... | $625 | $0 | Mar 21, 2023 |
| Mar 28, 2022 | 39058974N | RESOLVE | CLASS - 2 | REPAIR AND RESTORE TO SERVICE. | $625 | $625 | Aug 9, 2022 |
| Mar 15, 2022 | 35647440Z | RESOLVE | CLASS - 2 | FAILURE TO MAINTAIN BLDG EXTERIOR WALLS OR APPURTENANCES.NOTE:ATOI,OBSERVED@1)EXP2S ELEVATION (62DR),VERT CRACKED BRI... | $0 | $0 | Aug 23, 2022 |
| Feb 7, 2022 | 39068690K | RESOLVE | CLASS - 1 | UPON INSPECTION DEVICE WAS FOUND TO BE OUT OF SERVICE IN THE LOBBY NOT LEVEL WITH THE FLOOR AND CAR DOOR OPEN.RESTORE... | $1,250 | $1,250 | Nov 15, 2022 |
| Oct 8, 2021 | 37022452Z | ACTIVE | CLASS - 2 | FAILURE TO FILE ACCEPTABLE AMENDED CYCLE 7A REPORT INDICATING CORRECTION OF UNSAFE CONDITIONS DESCRIBED IN INITIAL FA... | $1,250 | $1,250 | Aug 30, 2022 |