ECB violations
75-42 113 Place, Queens • Block 02265 • Lot 0103
37 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Dec 20, 2023 | 39524258H | RESOLVE | CLASS - 2 | DURING MY INSPECTION OF 6 STORY NB, OBSERVED A SUPPORTED SCAFFOLD APPROX. 36FT HIGH AT EXPOSURE #3 WHICH WAS NOT IN U... | $0 | $0 | Jun 18, 2024 |
| Aug 30, 2023 | 39521187X | RESOLVE | CLASS - 2 | I OBSERVED A SIDE WALK SHED INSTALLED CONTRARY TO CODE. SIDEWALK SHED DID NOT COVER FULL WIDTH OF SIDEWALK AND SHED L... | $2,400 | $2,400 | Apr 16, 2024 |
| Aug 30, 2023 | 39521193M | RESOLVE | CLASS - 2 | I OBSERVED PEDESTRIAN PROTECTION(SIDE WALK SHED) WITH PIPE SCAFFOLD INSTALLED ON TOP MAINTAINED CONTRARY TO CODE. I O... | $2,400 | $2,400 | Dec 1, 2025 |
| Aug 30, 2023 | 39521192K | RESOLVE | CLASS - 2 | UPON INSPECTION OF AN ACTIVE 6 STORY NB I OBSERVED WORK NOT CONTRARY TO THE SUBMITTED SITE SAFETY PLAN. CONTRARY TO S... | $625 | $509 | Dec 1, 2025 |
| Aug 30, 2023 | 39521191Z | RESOLVE | CLASS - 2 | I OBSERVED 5 WORKERS ON SITE A SIDEWALK SHED INSTALLED AT EXPOSURE 1 AND SCAFFOLD INSTALLED AT EXPOS 1&3 (EXPO 1 ON T... | $625 | $625 | Dec 1, 2025 |
| Apr 27, 2023 | 39515903R | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF NB 6 STORY ACTIVE JOBSITE OBSERVED WORKER,CS (HAN KYU PARK),ON JOBSITE, UPON REVIEW DOB RECO... | $0 | $0 | Aug 1, 2023 |
| Apr 27, 2023 | 39515904Z | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF NB 6 STORY BUILDING ACTIVE JOBSITE OBSERVED SWS INSTALLED AT EXP1, SF INSTALLED AT EXP1,3, P... | $2,500 | $2,500 | Aug 1, 2023 |
| Mar 24, 2023 | 39514760Y | RESOLVE | CLASS - 1 | VIOLATION # 39508590J UNDER COMPLAINT # 4906449 FOR INADEQUATEUNSAFE VERTICAL NETTING AT 6TH FL, MISSING TOE-BOARDS O... | $2,500 | $2,500 | Oct 24, 2023 |
| Mar 24, 2023 | 39514759R | RESOLVE | CLASS - 1 | VIOLATION # 39508576N UNDER COMPLAINT # 4906445 WAS ISSUED ON 11/01/2022 FOR NO DESIGN DRAWINGS FOR PLATFORM. JOB SIT... | $1,250 | $1,250 | Oct 24, 2023 |
| Mar 24, 2023 | 39514742K | RESOLVE | CLASS - 1 | VIOLATION # 39508574J WAS ISSUED FOR UNSAFE SUPPORTED SCAFFOLD, AND IT IS NOT IN COMPLIANCE WITHOUT CERTIFICATE OF CO... | $1,250 | $1,250 | Oct 24, 2023 |
| Mar 24, 2023 | 39514609L | RESOLVE | CLASS - 1 | UNSAFE JOB SITE WITH PSWO IN PLACE. INADEQUATE GUARD RAIL SYSTEM, NETTING AND HOUSEKEEPING. | $2,500 | $2,500 | May 30, 2023 |
| Jan 13, 2023 | 39511635L | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION FOR A 6 STORY NEW BUILDING I OBSERVED NO COMPLIANCE FROM RESPONDENT IN REGARD TO PREVIOUSLY ISS... | $1,250 | $1,250 | Sep 12, 2023 |
| Jan 13, 2023 | 39511634J | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION FOR A 6 STORY NEW BUILDING I OBSERVED NO COMPLIANCE FROM RESPONDENT IN REGARD TO PREVIOUSLY ISS... | $1,250 | $1,250 | Sep 12, 2023 |
| Jan 13, 2023 | 39511633H | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION FOR A 6 STORY NEW BUILDING I OBSERVED NO COMPLIANCE FROM RESPONDENT IN REGARD TO PREVIOUSLY ISS... | $1,250 | $1,250 | Sep 12, 2023 |
| Nov 1, 2022 | 39508574J | RESOLVE | CLASS - 1 | OBSERVED SUPPORTED SCAFFOLD AT EXP#1,3 WITH THE FOLLOWING CONDITIONS: MISSING GUARD RAILS/TOE-BOARDS ON WORKING PLATF... | $6,250 | $6,250 | Dec 20, 2022 |
| Nov 1, 2022 | 39508590J | RESOLVE | CLASS - 1 | OBSERVED 6TH FLR VERTICAL NETTING CABLES AT THE INTERIOR STAIR OPENING LEADING EDGE AND THE EXP#1,3 LEADING EDGES WER... | $12,500 | $12,500 | Dec 20, 2022 |
| Nov 1, 2022 | 39508576N | RESOLVE | CLASS - 1 | OBSERVED TEMPORARY PLATFORMS IN ELEVATOR SHAFT AT ALL FLOORS- BUILT CONTRARY TO PE-APPROVED DD- NO WOOD LEDGER, WOOD ... | $6,250 | $6,250 | Dec 20, 2022 |
| Nov 1, 2022 | 39508575L | RESOLVE | CLASS - 2 | OBSERVED SIDEWALK SHED (SWS) AT EXP#1 AND SUPPORTED SCAFFOLDS AT EXP#1,3- NO APPROVED DESIGN DRAWINGS FOR THE SUPP SC... | $3,125 | $3,125 | Dec 20, 2022 |
| Jul 6, 2022 | 39503141L | RESOLVE | CLASS - 1 | OBSERVED 5 WORKERS ON 4TH FL DECK WORKING ON CMU, AND VENEER BRICK INSTALLATION ON THE EDGES OF THE SLAB WITHOUT ANY ... | $2,500 | $0 | Aug 23, 2022 |
| Jul 6, 2022 | 39503143P | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION 6 STORIES NEW BUILDING I OBSERVED TEMPORARY PLATFORM AT ELEVATOR SHIFT I REQUESTED DD FROM ... | $1,280 | $0 | Aug 23, 2022 |
| Jul 6, 2022 | 39503145Z | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION 6 STORIES NEW BUILDING I OBSERVED SUPPORTED SCAFFOLD AT EXP#1,3 HAS UNSAFE PLATFORM NOT TIE... | $1,280 | $0 | Aug 23, 2022 |
| Jul 6, 2022 | 39503146K | RESOLVE | CLASS - 2 | AT THE TIME OF INSPECTION 6 STORIES NEW BUILDING I OBSERVED CONSTRUCTION FENCE AT EXP#1,# UNDER PERMIT #Q00293427 EXP... | $1,280 | $0 | Aug 23, 2022 |
| Jul 6, 2022 | 39503144R | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION 6 STORIES NB I OBSERVED 2 WORKERS ON 3RD FL REMOVING PART OF CONCRETE SLAB DECK AND WELDING... | $2,500 | $0 | Aug 23, 2022 |
| Jul 6, 2022 | 39503133L | RESOLVE | CLASS - 2 | OBSERVED INADEQUATE LOGS NO ACTUAL ORIENTATIONS FOR ALL WORKERS, SUPERINTENDENT TIME IN/OUT, PRE SHIFT MEETING, AND T... | $5,000 | $5,000 | Aug 23, 2022 |
| Jul 6, 2022 | 39503142N | RESOLVE | CLASS - 1 | AT THE TIME OF INSPECTION 6 STORIES NEW BUILDING ABOUT 7 WORKERS I REQUEST SITE SAFETY ORIENTATIONS TO BE PROVIDED ON... | $625 | $625 | Jan 24, 2023 |
| May 5, 2022 | 35586542N | RESOLVE | CLASS - 2 | TEMPORARY EQUIPMENT ONSITE(SWS)EXPIRED PERMIT.OBSERVED SIDEWALK SHED STILL UP AT EXP1.TEMPORARY CONSTRUCTION EQUIPMEN... | $0 | $0 | Nov 29, 2022 |
| Nov 5, 2020 | 35499308J | RESOLVE | CLASS - 2 | PEDESTRIAN PROTECTION DOES NOT MEET CODE SPECIFICATIONS. NOTE:AT TIME OF MY INSPECTION OBSERVED SIDEWALK SHED INSTALL... | $5,000 | $0 | Jan 26, 2021 |
| Mar 5, 2020 | 35466973Z | RESOLVE | CLASS - 2 | HOUSEKEEPING.AT THE TIME OF INSPECTION OF AN ACTIVE 6 STORY BUILDING CONSTRUCTION SITE I OBSERVED OF CONSTRUCTION MAT... | $1,250 | $1,250 | Aug 3, 2021 |
| Feb 15, 2020 | 35470299H | RESOLVE | CLASS - 2 | PROJECT INFORMATION PANEL/SIDEWALK SHED PARAPET PANEL/CONSTRUCTION SIGN NOT PROVIDED OR NOT IN COMPLIANCE W/SECTION. ... | $0 | $0 | Apr 28, 2020 |
| Jan 30, 2020 | 35445062P | RESOLVE | CLASS - 2 | BC3301.7/FAILURE TO PROVIDE PRE APPROVED DETAIL DRAWINGS.AS NOTED AT TIME OF INSPECTION ON A ACTIVE CONSTRUCTION SITE... | $1,250 | $1,250 | Jun 1, 2021 |
| Jan 30, 2020 | 35445061N | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS OR PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS.AS NOTED:AT TIME OF INSPECTION AT AN... | $5,000 | $5,000 | Jun 1, 2021 |
| Jan 30, 2020 | 35445063R | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.AS NOTED:AT TIME OF INSPECTION AN... | $0 | $0 | Jun 1, 2021 |
| Dec 12, 2019 | 35462689N | RESOLVE | CLASS - 1 | 3307.2.1 OBSTRUCTION OF STREET OR SIDEWALK @THE TIME OF INSPECTION @4STY NB I OBSERVED MATERIALS TIED TOGETHER WITH C... | $625 | $625 | Mar 23, 2021 |
| Dec 12, 2019 | 35462688L | RESOLVE | CLASS - 1 | 3307.7.7 CONDITION OF FENCE @THE TIME OF INSPECTION @A 4STY NB I OBSERVED A POORLY MAINTAINED CONST FENCE. PANELS FRO... | $2,500 | $2,500 | Mar 23, 2021 |
| Oct 2, 2019 | 35444680H | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/ARE AMENDMENTS, AS NOTED @TIME OF MY INSPECTION, ACTIVE ... | $0 | $0 | Dec 17, 2019 |
| Oct 2, 2019 | 35444679K | RESOLVE | CLASS - 2 | BC 3301.7 FAILURE TO PROVIDE PE APPROVED DESIGN DRAWING AS NOTED @TIMEOF MY INSPECTION. ACTIVE SITE, FOUNDATION LVL I... | $0 | $0 | Dec 17, 2019 |
| Sep 12, 2019 | 35444707Z | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMENDMENTS. AS NOTED AT TIME OF MY INSPECTION OBSERVE... | $0 | $0 | Nov 26, 2019 |