Maintenance code violations
119-40 Union Turnpike, Queens • Block 03348 • Lot 0028
101 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1R | Sep 2, 2022 |
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2E | Sep 2, 2022 |
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3E | Sep 2, 2022 |
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1G | Sep 2, 2022 |
| Jul 29, 2022 | B | CERTIFICATION POSTPONMENT GRANTED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1T | Sep 16, 2022 |
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3A | Sep 2, 2022 |
| Jul 29, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3C | Sep 2, 2022 |
| Jul 27, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 6K | Oct 30, 2022 |
| Jul 27, 2022 | C | VIOLATION DISMISSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE DUE TO INOPE... | 6K | Aug 22, 2022 |
| Jul 27, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FRO... | 6K | Aug 22, 2022 |
| Jul 27, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6K | Aug 31, 2022 |
| Jul 27, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 6K, 6th STORY, 4th APARTMENT FROM N... | 6K | Aug 22, 2022 |
| Jul 22, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6N | Aug 26, 2022 |
| Jul 22, 2022 | B | INVALID CERTIFICATION | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2U | Aug 26, 2022 |
| Jul 22, 2022 | B | INVALID CERTIFICATION | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6P | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2R | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4T | Aug 26, 2022 |
| Jul 22, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 1Q | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6Q | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3P | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6R | Aug 26, 2022 |
| Jul 22, 2022 | B | INVALID CERTIFICATION | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4N | Aug 26, 2022 |
| Jul 22, 2022 | B | INVALID CERTIFICATION | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3T | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 5Q | Aug 26, 2022 |
| Jul 22, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3Q | Aug 26, 2022 |
| Jul 14, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 6A | Aug 18, 2022 |
| Jul 14, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 4D | Aug 18, 2022 |
| Jul 14, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 1E, 1st STORY, 1st APARTMENT FRO... | 1E | Aug 9, 2022 |
| Jul 14, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 1E | Oct 17, 2022 |
| Jul 14, 2022 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM SOUTH AT WEST WALL IN THE F... | 1E | Oct 17, 2022 |
| Jul 14, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FRO... | 5A | Aug 9, 2022 |
| Jul 14, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2J | Aug 18, 2022 |
| Jul 14, 2022 | C | VIOLATION DISMISSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 5A | Aug 9, 2022 |
| Jul 14, 2022 | A | VIOLATION DISMISSED | § 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION AT 1st DOOR FRAME FROM EAST AT SOUTH WALL IN THE F... | 5A | Oct 17, 2022 |
| Jul 14, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 5A | Oct 17, 2022 |
| Jul 14, 2022 | C | NOV SENT OUT | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 5A | Aug 7, 2022 |
| Jul 14, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3F | Aug 18, 2022 |
| Jul 14, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2A | Aug 18, 2022 |
| Jul 14, 2022 | B | NOV SENT OUT | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 3K | Aug 18, 2022 |
| Jul 14, 2022 | C | NOV SENT OUT | § 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS ... | 1E | Aug 7, 2022 |
| Jul 14, 2022 | B | CERTIFICATION POSTPONMENT DENIED | § 27-2056.7, 27-2056.17 AND 27-2056.8 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS... | 2D | Aug 18, 2022 |
| Jul 14, 2022 | C | VIOLATION DISMISSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 5A, 5th STORY, 2nd APARTMENT FROM W... | 5A | Aug 9, 2022 |
| Jun 29, 2022 | C | NOV SENT OUT | § 27-2056.4 ADM CODE- CORRECT FAILURE TO NOTIFY OCCUPANTS AND/OR TO INVESTIGATE LEAD-BASED PAINT HAZARDS. | 6G | Jul 3, 2022 |
| Jun 29, 2022 | C | NOV SENT OUT | § 27-2056.7 ADM CODE: CORRECT FAILURE TO PROVIDE TO THE DEPARTMENT WITHIN 45 DAYS OF DEMAND ALL RECORDS REQUIRED TO B... | 6G | Jul 3, 2022 |
| May 13, 2022 | C | VIOLATION DISMISSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE ,, IN THE EN... | 6K | Jun 8, 2022 |
| Sep 17, 2019 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT CEILING AND ALL WALLS AT ROO... | — | Dec 21, 2019 |
| Sep 17, 2019 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE ROOF BULKHEAD CEILING , 6th STORY | — | Oct 22, 2019 |
| Sep 17, 2019 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE ROOF BULKHEAD CEILING AND SOUTH WALL... | — | Oct 22, 2019 |
| Sep 16, 2019 | B | VIOLATION DISMISSED | § 27-2005, 2007 ADM CODE REMOVE ALL ENCUMBRANCES CONSISTING OF HOSES, RUGS AND CONSTRUCTION MATERIAL AT PUBLIC HALL S... | — | Oct 21, 2019 |
| Sep 16, 2019 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK PUBLIC HALL STAIR B AT SOUTH WALL AND CEILING AT PUBLIC H... | — | Oct 21, 2019 |