ECB violations
31-23 Linden Place, Queens • Block 04409 • Lot 0018
7 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Dec 15, 2023 | 39524126X | RESOLVE | CLASS - 1 | @6STORY NB SITE IN EXCAVATION PHASE OBSERVE SIDEWALK CRACKED-UNEVEN/NOT LEVELED&WITHIN, SITE PILES OF GARBAGE/DEBRIS ... | $2,500 | $2,500 | Jul 23, 2024 |
| Dec 15, 2023 | 39524125Y | RESOLVE | CLASS - 1 | BC 3309.9 WEATHERPROOF INTEGRITY OF ADJOINING BUILDINGS.@6STORY NB SITE IN SOE-EXCAVATION PHASE OBSERVE ADJOIN PROPER... | $5,000 | $5,000 | Jul 23, 2024 |
| Nov 1, 2023 | 39523060H | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION OF A PROPOSED 6 STORY BUILDING AT SOE PHASE, THE CONSTRUCTION FENCE WAS MISSING PLEXIGLASS AND ... | $2,500 | $2,500 | May 13, 2025 |
| Nov 1, 2023 | 39523059K | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A PROPOSED 6 STORY BUILDING, I OBSERVED A DRILL ONSITE. REVIEW OF DOB RECORDS INDICATED THAT... | $2,500 | $2,500 | Mar 5, 2024 |
| Nov 1, 2023 | 39523058Z | RESOLVE | CLASS - 1 | AT TIME OF INSPECTION OF A SITE AT SOE PHASE, I OBSERVED THAT THE SIDEWALK WAS CRACKED UP AND UNEVEN. THIS CAN CAUSE ... | $2,500 | $2,500 | Nov 12, 2024 |
| Jul 20, 2023 | 39519549L | RESOLVE | CLASS - 2 | OBSERVE PERMITTED JOB FENCE IN PLACE AND AT EXPOSURE#2 REAR TO ADJACENT PROPERTY REAR YARD OBSERVE JOB FENCE PLYWOOD ... | $0 | $0 | Sep 26, 2023 |
| Dec 14, 2022 | 39510357X | RESOLVE | CLASS - 1 | AT TIME OF MY INSPECTION I OBSERVED 2 STORY HOUSE BEEN DEMOLISHED,SEARCH OF DOB RECORDS SHOW NO NOTIFICATION AS REQUI... | $2,500 | $2,500 | Feb 21, 2023 |