Maintenance code violations
34 Avenue, Queens • Block 04995 • Lot 0001
2,469 records
HPD grades a violation A for non-hazardous through C for immediately hazardous.
| Issued | Class | Status | Violation | Apartment | Correct by |
|---|---|---|---|---|---|
| May 26, 2022 | B | VIOLATION WILL BE REINSPECTED | § 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF KEY OPERATED LOCK AT DOOR TO ROOM WITH FIRE ESCAPE ... | 5LL | Jun 30, 2022 |
| May 16, 2022 | B | VIOLATION DISMISSED | § 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT BATHTUB IN THE BATHROOM LOCATED AT APT 2LL, 1st STORY... | 2LL | Jun 20, 2022 |
| May 16, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 2LL | Aug 19, 2022 |
| May 16, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ... | 2LL | Jun 20, 2022 |
| May 16, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE EAST WALL IN TH... | 2LL | Jun 20, 2022 |
| May 16, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE WEST WALL, CEIL... | 2LL | Jun 20, 2022 |
| May 12, 2022 | B | VIOLATION WILL BE REINSPECTED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQUARE FEET CEILING IN THE BAT... | 6BB | Jun 16, 2022 |
| May 12, 2022 | B | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... 4 SQUARE FEET, FLOOR OF BASE CAB... | 4DD | Jun 16, 2022 |
| May 3, 2022 | B | VIOLATION CLOSED | § 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B... | 4S | Jun 7, 2022 |
| May 3, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 4S | Aug 6, 2022 |
| May 3, 2022 | C | VIOLATION CLOSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE AT STAIR CAS... | — | May 29, 2022 |
| May 3, 2022 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 4S | May 29, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4AA | Jun 1, 2022 |
| Apr 27, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 3H | Jul 31, 2022 |
| Apr 27, 2022 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6F | Jun 1, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 7S | Jun 1, 2022 |
| Apr 27, 2022 | C | VIOLATION CLOSED | § 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT... | 3H | May 23, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 7G | Jun 1, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3FF | Jun 1, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6K | Jun 1, 2022 |
| Apr 27, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4A | Jun 1, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5K | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4J | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4G | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3K | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3J | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3D | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2M | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2G | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2C | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5S | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6D | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6S | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 6R | May 25, 2022 |
| Apr 20, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 7L | May 25, 2022 |
| Apr 18, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 3MM | May 23, 2022 |
| Apr 18, 2022 | A | VIOLATION DISMISSED | § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES I... | 4JJ | Jul 22, 2022 |
| Apr 18, 2022 | A | VIOLATION CLOSED | § 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... APPROXIMATELY 8 SQUARE FEET AT T... | 4JJ | Jul 22, 2022 |
| Apr 18, 2022 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES LOCATED AT APT 4JJ, 3rd STORY, 4th APARTMENT FR... | 4JJ | May 14, 2022 |
| Apr 18, 2022 | C | VIOLATION CLOSED | HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE LOCATED AT APT 4JJ, 3rd STORY, 4th APARTMENT FROM ... | 4JJ | May 14, 2022 |
| Apr 18, 2022 | B | VIOLATION DISMISSED | § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR INOPERABLE LOCATED AT APT 4JJ, 3rd STORY, 4th APARTMENT FROM ... | 4JJ | May 23, 2022 |
| Apr 18, 2022 | B | VIOLATION DISMISSED | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). INOPERABLE LOCATED AT APT 4JJ, 3rd STORY,... | 4JJ | May 23, 2022 |
| Apr 18, 2022 | C | VIOLATION DISMISSED | § 27-2005, 27-2007, 27-2041.1 HMC: REPLACE OR REPAIR THE SELF-CLOSING DOORS THAT IS MISSING OR DEFECTIVE .. IN THE EN... | 4JJ | May 14, 2022 |
| Apr 18, 2022 | B | VIOLATION DISMISSED | § 27-2005 ADM CODE PROPERLY REPAIR THE BROKEN OR DEFECTIVE MORTISE LOCK AT THE DOOR IN THE ENTRANCE LOCATED AT APT 4J... | 4JJ | May 23, 2022 |
| Apr 18, 2022 | A | VIOLATION DISMISSED | § 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL .. IN THE BATHROOM LOC... | 4JJ | Jul 22, 2022 |
| Apr 18, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2JJ | May 23, 2022 |
| Apr 18, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 2GG | May 23, 2022 |
| Apr 14, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 7GG | May 19, 2022 |
| Apr 14, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 4CC | May 19, 2022 |
| Apr 14, 2022 | B | VIOLATION CLOSED | § 27-2056.7 AND 27-2056.17 ADM CODE - CERTIFY COMPLIANCE WITH LEAD-BASED PAINT HAZARD CONTROL REQUIREMENTS DURING PER... | 5CC | May 19, 2022 |