132-27 Pople Avenue, Queens • Block 05102 • Lot 0049

20 records

Environmental Control Board violations, which carry a hearing and a penalty.

Issued Violation Status Severity Description Penalty Balance due Hearing
Dec 17, 2024 39535198Z RESOLVE CLASS - 2 OBSERVED 5 STORY ACTIVE SITE, WORKERS IN SITE, WHEN ATTEMPTED TO GET INTO THE SITE ONE WORKERS CLOSED THE FENCE DOOR ... $1,250 $1,250 Aug 7, 2025
Dec 9, 2024 39534957X RESOLVE CLASS - 2 OBSERVED COMBUSTIBLE DEBRIS & CONCRETE DEBRIS, ON THE FIRST FLOOR AT EXPOSURE #1, PILED AGAINST CONSTRUCTION FENCE & ... $0 $0 Feb 18, 2025
Oct 3, 2024 39533104J RESOLVE CLASS - 2 OBSVD 5 STR NB WITH UNFINISHED EXTERIOR WALL WATERPROOFING WORK, FACADE WORK + PARAPET WALL COPING INSTALLATION IN MU... $0 $0 Jul 14, 2026
Oct 3, 2024 39533105L RESOLVE CLASS - 2 BC 3301.1.1 RESPONSIBILITY FOR SAFETY. OBSERVED THE ELEVATOR SHAFT DOORS AT THE CELLAR LVL WERE WIDE OPEN- WITH NO CO... $0 $0 Jun 26, 2025
Oct 3, 2024 39533107P RESOLVE CLASS - 2 OBSERVED 5 STR NB UNDER CONSTRUCTION WITH MATERIAL STORED IN HALLWAYS AND STAIRWELLS AT MULTIPLE FLOORS, IMPEDING THE... $1,250 $1,250 Jun 26, 2025
Oct 3, 2024 39533108R RESOLVE CLASS - 2 BC 3303.7.2 FIRE EXTINGUISHERS. OBSERVED 5 STR NB UNDER CONSTRUCTION WITH FIRE EXTINGUISHERS ON SITE NOT MAINTAINED P... $625 $625 Jun 26, 2025
Oct 3, 2024 39533116R RESOLVE CLASS - 2 BC 3307.2.6 & 3307.4 WARNING SIGNS, PERSONNEL, AND BARRIERS. OBSERVED MATERIAL STORED IN THE ROADWAY IN FRONT OF THE ... $625 $625 Jun 26, 2025
Oct 3, 2024 39533065X RESOLVE CLASS - 2 BC 3301.13.7 THRU 3301.13.12- FAILURE TO HAVE CONSTRUCTION SUPERINTENDENT OR COMPETENT PERSON PRESENT ON ACTIVE JOBSI... $2,500 $2,500 Jan 20, 2026
Aug 21, 2023 39520786N RESOLVE CLASS - 2 DURING MY INSPECTION OF NEW 5 STORY BUILDING, CONSTRUCTION AT 2ND STORY LEVEL, I ASKED TO REVIEW THE SITE SAFETY PLAN... $0 $0 Oct 31, 2023
Aug 21, 2023 39520787P RESOLVE CLASS - 2 WHILE CONDUCTING MY PERIMETER INSPECTION WITH THE APPROVED DRAWINGS FOR THE SIDEWALK SHAED, OBSERVED THE SWS WAS CCON... $0 $0 Oct 31, 2023
Aug 21, 2023 39520788R RESOLVE CLASS - 2 DURING MY PERIMETER INSPECTION, I OBSERVED THE SIDEWALK SHED PARAPET WAS CONSTRUCTED OF SOLID PLYWOOD, CONTRARY TO TH... $2,400 $2,400 Mar 19, 2024
Jul 31, 2023 39519982M RESOLVE CLASS - 2 OBSERVED WORKING DECK ABOVE FENCE LINE EXP 3 AND 4 WITH REBAR SLAB AND COLUMNS INSTALLED NO OVER HEAD PROTECTION IN P... $0 $0 Oct 10, 2023
Jul 31, 2023 39519981K RESOLVE CLASS - 2 OBSERVED NONACTIVE SITE WORKING DECK 16 FEET FROM GRADE REBAR INSTALLED SLAB COLUMNS NO SWS IN PLACE EXP1 REVIEW SWS ... $2,400 $2,400 Feb 27, 2024
Jun 6, 2023 39517476K RESOLVE CLASS - 1 SUPPORT OF EXCAVATION&FOUNDATION PLANS.@5 STORY NB SITE IN EXCAVATION&FOUNDATION PHASE OBSERVE EXPOSURE#2 PROPERTY (1... $625 $0 Oct 10, 2023
Jun 6, 2023 39517477M RESOLVE CLASS - 1 PRECONSTRUCTION SURVEY/MONITOR REPORT&PLAN/ENGINEER REPORT.@5 STORY NB SITE EXCAVATION/FOUNDATION PHASE OVER 10FT BEL... $625 $0 Oct 10, 2023
Feb 6, 2013 35051541K RESOLVE CLASS - 1 FAILURE TO COMPLY W/THE COMMISSIONER'S ORDER CONTAINED IN NOV #34986943K ISSUED ON 10.6.12. (ILLEGAL SROS & PARTITION... $2,400 $0 Mar 26, 2013
Dec 15, 2012 35003314Y RESOLVE CLASS - 1 FAILURE TO COMPLY W/THE COMM'S ORDER CONTAINED IN NOV #34986943K ISSUED ON 10/6/12 FOR WORK W/O PERMIT AT CELLAR & 1F... $2,400 $0 Jan 29, 2013
Dec 15, 2012 35003315X RESOLVE CLASS - 2 FAIL TO COMPLY W/COMMISSIONER ORDER TO FILE C OF C W/DOB FOR NOV #34986944M ISSUED ON 10/06/12. REMEDY: FILE CERTIFIC... $800 $0 Jan 29, 2013
Oct 6, 2012 34986943K RESOLVE CLASS - 1 WORK W/O A PERMIT NOTED (1) AT CELLAR LEVEL INSTALLATION OF PARTITIONSCREATING SLEEPING QUATERS W/O ADEQUATE MEANS OF... $1,600 $0 Dec 11, 2012
Oct 6, 2012 34986944M RESOLVE CLASS - 1 RESIDENCE ALTERED FOR OCCUPANCY AS A DWELLING FROM 1 OR 2 FAMILIES TO 4 OR MORE. NOTED: AT 1ST FL INSTALLATION OF PAR... $2,400 $0 Dec 11, 2012