43-45 Main Street, Queens
Queens • Block 05140 • Lot 0047 • Zip: 11355
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 1 day ago- Grand Central 57 min 25 walking, 32 riding
- Times Square 60 min 25 walking, 35 riding
- Penn Station 66 min 25 walking, 41 riding
- Union Square 68 min 25 walking, 43 riding
- Fulton Street 74 min 25 walking, 49 riding
- Downtown Brooklyn 78 min 25 walking, 53 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Places nearby
Ganesh Temple Canteen
No description yet
Xi Jiang Qian Hu Noodle
No description yet
Deng Ji Yunnan Guoqiao Mixian
No description yet
Bodhi Village
No description yet
Yeh's Bakery
Yeh's Bakery in Flushing, NY offers a delectable array of freshly baked goods including breads, pastries, and cakes. ...
OK Canaan
OK Canaan is a hidden gem in Flushing, NY offering a diverse menu of delicious dishes from various Asian cuisines. Th...
OK Ryan
No description yet
Dumpling Galaxy
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2017
-
Alteration Type I
JOB FILED TO REVISE INTERIOR LAYOUT TO REMOVE EX. PLATFORM AND PARTITION WA LL ON 001 FLOOR AND TO PROPOSE HORIZONTAL...
2016
-
Alteration Type II
JOB FILED TO REMOVE PLATFORM IN THE FIRST FLOOR AND REMOVE PARTTION WALL. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
2012
-
Alteration Type II
FILING FOR KITCHEN RANGEHOOD FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#420491694, AS SHOWN ON PLAN. COOKING EQU...
2011
2010
-
DOB violation Sep 16, 2010
C-CONSTRUCTION OTHER OPTIONAL
-
Alteration Type II
FILE THE ARCHITECTURAL LAYOUT TO RENOVATE TJE EXISTING OFFICE, AND OPER A NEW WINDOW AR 2ND FLOOR. NO CHANGE IN USE. ...
2009
-
DOB violation Oct 15, 2009
C-CONSTRUCTION OTHER OPTIONAL
2008
2004
-
Alteration Type II
INSTALLATION OF NEW STORE FRONT. WALK-IN C in the deli store. Installation of 1.5 ton split system, air conditioning....
-
Non-Hazardous
WORK WITHOUT A PERMIT WORK NOTED (1)WALK IN FREEZER APPROX. 10' X 16' INSTALLED AT REAR OF STORE (2)NEW BATHROOM APP....
-
DOB violation Feb 13, 2004
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2003
-
Alteration Type II
PROPOSE: TO REPAIR STORE FRINT, REPLACE VERTICAL DAMAGED COLUMN. NO CHAN GE OF OCCUPANCY USE OR EXIT. 8'-0" HIGH WOOD...
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2002
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2001
-
DOB violation Aug 2, 2001
C-CONSTRUCTION OTHER OPTIONAL
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records