ECB violations
Bowne Street, Queens • Block 05181 • Lot 0015
158 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jun 22, 2015 | 35130211N | RESOLVE | CLASS - 2 | NO VALID DOT PERMIT POSTED/OBTAINED AS REQUIRED.@TIME OF MY INSP OBSERVED-NB UNDER CONST-SIDEWALK @EXP#1 CLOSED TO PU... | $0 | $0 | Aug 11, 2015 |
| Jun 22, 2015 | 35130213R | RESOLVE | CLASS - 2 | JOBSITE FENCE NOT CONSTRUCTED OR MAINTAINED PURSUANT TO SUBSECTION.OBSERVED NB UNDER CONST FENCE BEEN ERECTED @EXP#1-... | $0 | $0 | Aug 11, 2015 |
| Jun 22, 2015 | 35130210L | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONST OPS.@TIME OF MY INSP OBSERVED-NB BUILT INTO 17 STORY MI... | $1,200 | $0 | Aug 11, 2015 |
| Jun 22, 2015 | 35130208M | RESOLVE | CLASS - 1 | FAILURE TO HAVE SITE SAFETY MANAGER PRESENT ON SITE AS REQUIRED.@TIME OF MY INSP OBSERVED-PROPOSED 18 STORY NB-FORM W... | $1,200 | $0 | Aug 11, 2015 |
| Jun 22, 2015 | 35130215K | RESOLVE | CLASS - 1 | BC 3308.4 VERTICAL NETTING NOT MAINTAINED AS REQUIRED @TIME OF MY INSPOBSERVED-PROPOSED NB UNDER CONST BUILT INTO 17 ... | $1,600 | $0 | Aug 11, 2015 |
| Jun 22, 2015 | 35130214Z | RESOLVE | CLASS - 2 | FAILURE TO POST DOT PERMIT FOR STREET/LANE CLOSING.OBSERVED.NB @17 STORY 1 LANE OF UNION STREET @EXP#1 CLOSED.BARRICA... | $0 | $0 | Aug 11, 2015 |
| May 19, 2015 | 35130883X | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR AMEND MENTS.AT TIME OF INSPECTION OBSERVED ACTIVE JOB... | $1,000 | $0 | Jul 21, 2015 |
| May 19, 2015 | 35130882Y | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD: EXPOSED UNFINISHED STAIRS. AT TIME OF INSPECTIONOBSERVED ACTIVE JOBSITE AT THE 8TH FLOOR OBSERV... | $2,400 | $0 | Jul 7, 2015 |
| May 19, 2015 | 35130881M | RESOLVE | CLASS - 1 | FAILURE TO MAINTAIN HOUSEKEEPING. AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE 17 FLOORS OUT OF THE GROUND. AT FLRS ... | $2,400 | $0 | Jul 7, 2015 |
| Apr 16, 2015 | 35129630J | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS &/OR APPROVEDAMENDMENTS. AT TIME OF INSPECTION OBSERVED ACTI... | $500 | $0 | Jun 2, 2015 |
| Apr 16, 2015 | 35129629M | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSONS & PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS. AT TIME OF INSPECTION OBSERVED ACTIV... | $2,400 | $0 | Jun 2, 2015 |
| Mar 3, 2015 | 35122527J | RESOLVE | CLASS - 2 | BC3303.11.1 PARTIAL STOP WORK ORDER (7TH FLR THRU 14TH FLR) ISSUED PU RSUANT TO 28-207.7 AND POSTED AT PREMISES NO PE... | $400 | $0 | May 5, 2015 |
| Mar 3, 2015 | 35122528L | RESOLVE | CLASS - 1 | BC3303.8 PARTIAL STOP WORK ORDER 7TH FL THROUGH 14TH FLR ISSUED PURS UANT TO 28-207.7 AND POSTED AT PREMISES. AT TIME... | $1,600 | $0 | May 5, 2015 |
| Mar 3, 2015 | 35122529N | RESOLVE | CLASS - 2 | BC3310.8.1 SITE SAFETY MANAGER FAILED TO MONITOR COMPLIANCE WITH SAFETY REQUIREMENTS AT JOBSITE. NOTE AT TIME OF INSP... | $800 | $0 | Jul 24, 2015 |
| Mar 3, 2015 | 35122530K | RESOLVE | CLASS - 1 | BC3307.6.2 FAILURE TO PROTECT WALKWAY/PLAZA IN FRONT OF BUILDING.NOTE AT TIME OF INSPECTION ACTIVE CONSTRUCTION SITE ... | $1,600 | $0 | May 5, 2015 |
| Jan 21, 2015 | 35120781X | RESOLVE | CLASS - 2 | SEC. 3307.6.5 FAILURE TO MAINTAIN SIDEWALK SHED. NOTICED AT TIME OF INSPECTION AT EXP 4 SIDEWALK SHED IN PLACE NOT MA... | $0 | $0 | Mar 10, 2015 |
| Jan 21, 2015 | 35120780Y | RESOLVE | CLASS - 1 | SEC. 3303.4.1 ALL SITES SHOULD BE FREE OF ICE. NOTICED AT TIME OF INSPECTION NB IN PROGRESS NOTICED THRU-OUT ENTIRE S... | $1,600 | $0 | Mar 10, 2015 |
| Jan 21, 2015 | 35120779R | RESOLVE | CLASS - 1 | SEC. 3308.1.3 HORIZONAL NETTING NOT PROVIDED. NOTICED AT TIME OF INSPECTION ON 6TH FL CURB WALLS NOT STRIPPED OR POUR... | $1,600 | $0 | Mar 10, 2015 |
| Jan 6, 2015 | 35121892N | RESOLVE | CLASS - 2 | FAILURE TO SAFEGUARD INSTALLED @ TIME OF INSPECTION @ EXP.2 ON 1ST FLOOR REBARS NOT CAPPED.REM:CAP RENBARS AND SAFEGU... | $1,200 | $0 | Mar 10, 2015 |
| Jan 6, 2015 | 35121894R | RESOLVE | CLASS - 2 | 3303.4.2 MAINTENANCE ALL AREAS SHALL BE CLEAR & FREE FROM ICE AND SNOW NOTICED @ TIME OF INSPECTION NB IN PROGRESS,NO... | $400 | $0 | Mar 10, 2015 |
| Jan 6, 2015 | 35121893P | RESOLVE | CLASS - 2 | 3301.7 DESIGN DRAWINGS REQUIRED.NOTICED @ TIME OF INSP.NOTICED CONCRETE WASHOUT BOX IN USE NO DESIGN DRAWINGS ON SITE... | $0 | $0 | Feb 24, 2015 |
| Jan 6, 2015 | 35121891L | RESOLVE | CLASS - 2 | JOBSITE FENCE NOT TO CODE.NOTICED @ TIME OF INSP.NB IN PROGRESS NOTICED @ EXP.2 INADEQUATE FENCE MISSING FENCE AND NO... | $0 | $0 | Feb 24, 2015 |
| Sep 2, 2014 | 35032686H | RESOLVE | CLASS - 1 | FAIL TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT;TOEBOARDS.@TIME OF INSP O BSERVED TOEBOARDS/ZERO CABLE MISSING THROUGHOUT... | $1,000 | $0 | Oct 21, 2014 |
| Aug 18, 2014 | 35098688N | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSON AND PROPERTY AFFECTED BY CONSTRUCTION OPS.AT TIME OF INSPECTION OBSERVED ACTIVE N.B. ... | $1,200 | $0 | Oct 21, 2014 |
| Aug 18, 2014 | 35098689P | RESOLVE | CLASS - 1 | WORK W/O A PERMIT. CONVEYOR. AT TIME OF INSPECTION OBSERVED ACTIVE N.BUNDER CONSTRUCTION.A TEMP CONVEYOR HAS BEEN INS... | $800 | $0 | Oct 21, 2014 |
| Jul 29, 2014 | 34904582M | RESOLVE | CLASS - 1 | BC3308.1.1 FAILURE TO PROVIDE VERTICAL SAFETY NETTING REQUIREMENT. AS NOTED: AT TIME OF INSPECTION ON AN ACTIVE CONST... | $400 | $0 | Oct 21, 2014 |
| May 17, 2014 | 35092634K | RESOLVE | CLASS - 1 | 28-407.1 FAILURE TO HAVE WELDERS LICENSE FOR MANUAL STRUCTION WELDING BEING PERFORM ON EXCAVATOR SHORING SUPPORT WALL... | $1,600 | $0 | Jul 1, 2014 |
| May 17, 2014 | 35092633Z | RESOLVE | CLASS - 1 | 28-105.1 WORK WITHOUT A VARIANCE PERMIT CONTRARY TO 28-105.12.5. AT TIME OF INSPECTION OBSERVED 3 WELDERS @ NORTH ELE... | $150 | $0 | Jul 1, 2014 |
| May 17, 2014 | 35092631P | RESOLVE | CLASS - 1 | FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED NOTE AT TIME OF INSPECTION OBSERVED 3 WORKERS WELDING SUPPORT... | $1,200 | $0 | Jul 1, 2014 |
| May 16, 2014 | 35087032R | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTION OPERATIONS AT TIME OF INSPECTION OBSERVED ACTI... | $1,200 | $0 | Aug 5, 2014 |
| May 16, 2014 | 35087033Z | RESOLVE | CLASS - 1 | REQUIRED LIGHTED STAIRWAY WHILE UNDER CONSTRUCTION AT TIME OF INSPECTION OBSERVED ACTIVE JOBSITE BLDG CURRENTLY 5 STO... | $400 | $0 | Jul 1, 2014 |
| Mar 6, 2014 | 34999624X | RESOLVE | CLASS - 2 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND OR APPROVED AMENDMENTS.UPON INSPECTION CONTRACTOR REMOVE... | $250 | $0 | Apr 22, 2014 |
| Mar 6, 2014 | 34999623Y | RESOLVE | CLASS - 1 | FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. UPON INSPECTION CONTRACTOR FAILED TO PROVIDE 45% ANGLE OF REPOS... | $2,400 | $0 | Apr 22, 2014 |
| Jan 11, 2014 | 35087533P | RESOLVE | CLASS - 1 | FAILURE TO HAVE SITE SAFETY MANAGER AT SITE PRESENT AS REQUIRED:NOTE @TIME OF INSPECTION SITE OPEN WORKERS PREPARING ... | $1,200 | $0 | Feb 25, 2014 |
| Jan 11, 2014 | 35087535Z | RESOLVE | CLASS - 2 | BC3303.15.1 FAILURE TO PROVIDE A PRE-MANUFACTURED WATERTIGHT CONTAINERFOR THE PURPOSE OF COLLECTING AND CONTINUING CO... | $400 | $0 | Feb 27, 2014 |
| Nov 6, 2013 | 35077196Y | RESOLVE | CLASS - 1 | FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED.NOTE AT TIME OF INSPECTION WAITED OVER 1/2 HOUR. AT JOB SITE ... | $1,200 | $0 | Dec 24, 2013 |
| Sep 18, 2013 | 34904188Y | RESOLVE | CLASS - 2 | FAILURE TO PROVIDE SPECIAL INSP OF CONCRETE PLACEMENT,TR-1 SPECIAL INSP AS NOTED:@ TIME OF INSP ON AN ACTIVE CONST SI... | $1,600 | $0 | Nov 12, 2013 |
| Sep 18, 2013 | 34904189X | RESOLVE | CLASS - 1 | 1905.6.2.1FAILURE TO PROVIDE THE MINIMUM FREQUENCY SAMPLES FOR STRENTHTEST OF CONCRETE AS NOTED:@ TIME OF INSP ON AN ... | $1,600 | $0 | Nov 12, 2013 |
| Aug 6, 2013 | 35028752P | RESOLVE | CLASS - 1 | FAILURE TO HAVE SITE SAFETY MANAGER PRESENT AS REQUIRED. AT TIME OF INSPECTION OBSERVED ERECTION OF 1ST FL FORM WORK ... | $1,200 | $0 | Nov 19, 2013 |
| May 22, 2013 | 35008157M | RESOLVE | CLASS - 2 | FAIL TO PERFORM PROPER CONCRETE WASHOUT WATER PROCEDURES.NOTE:DURING PUMPING OPERATIONS @EXP #4 WALL,CONCRETE TRUCK W... | $1,200 | $0 | Aug 13, 2013 |
| May 22, 2013 | 35008158Y | RESOLVE | CLASS - 1 | FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION.NOTE:@EXP #2 OF SITE 8'-10' EXCAVATION W/SHEAR CUT HAS BEEN CREATED... | $2,400 | $0 | Aug 13, 2013 |
| May 22, 2013 | 35008159X | RESOLVE | CLASS - 1 | 3304.4.5 EXCAVATED MATERIIAL,EQUIPMENT,TRUCKS PLACE TO CLOSE TO THE EDGE OF UNBRACED EXCAVATION.@EXP #2 OF JOB SITE 8... | $1,600 | $0 | Aug 13, 2013 |
| May 17, 2013 | 35008117H | RESOLVE | CLASS - 1 | FAIL TO PROVIDE PROTECTION AT SIDES OF EXCAVATION.NOTE:THERE IS A 12'-15' SHEAR CUT @TOP OF HILL;THE SLOPE OF EARTH I... | $2,400 | $0 | Jul 2, 2013 |
| May 17, 2013 | 35008116X | RESOLVE | CLASS - 1 | 3304.4.5 EXCAVATED MATERIAL,EQUIPMENT,TRUCKS,ETC.PLACED TOO CLOSE TO EDGE OF UNBRACED EXCAVATION.THERE IS A BACKHOE/E... | $1,600 | $0 | Jul 2, 2013 |
| May 14, 2013 | 35017013H | RESOLVE | CLASS - 1 | FAILURE TO INSTITUTE/MAINTAIN SAFETY EQUIPMENT MEASURES OR TEMPORARY CONSTRUCTION, NO GUARD RAILS. AT TIME OF INSPECT... | $1,200 | $0 | Jul 30, 2013 |
| Mar 27, 2013 | 35003923J | RESOLVE | CLASS - 1 | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS/SITE SAFETY PLAN - AT TIME OF INSPECTION, OBSERVED USE OF AD... | $1,000 | $0 | May 14, 2013 |
| Feb 20, 2013 | 35002954H | RESOLVE | CLASS - 1 | SEC. 3304.7 SAFE MEANS OF IGRESS & EGRESS NOTED: AT EXPO 2 INSTALLING BOTTONS,APPROX 20FT DOWN FROM(GRADE) NO EGRESS/... | $1,600 | $0 | Jun 25, 2013 |
| Feb 20, 2013 | 35002953X | RESOLVE | CLASS - 1 | SEC. 33010.5 FAILURE TO HAVE SITE SAFETY MANAGER OR COORDINATION PRESENT AS REQUIRED. NOTED: NO SITE SAFETY MANAGER A... | $1,200 | $0 | Jun 25, 2013 |
| Jan 17, 2013 | 34999782L | RESOLVE | CLASS - 1 | FAILURE TO SAFEGUARD ALL PERSONS AND PROPERTY AFFECTED BY CONSTRUCTIONOPERATIONS.DUE TO EXCAVATION OPERATIONS THERE I... | $2,400 | $0 | Mar 7, 2013 |
| Jan 16, 2013 | 34779072M | RESOLVE | CLASS - 2 | FAILURE TO PERFORM PROPER CONCRETE WASHOUT PROCEDURES AT SITE.COLLECTION AND CONTAINMENT AS NOTED: AT TIME OF INSPECT... | $1,200 | $0 | Mar 7, 2013 |