45-68 162 Street, Queens
Queens • Block 05440 • Lot 0074 • Zip: 11358
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 57 min 25 walking, 32 riding
- Times Square 60 min 25 walking, 35 riding
- Penn Station 66 min 25 walking, 41 riding
- Union Square 68 min 25 walking, 43 riding
- Fulton Street 74 min 25 walking, 49 riding
- Downtown Brooklyn 78 min 25 walking, 53 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Places nearby
Master Huang
No description yet
Parksanbal Babs
Parksanbal Babs is a cozy Korean restaurant in Flushing known for its delicious BBQ dishes and traditional flavors. T...
Parksanbal
Parksanbal is a hidden gem in Flushing, NY offering a cozy and intimate atmosphere perfect for unwinding with friends...
Daesung Korean Noodle
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 7, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2025
-
HPD violation Jun 12, 2025
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Mar 30, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2004
2003
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2002
-
Non-Hazardous
FAILURE TO PROVIDE CONTRACTOR SIGN VIOLATION NOTED:AT TIME OF INSPECTION,BUILDING WAS CONSTRUCTED UP TO THE ROOF,PLUM...
-
Non-Hazardous
WORK DOES NOT CONFORM TO APPROVED PLANS. ON INSPECTION OF ABOVE PREMISES NEW BLDGS WERE UNDER CONSTRUCTION 1SR FLOOR ...
-
Demolition
-
Hazardous
FAILURE TO FILE TRI PRIOR TO START OF CONTROLLED WORK NO TRI FILE FOR CONTROLLED WORK PROVIDE TRI FOR EXCAVATION & SH...
-
Hazardous
FAILURE TO PROVIDE PROTECTION AT SIDES OF EXCAVATION. PROVIDE SHEETING & SHORING AT THE SOUTH SIDE OF THE PREMISES TO...
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2001
-
Subdivision Improved
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records