Kissena Boulevard, Queens
Queens • Block 06517 • Lot 0001 • Zip: 11367
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 57 min 25 walking, 32 riding
- Times Square 60 min 25 walking, 35 riding
- Penn Station 66 min 25 walking, 41 riding
- Union Square 68 min 25 walking, 43 riding
- Fulton Street 74 min 25 walking, 49 riding
- Downtown Brooklyn 78 min 25 walking, 53 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation May 11, 2026
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
-
Alteration Type II
GENERAL CONSTRUCTION WORK FILED FOR QUEENS COLLEGE BOILER PLANT REPLACEMENT. NO CHANGE TO USE, EGRESS OR OCCUPANCY
-
Alteration Type II
INSTALLATION OF MANUAL AND AUTOMATIC SMOKE/HEAT DETECTION AND SPRINKLER FIRE ALARM SYSTEM.
-
HPD violation Feb 17, 2026
Class C
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 104, 1st STORY,...
-
HPD violation Feb 17, 2026
Class C
§ 27-2031 ADM CODE PROVIDE HOT WATER AT ALL HOT WATER FIXTURES IN THE ENTIRE APARTMENT LOCATED AT APT 102, 1st STORY,...
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
Alteration Type II
REMOVE EXISTING ROOFING & REPLACE WITH NEW ROOFING @ QUEENS COLLEGE DINING HALL, EXTEND AND REPLACE EX. EQUIPMENT...
2024
2023
-
Place of Assembly
-
Place of Assembly
-
Alteration Type II
FILING HEREWITH ALT-2 APPLICATION FOR THE PURPOSE OF A FULL RENOVATION TO THE GERTZ HALL QUEENS COLLEGE DASNY PROJECT...
2022
-
CLASS - 2
AT TIME OF INSPECTION ON AN ACTIVE 1 STORY ALT JOB SITE I OBSERVED WORKERS ON SITE PERFORMING INTERIOR DEMOLITION WOR...
-
CLASS - 2
AT TIME OF INSPECTION OBSERVED ACTIVE 1 STORY ALT JOB SITE - WORKERS ON SITE PERFORMING INTERIOR DEMOLITION WORK. WHE...
-
CLASS - 2
3301.13.4 FAILURE TO NOTIFY DEPT OF DESIGNATION OF CONST SUPER.NOTED:ATO MY INSP OF ALT3STYB,CONST IN PROGRESS,UPON E...
2021
-
CLASS - 2
CONSTRUCTION SUPERINTENDENT FAILED TO PERFORM DUTIES PER CODE.NOTED:AT TIME OF INSPECTION OF AN ALTERATION TYPE 2 ATH...
-
CLASS - 2
FAILURE TO MAINTAIN/DISPLAY ON SITE DOCUMENTS REQUIRED BY BC CHAPTER 33-SITE SAFETY PLAN.NOTED:AT TIME OF INSPECTION ...
-
CLASS - 1
BC 3301.6 NO DESIGN DRAWINGS(STRUCTURAL SHORING)NOTED:AT TIME OF INSPECTION OF ALTERATION TYPE 2, 3 STORY BUILDING CO...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records