150-60 Coolidge Avenue, Queens
Queens • Block 06718 • Lot 0158 • Zip: 11432
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 2 days ago- Grand Central 48 min 8 walking, 40 riding
- Times Square 50 min 8 walking, 42 riding
- Penn Station 51 min 8 walking, 43 riding
- Union Square 53 min 8 walking, 45 riding
- Fulton Street 59 min 8 walking, 51 riding
- Downtown Brooklyn 60 min 8 walking, 52 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2023
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
2018
-
DOB violation Apr 6, 2018
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
2017
-
DOB violation Feb 24, 2017
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2014
-
Alteration Type III
INSTALLATION OF HEAVY DUTY SIDEWALK SHED 56', FILED IN CONJUNCTION WITH #401701093 Ýparapet repair and waterproofing¨...
2013
-
Alteration Type II
REPAIR EXISTING PARAPET WALL , DEFECTIVE MANSARD ROOF AND PROVIDE WEATHERPROOF AT ANY REMAINING OPENINGS AT ROOF LEVE...
2006
-
Alteration Type II
REPLACE BOILER AND OIL BURNER WITH (3) THREE GAS BOILERS. INSTALL NEW GAS PIPING TO EXISTING GAS METERS AND ABANDON E...
2004
2003
-
DOB violation Jul 7, 2003
IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL
-
Hazardous
FAILURE TO MAINTAIN EXTERIOR OF BUILDING- DEFECT IS MANSARD ROOF LOCATED ON NORTH SIDE OF BUILDING WOOD ROTTED & PULL...
1998
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records