164 Street, Queens
Queens • Block 06866 • Lot 0001 • Zip: 11365
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Grand Central 57 min 25 walking, 32 riding
- Times Square 60 min 25 walking, 35 riding
- Penn Station 66 min 25 walking, 41 riding
- Union Square 68 min 25 walking, 43 riding
- Fulton Street 74 min 25 walking, 49 riding
- Downtown Brooklyn 78 min 25 walking, 53 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type II
REPLACE BOILER AND OIL BURNER (NYC BOILER # 76951-01) AND INSTALL OIL FIRED HOT WATER HEATER. NO CHANGE IN EGRESS, OC...
2025
-
CLASS - 2
1RCNY 103-09(E). FAILURE TO FILE A RETAINING WALL CONDITION ASSESSMENTREPORT BY THE DEADLINE AS REQUIRED BY 1RCNY 103...
2024
-
CLASS - 1
BC3314.1 SUPPORTED SCAFFOLD.OBSERVE UNSAFE 6 FRAME HIGH EXTERIOR PERIMETER SUPPORTED SCAFFOLD @EXPSOURE#1-2: UNSECURE...
-
CLASS - 1
DESIGN DOCUMENT FOR WOOD OVERHANG PLATFORM.@EXPOSURES#1-2 OBSERVE ROOF LEVEL CANTILEVERED END OF PLATFORM ANGLE BRACE...
2023
-
CLASS - 2
AT THE TIME OF INSPECTION, OBSERVED CONCRETE WASH OUT WATER DUMPED INTO PIT IN THE GROUND WITHOUT USING CONCRETE WASH...
-
CLASS - 2
DURING MY INSPECTION OF NEW 2 STORY BUILDING, CONSTRUCTION IN PROGRESS, APPROX. 11 WORKERS ON-SITE, OBSERVED A TEMP. ...
-
CLASS - 2
NO EN DRAWING AND COM/CHECK APPROVED FROM DOB PROVIDED ON THE JOB SITE AT THE TIME OF INSPECTION., PROVIDE APPROVED /...
2022
-
DOB violation Dec 15, 2022
RWNRF-RETAINING WALL NONE
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
-
DOB violation Dec 15, 2022
RWNRF-RETAINING WALL NONE
FAILED TO FILE CYCLE 1 TECHNICAL REPORT BY 12/31/2018 PER RCNY 103-09
2021
2018
-
Alteration Type II
LEGALIZATION OF INSTALLATION OF 200KW DIESEL FUELED EMERGENCY GENERATOR WITH 400 GALLON SUB BASE TANK ALL AS PER PLAN...
2014
-
DOB violation May 15, 2014
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
2009
-
Alteration Type II
REPLACE ROOFTOP AC UNIT AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY
2008
-
Alteration Type II
INSTALL ONE NEW 280 GALLON ABOVE GROUND DOUBLE WALL LUBE CUBE OUTSIDE. NO CHANGE IN USE, OCCUPANCY OR EGRESS.
2007
-
New Building
2004
-
DOB violation Feb 13, 2004
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2003
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2002
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records