DOB violations
259-03-259-07 Hillside Avenue, Queens • Block 08771 • Lot 0008
5 records
Violations issued by the Department of Buildings.
| Issued | Violation | Type | Category | Description | Disposed |
|---|---|---|---|---|---|
| Jun 23, 2017 | 00345 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Dec 16, 2016 | 00301 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2014 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Mar 3, 2015 | 00965 | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | V-DOB VIOLATION - ACTIVE | VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION | — |
| Jun 30, 2011 | CN1301MM | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | — | — |
| May 28, 2008 | 1301MK | C-CONSTRUCTION OTHER OPTIONAL | V-DOB VIOLATION - ACTIVE | — | — |