84-04 Jamaica Avenue, Queens
Queens • Block 08919 • Lot 0019 • Zip: 11421
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 41 min 4 walking, 37 riding
- Fulton Street 46 min 4 walking, 42 riding
- Union Square 53 min 4 walking, 49 riding
- Grand Central 58 min 4 walking, 54 riding
- Penn Station 58 min 4 walking, 54 riding
- Times Square 59 min 4 walking, 55 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Mar 10, 2026
Class B
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd S...
-
HPD violation Mar 10, 2026
Class B
§ 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC WALL TILES AT ALL WALLS ...
-
HPD violation Mar 10, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... GRATER THAN 10 SQ.FEET AT CEILIN...
-
HPD violation Mar 10, 2026
Class B
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF MICE IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STOR...
-
HPD violation Mar 10, 2026
Class A
§ 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR NORTH WALL IN THE...
-
HPD violation Mar 10, 2026
Class B
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE RADIATOR SHUT-OFF KNOB AT WEST WALL IN THE KITCHEN ...
2023
2011
-
Alteration Type II
BOILER TO BE ADDED TO EXISTING BUILDING AT CELLAR FLOOR. ALL PLUMBING AND CONSTRUCTION WERE FILED UNDER APPLICATION J...
-
Alteration Type II
This application is filed for Plumbing and OT worktype to have an enclosed boiler room for 1 existing boiler, 1 hot w...
2009
-
CLASS - 2
CONSTRUCTION DOCUMENTS SHALL BE COMPLETED AND OF SUFFICIENT CLARITY TOINDICATE THE REQUIREMENTS FOR SUCH APPLICATION ...
2007
-
DOB violation Jan 19, 2007
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2006
-
DOB violation Jan 6, 2006
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1998
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1997
-
DOB violation Sep 16, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Feb 10, 1997
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1995
-
DOB violation Aug 29, 1995
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
Hazardous
FAILURE TO MAINTAIN EXTERIOR BUILDING WALL AT FRONT--4 FOOT SECTION ATPARAPET AT LEFT SIDE COLLAPSED 5 FOOT SECTION B...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records