138-30-138-32 86 Avenue, Queens
Queens • Block 09646 • Lot 0032 • Zip: 11435
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 48 min 8 walking, 40 riding
- Times Square 50 min 8 walking, 42 riding
- Penn Station 51 min 8 walking, 43 riding
- Union Square 53 min 8 walking, 45 riding
- Fulton Street 59 min 8 walking, 51 riding
- Downtown Brooklyn 60 min 8 walking, 52 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Places nearby
Sweet Bamboo
Chinese restaurant
Maloney's
Maloney's is a cozy neighborhood bar in Queens known for its friendly atmosphere and cold drinks. Enjoy live music, p...
Lovell's Guiding Light
Laid-back, colorful club featuring DJs playing Caribbean dance music & island-inspired cocktails.
NUTRIPAN BAKERY 2
Compact counter-serve for Columbian dishes & baked goods, plus smoothies & American breakfast fare.
Punto Rojo Bakery Queens
Chill bakery/eatery doling out Colombian cakes & baked goods, plus breakfast, meat plates & seafood.
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
Alteration Type I
NO WORK ALT I APPLICATION TO CORRECT TYPOGRAPHICAL ERROR ON CO ISSUED UNDER JN400133841. ADDRESS IS 86 AVENUE, NOT 86...
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2024
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Sep 23, 2024
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
2014
-
Alteration Type II
INTERIOR RENOVATION OF EXISTING COMMERCIAL SPACE AT FIRST FLOOR. ADD HVAC SYSTEM. NO CHANGE OF US, EGRESS OR CERTIFIC...
-
Alteration Type II
INSTALL AUTOMATIC FIRE SUPPRESSION SYSTEM. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2012
-
Alteration Type II
INSTALLING A FIRE SUPPRESSION SYSTEM. AS PER PLAN HEREWITH. NO CHANGE IN USE, MEAN OF EGRESS OR OCCUPANCY. FILED IN C...
2011
-
Alteration Type II
TO CONVERT BAKERY INTO A RESTAURANT AND TO DO INTERIOR CHANGES. NO CHANGE OF EGRESS OR OCCUPANCY.
2010
-
Alteration Type II
REPLACE GAS FIRED PACKAGE BOILER AND CONNECT TO EXISTING GAS SERVICE INSTALL BOILER ROOM ENCLOSURE AND NEW GAS VENT ....
-
CLASS - 2
5A/ 40/ 50A/ 50B/ 50A WOOD & OTHER DEBRIE MUST BE REMOVED FROM BOILER ROOM 50B MAKE UP WATER TANK LEAKING
2000
-
Hazardous
18Q,18B,3A,49,48A,48B.3A-SECTIONS LAYING APART FROM EACH OTHER.2.18A,18B-PERTAINS TO RT BOTTOM HAND HOLE.3-HAND HOLES...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records