168-64 93 Avenue, Queens
Queens • Block 10217 • Lot 0029 • Zip: 11433
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Grand Central 58 min 18 walking, 40 riding
- Times Square 60 min 18 walking, 42 riding
- Penn Station 61 min 18 walking, 43 riding
- Union Square 64 min 18 walking, 46 riding
- Downtown Brooklyn 64 min 18 walking, 46 riding
- Fulton Street 69 min 18 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Places nearby
Bubble TeaTok
Tea house
Tina Restaurant and Sports Bar
Sports bar
Alexis Caribbean Cuisine
Caribbean restaurant
Mannan Bakery and Restaurant
Mannan Bakery and Restaurant is a cozy spot in Queens offering a fusion of delicious bakery items and savory dishes. ...
Richie's Place
Richie's Place is a cozy cafe in Jamaica, NY offering a variety of delicious coffee and pastries. With friendly staff...
Safari Jerk House
Jamaican restaurant
Brother's Coffee Shop
Coffee shop
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2025
2024
-
HPD violation Apr 17, 2024
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2023
-
HPD violation Mar 30, 2023
Class A
(A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION ...
2022
-
HPD violation Oct 17, 2022
Class A
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT RAIL OF WINDOW AT NORTH IN ...
-
HPD violation Oct 17, 2022
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT WEST WALL IN THE 1st ROOM...
-
HPD violation Oct 17, 2022
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE 1st ROOM FROM NORT...
-
HPD violation Oct 17, 2022
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK ABOVE THE CEILING IN THE 1st ROOM FROM NORTH AT WEST LOCA...
2019
2015
-
DOB violation Feb 11, 2015
AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE
FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
2014
-
CLASS - 2
FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. OBSERVED AT 10:50AM ON 4TH FLR HALLWAY ON SPRINKLER SYSTEM-INS...
-
CLASS - 1
MISC VIOLS. OBSERVED AT 10:50AM ON 2ND FLR APT BOILER ROOM. ENTIRE BOILER ROOM FILLED WITH COMBUSTIBLE MATERIAL. REMO...
2009
-
New Building
-
Alteration Type III
BPP STREET FRONTAGE 304 LINEAR FEET VERI FIED FRONTAGE= 304 FT.
2008
-
Alteration Type II
Install sprinkler system per the plans filed herewith and in conjunction with NB#401590970. There is no change in use...
-
Alteration Type II
Install sprinkler system per the plans filed herewith and in conjunction with NB#401590989. There is no change in use...
-
Alteration Type II
Install sprinkler system per the plans filed herewith and in conjunction with NB#401590998. There is no change in use...
-
Alteration Type II
Install sprinkler system per the plans filed herewith and in conjunction with NB#401591014. There is no change in use...
2007
2005
2004
-
Non-Hazardous
EXPIRED PERMITS (NB)VIOLATION NOTED:AT TIME OF INSPECTION,BRICK AND BLOCK WERE UP TO THE 1ST FLOOR,WITH NO WORK OR AC...
-
Non-Hazardous
FAILURE TO PROVIDE CONTRACTORS SIGN.VIOLATION NOTED:AT TIME OF INSPECTION,BRICK AND BLOCK WERE UP TO THE 1ST FLOOR,WI...
-
Hazardous
FAILURE TO SAFEGUARD PUBLIC AND PROPERTY.VIOLATION NOTED:AT TIME OF INSPECTION BRICK AND BLOCK WERE UP TO THE 1ST FLO...
1994
-
DOB violation Sep 9, 1994
C-CONSTRUCTION OTHER OPTIONAL
1993
-
DOB violation Oct 21, 1993
C-CONSTRUCTION OTHER OPTIONAL
-
Non-Hazardous
ALT BLDG OCCUPIED WITHOUT A VALID C OF O COQ1526959- ALT 2530/56- UNDER RENOVACATION OF CO= ABOVE BY B.S.A. 205 92A. ...
-
DOB violation Oct 18, 1993
C-CONSTRUCTION OTHER OPTIONAL
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records