Job filings
197-08 Hillside Avenue, Queens • Block 10472 • Lot 0004
8 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Apr 14, 2011 | 420294675 | Alteration Type II | SIGNED OFF | PROPOSED A PARTIAL PLUMBING AND INTERIOR WORK TO INSTALL LAUNDROMAT ESTABLISHMENT ON THE FIRST FLOOR IN EXISTING STOR... | $249,127 | SIMKHO ARANBAYEV |
| Apr 14, 2011 | 420303969 | Alteration Type II | SIGNED OFF | PROPOSED INSTALL GAS FIRED BOILER AND REPLACE A PARTIAL PARTITION IN EXISTING CELLAR WITH CONJUNCTION NB IN #42011290... | $21,600 | DAL H CHUN ENGINEER PC |
| Dec 3, 2010 | 420112906 | New Building | SIGNED OFF | NB | $0 | DAVID KOPTIEV |
| Nov 30, 2010 | 420117821 | Alteration Type III | SIGNED OFF | BPP | $0 | DAVID KOPTIEV |
| Nov 29, 2010 | 420118232 | Alteration Type III | SIGNED OFF | SCAFFOLD HEAVY DUTY 75 PSF, NO CHANGE IN USE, EGRESS OR OCCUPANCY | $0 | DAVID KOPTIEV |
| Nov 23, 2010 | 420257484 | Alteration Type III | SIGNED OFF | CC 10 LF INCLUDING (2) 1'6" SPLAYS IN CONJUNCTION WITH NB #420112906 SOUTH SIDE OF HILLSIDE AVE DISTANCE 124'-0" FROM... | $0 | SIMKHO ARANBAYEV |
| Oct 18, 2010 | 420230805 | Alteration Type II | SIGNED OFF | PROPOSED INSTALL ROOF NEW UNIT OF AIR CONDITIONER FOR THE FIRST FLOOR WITH CONJUNCTION IN NB #420112906, NO CHANGE IN... | $3,000 | SIMKHO ARANBAYEV |
| Mar 24, 2010 | 420162843 | Alteration Type II | PLAN EXAM - APPROVED | PROPOSED A PARTIAL PLUMBING AND INTERIOR WORK TO INSTALL LAUNDROMAT ESTABLISHMENT ON THE FIRST FLOOR IN EXISTING STOR... | $3,000 | SIMKHO ARANBAYEV |