ECB violations
135-54 Centreville Street, Queens • Block 11518 • Lot 0026
33 records
Environmental Control Board violations, which carry a hearing and a penalty.
| Issued | Violation | Status | Severity | Description | Penalty | Balance due | Hearing |
|---|---|---|---|---|---|---|---|
| Jul 8, 2026 | 39556313H | ACTIVE | CLASS - 2 | GENERAL CONTRACTOR FAILED TO FILE A CERTIFICATE OF CORRECTION WITH THE DOB FOR VIOLATION# 39551363N ISSUED 03/06/2026... | $1,250 | $1,250 | Sep 15, 2026 |
| May 14, 2026 | 39554132J | ACTIVE | CLASS - 2 | FAILURE TO COMPLY WITH THE COMMISSIONER'S ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS.... | $1,280 | $1,280 | Jul 21, 2026 |
| Mar 6, 2026 | 39551361J | ACTIVE | CLASS - 1 | WORK WITHOUT A PERMIT. OBSERVED: ACTIVE SITE CP PRESENT AT TIME OF INSPECTION NOTED FOUNDATION WALLS DONE EXCEPT CORN... | $12,500 | $12,500 | Jun 2, 2026 |
| Mar 6, 2026 | 39551367K | ACTIVE | CLASS - 2 | OBSERVED: ACTIVE SITE CP PRESENT UPON INSPECTION NOTED INADEQUATELY FIRE EXTINGUISHERS NOT PER NYC FIRE CODE UNITS NO... | $2,530 | $2,530 | Mar 16, 2027 |
| Mar 6, 2026 | 39551368M | ACTIVE | CLASS - 1 | OBSERVED ACTIVE SITE , UPON INSPECTION NOTED A GREAT AMOUNT ON MATERIAL DEBRIS IN DIFERENTS LOCATION , WOOD AND 2X4 A... | $2,530 | $2,530 | Mar 16, 2027 |
| Mar 6, 2026 | 39551369Y | ACTIVE | CLASS - 2 | OBSERVED: NO PEDESTRIAN PROTECTION DURING CONCRETE OPERATIONS NO FLAG PERSON NO SIGNANGE , STOP ALL CONCRETE OPERATIO... | $5,030 | $5,030 | Mar 16, 2027 |
| Mar 6, 2026 | 39551376M | ACTIVE | CLASS - 2 | OBSERVED:CONSTRUCTION SUPERINTENDENT WAZIR KHAN REGISTRATION 27464 FAILED TO PERFORM DUTIES .FOUND SITE WITH MULTIPLE... | $5,030 | $5,030 | Mar 23, 2027 |
| Mar 6, 2026 | 39551363N | ACTIVE | CLASS - 1 | OBSERVED: SOE WORK HAS BEEN DONE 85% APPROXIMATELY EXCEPT ON CORNER EXP1,2 , UPON REVIEW DRAWINGS NOTED MISSING WALLE... | $2,530 | $2,530 | Mar 16, 2027 |
| Mar 6, 2026 | 39551364P | ACTIVE | CLASS - 2 | OBSERVED: ACTIVE SITE WITHOUT SSP, SOE AND FOUNDATIONS DRAWINGS ,NO OPTICAL MONITORING & VIBRATION INSPECTION REPORTS... | $1,280 | $1,280 | Mar 16, 2027 |
| Jan 29, 2026 | 39549624J | RESOLVE | CLASS - 2 | NEW COMMUNITY FACILITY BUILDING .OBSERVED SITE CLOSED NO ONGOING CONSTRUCTION ACTIVITY , UPON EXTERIOR INPECTION NOTE... | $2,500 | $2,500 | Mar 16, 2027 |
| Jan 29, 2026 | 39549623H | RESOLVE | CLASS - 2 | NEW COMMUNITY FACILITY BUILDING .OBSERVED SITE CLOSED NO ONGOING CONSTRUCTION ACTIVITY , UPON EXTERIOR INPECTION NOTE... | $5,000 | $5,000 | Mar 16, 2027 |
| Dec 26, 2025 | 39548502R | ACTIVE | CLASS - 1 | BC3301.13.5 ALTERNATE SUPER: DURING INSPECTION OF AN ACTIVE SITE I REQUESTED TO SEE THE SUPERINTENDENT AND THE COMPET... | $5,000 | $5,000 | Oct 16, 2026 |
| Jun 10, 2025 | 39541281K | RESOLVE | CLASS - 2 | I OBSERVED A FENCE INSTALLED AT EXPOSURE 1 NOT CONSTRUCTED OR MAINTAINED ACCORDING TO CODE. INCORRECT SIZED VIEWING P... | $1,000 | $1,000 | Aug 19, 2025 |
| Jun 3, 2025 | 39540965R | RESOLVE | CLASS - 2 | GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39538911Z ISS... | $1,250 | $1,250 | Mar 10, 2026 |
| Jun 3, 2025 | 39540968M | RESOLVE | CLASS - 2 | GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39538912K ISS... | $1,250 | $1,250 | Mar 10, 2026 |
| Jun 3, 2025 | 39540963N | ACTIVE | CLASS - 2 | GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39538910R ISS... | $1,250 | $1,250 | Mar 10, 2026 |
| Jun 3, 2025 | 39540966Z | RESOLVE | CLASS - 2 | GC FAIL TO FILE CERTIFICATE OF CORRECTION WITH THE DOB. NO CORRECTIVE MEASURES ON RECORD FOR VIOLATION# 39538914Y ISS... | $1,250 | $1,250 | Mar 10, 2026 |
| Apr 9, 2025 | 39538912K | RESOLVE | CLASS - 1 | DURING INSPECTION OF A SITE UNDER SOE PHASE, I OBSERVED THAT THERE WERE NO GUARDRAILS BC 3304.4.4BC 3315.2.2 AROUND T... | $5,000 | $5,000 | Mar 10, 2026 |
| Apr 9, 2025 | 39538911Z | RESOLVE | CLASS - 1 | BC 3303.7.2 FIRE EXTINGUISHERS: DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, WITH A LOT OF WOOD, DEBRIS AND 2 CO... | $5,000 | $5,000 | Mar 10, 2026 |
| Apr 9, 2025 | 39538916H | RESOLVE | CLASS - 2 | BC 3313.1 FLAMMABLE AND COMPRESSED GASES: DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, I OBSERVED 2 COMBUSTIBLE ... | $2,500 | $2,500 | Aug 12, 2025 |
| Apr 9, 2025 | 39538914Y | RESOLVE | CLASS - 1 | BC 3301.2 SAFETY MEASURES: DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, I OBSERVED 4 WORKERS STANDING ON TOP WHA... | $5,000 | $5,000 | Aug 12, 2025 |
| Apr 9, 2025 | 39538909J | RESOLVE | CLASS - 2 | BC 3315.1 RAMPS AND RUNWAYS: DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, I OBSERVED THAT THERE WAS NO WALKING R... | $2,500 | $2,500 | Aug 12, 2025 |
| Apr 9, 2025 | 39538921M | RESOLVE | CLASS - 1 | DURING INSPECTION OF AN ACTIVE SOE SITE ON A STOP WORK ORDER, IT WAS DISCOVERED THAT THE ELECTRICAL POLE AT EX#2 WAS ... | $10,000 | $10,000 | Oct 13, 2026 |
| Apr 9, 2025 | 39538910R | ACTIVE | CLASS - 1 | DURING INSPECTION OF AN ACTIVE SITE AT SOE PHASE, I OBSERVED 5 WORKERS ONSITE, 4 STANDING ON TOP A WALL BRACED WITH W... | $10,000 | $10,000 | Mar 10, 2026 |
| Sep 27, 2024 | 39125962N | RESOLVE | CLASS - 2 | CONSTRUCTION ACTIVITIES NEAR THE POWER/ELECTRICAL POLE ARE IN VIOLATION OF NYC ELECTRICAL CODE 2020, CHAPTER 27, AND ... | $625 | $625 | Jan 7, 2025 |
| Sep 26, 2024 | 39532827Z | RESOLVE | CLASS - 2 | INSPECTION OF A SITE @ EXCAVATION PHASE, I NOTICED THAT THE GATE HAD A HANGING CHAIN AND WAS UNLOCKED; WHEN I ENTERED... | $5,000 | $5,000 | Jan 7, 2025 |
| Sep 26, 2024 | 39532830J | RESOLVE | CLASS - 2 | DURING INSPECTION OF A SITE AT EXCAVATION PHASE, I OBSERVED THAT THERE WAS A LARGE ADVERTISEMENT POSTER AFFIXED TO TH... | $2,500 | $2,500 | Jan 7, 2025 |
| Sep 25, 2024 | 39125835K | RESOLVE | CLASS - 2 | AT TIME OF INSPECTION AT EXP.3 (REAR OF SITE) AND EXP.4 (RIGHT SIDE OF SITE) OBSERVED OPEN, UNPROTECTED EXCAVATED ARE... | $2,500 | $2,500 | Jan 7, 2025 |
| Sep 4, 2024 | 39532058N | RESOLVE | CLASS - 2 | OBSERVED CONSTRUCTION FENCE INSTALLED AT EXP# 1 2 3 4 UPON REVIEWED TO DOB RECORDS INDICATED TEMPORARY CONSTRUCTION F... | $0 | $0 | Nov 12, 2024 |
| May 13, 2024 | 39528552R | RESOLVE | CLASS - 1 | AT INSPECTION, IT WAS OBSERVED: EXCAVATION AND PILE-DRIVEN WORK ON-GOING AT JOBSITE AND UPON REQUEST FOR EARTHWORK NO... | $2,500 | $2,500 | Jan 21, 2025 |
| May 13, 2024 | 39528555M | RESOLVE | CLASS - 2 | AT INSPECTION, IT WAS OBSERVED: CS (WAZIR KHAN) HAS FAILED TO PERFORM HIS DUTIES AS PER BC 3301.13.9, HE FAILED TO CO... | $5,000 | $5,000 | Jul 15, 2025 |
| May 13, 2024 | 39528554K | RESOLVE | CLASS - 2 | AT INSPECTION, IT WAS OBSERVED: STRUCTURAL H-STEEL PIPE ON EXPOSURES 3 & 4 TOWERING ABOVE THE FENCE RANGING BETWEEN A... | $5,000 | $5,000 | Jul 15, 2025 |
| May 13, 2024 | 39528553Z | RESOLVE | CLASS - 2 | AT INSPECTION, IT WAS OBSERVED: UPON REQUEST FOR THE APPROVED SOE DRAWINGS NONE WAS AVAILABLE OR PRESENTED AT JOBSITE... | $1,250 | $1,250 | Jul 15, 2025 |