142-19 Rockaway Boulevard, Queens
Queens • Block 12036 • Lot 0092 • Zip: 11436
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Grand Central 58 min 18 walking, 40 riding
- Times Square 60 min 18 walking, 42 riding
- Penn Station 61 min 18 walking, 43 riding
- Union Square 64 min 18 walking, 46 riding
- Downtown Brooklyn 64 min 18 walking, 46 riding
- Fulton Street 69 min 18 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
Alteration Type II
REPLACE 1 EXISTING BOILER AND INSTALL 1 NEW BOILER. (TOTAL 2) NO CHANGE IN EGRESS, USE AND OCCPUANCY.
-
Alteration Type II
HEREWITH FILED FOR INTERIOR RENOVATION. INSTALLATION OF NEW PARTITIONS, AS PER PLANS INSTALL PLUMBING FIXTURES REPLAC...
2023
-
DOB violation Apr 25, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2022
-
Alteration Type II
REPLACE CELLAR GIRDER WITH NEW STEEL AND REINFORCE FLOOR. CONSTRUCT BOILER ROOM ENCLOSURE. REMEDY ECB VIOLATIONS; 347...
2021
2019
-
CLASS - 1
UNLAWFUL ACTS FAILURE TO COMPLY WITH AN ORDER OF THE COMMISSIONER.RECORDS INDIACATE NO APPLICATION WAS FILED OR CERTI...
-
CLASS - 1
UNAPPROVED/UNSAFE/UNSUITABLE ELECTRICAL EQUIPMENT,APPARATUS MATERIALS,DEVICES,APPLIANCES,OR WIRING IN USE. IN THE BAR...
2017
-
DOB violation Feb 24, 2017
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
2015
-
DOB violation Mar 3, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2013
-
DOB violation Mar 1, 2013
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
2011
-
DOB violation Dec 13, 2011
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
2009
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
-
HPD violation Jul 30, 2009
Class B
SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE WOODEN CABINET AT SINK IN THE KITCHEN LOCATED A...
-
HPD violation Jul 30, 2009
Class A
SECTION 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT SCRAPE AND PAINT W...
-
HPD violation Jul 30, 2009
Class B
SECTION 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE GLASS AND SASH FRAME EAST ROOM LOCATED AT APT 2...
-
HPD violation Jul 30, 2009
Class B
SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE ELECTRCAL WALL OUTLETS IN THE ENTIRE APARTMENT L...
-
HPD violation Jul 30, 2009
Class B
SECTION 27-2005 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE CEILING LIGHT FIXTURES IN THE ENTIRE APARTMENT L...
-
HPD violation Jul 30, 2009
Class B
SECTION 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND C...
2008
-
CLASS - 1
WORK W/O A PERMIT AT TIME OF INSPECTION AT CELLAR LEVEL OBSERVED NEW INSTALLATION OF SHORING SHORING INSTALLED TO SUP...
-
CLASS - 2
FAILURE TO MAINTAIN BLDG NOTED: AT CELLAR LEVEL OF AN EXISTING MIXED USE BLDG FOUND WOOD GIRDER APPROX. 8" X 12" X 30...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records