169-30 Baisley Boulevard, Queens
Queens • Block 12529 • Lot 0230 • Zip: 11434
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 58 min 18 walking, 40 riding
- Times Square 60 min 18 walking, 42 riding
- Penn Station 61 min 18 walking, 43 riding
- Union Square 64 min 18 walking, 46 riding
- Downtown Brooklyn 64 min 18 walking, 46 riding
- Fulton Street 69 min 18 walking, 51 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jun 2, 2026
Class B
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... AT CEILING,LESS THEN 10 SQUARE F...
-
HPD violation Apr 28, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE B...
-
HPD violation Apr 28, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE BATHROOM LOC...
-
HPD violation Apr 28, 2026
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQFT AT CEILING IN ...
-
HPD violation Apr 28, 2026
Class B
§ 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING IN THE KITCHEN LOCA...
-
HPD violation Apr 28, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT CEILING IN THE K...
2025
2022
-
CLASS - 2
FAILURE TO SUBMIT ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WALL ...
-
DOB violation Feb 22, 2022
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2021
-
DOB violation Nov 11, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Nov 11, 2021
E-ELEVATOR ELEVATORREQUIRED
2020
-
DOB violation Oct 31, 2020
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Oct 31, 2020
E-ELEVATOR ELEVATORREQUIRED
-
Alteration Type III
INSTALLATION OF NEW TELECOMMUNICATIONS SHELTER WITH RELATED HVAC, DUNNAGE, AND ANTENNAS ON ROOF. ALL WORK IN COMPLIAN...
-
DOB violation Jun 29, 2020
EARCX-FAILURE TO SUBMIT EER NONE
FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
-
Alteration Type II
INSTALLATION OF NON-EMERGENCY GAS FIRED GENERATOR ON ROOF. INSTALLATION OF RELATED GAS METER AND GAS PIPING AS PER PL...
2018
2017
-
CLASS - 1
C/U 2B10,45B10,45T7,C/U 67X10.(2B10)ALARM BELL DID NOT WORK.(45B10)GOVERNOR DOOR NOT SELF CLOSING.GOVERNOR DOOR NOT L...
-
CLASS - 2
45B10;45T7;98M7/(45,B,10)GOVERNOR DOOR NOT SELF CLOSING;(45,T,7)GOVERNOR DOOR NOT LABEL;(98,M,7)CAT 5 TAG MISSING.
2016
-
Alteration Type II
INSTALLATION OF SPRINKLER SYSTEM, SPRINKLER BOOSTER PUMP AND WATER MAIN IN CONJUNCTION WITH NB# 420605919.
-
Alteration Type III
PROPOSE TO REPLACE 14.92 TO 29.08 FEET WIDE SIDEWALK -150.91 LINEAR FEET OF STREET FRONTAGE OF THE PROPERTY ON SOUTH ...
-
Alteration Type II
INSTALLATION OF AN AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM.
2015
2013
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records