147 Beach 26 Street, Queens
Queens • Block 15818 • Lot 0163 • Zip: 11691
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days agoAround this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Places nearby
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jan 30, 2026
Class B
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLER HEAD AT SOUTH WALL AT PUBLIC HALL...
2025
-
HPD violation May 5, 2025
Class C
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF SCALDING HOT WATER EXCEEDING MAXIMUM TEMPERATURE OF...
-
HPD violation May 5, 2025
Class C
§ 27-2043.1 HMC INSTALL THE MISSING OR REPAIR/REPLACE THE DEFECTIVE WINDOW GUARD(S) IN ACCORDANCE WITH THE SPECIFICAT...
-
HPD violation May 5, 2025
Class C
§ 27-2005 ADM CODE & 309 M/D LAW ABATE THE NUISANCE CONSISTING OF PAINTED SPRINKLER HEAD, SOUTH WALL AT 3 STORY AT PU...
-
HPD violation May 5, 2025
Class A
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CORRODED METAL BALCONY BOTTOM RAIL I...
-
HPD violation May 5, 2025
Class B
28 RCNY § 25-171; & 67 (7)(B) MDL; NYC FIRE CODE § 703.1.3; NYC FIRE CODE § 703.2: ADJUST DOOR TO PREVENT GAPS BETWEE...
2021
2020
2014
2012
2007
-
New Building
-
Non-Hazardous
16M07, 84B07. 16-INSTALL 84"HOISTWAY DOOR TO LOWER LANDING. 84-PROVIDE FULL HOISTWAY ENCLOSURE.
2006
2005
2004
2003
-
DOB violation Nov 13, 2003
C-CONSTRUCTION OTHER OPTIONAL
-
Non-Hazardous
WORK DOES NOT CONFORM TO APPROVED PLANS NON CONFORMING WORK IS THAT 1ST FLOOR CALLED FOR 4" CONCRETE SLAB CONTRACTOR ...
-
Hazardous
FAILURE TO FILE TR1 PIOR TO START OF CONTROLLED WORK NO TR1 ON FILE FOR LAMINATED WOOD I BEAMS & LIGHT WEIGHT C JOIST...
-
Non-Hazardous
NON COMPLANCE WITH TABLE 3-4 FOR II B CONSTRUCTION (1) PARTY WALL ABOVE ROOF IS FRAMED WITH CONBUSTIBLE MEMBER STUDS ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records