Colfax Avenue, Staten Island
Staten Island • Block 03577 • Lot 0007 • Zip: 10306
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days agoAround this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Activity
Sales, filings, permits and violations from every dataset, in one order.
2011
-
Alteration Type I
-
Alteration Type II
PROPOSED PLUMBING FIXTURES FOR MEDICAL SUITE - LOCATED ON A PORTION OF THE FIR ST FLOOR. FIT-OUT OF MEDICAL SUITE FIL...
2010
2009
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
-
DOB violation Dec 31, 2009
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
-
CLASS - 2
SEC BC 3301.9.1 & 27-04 RCNY MISC VIOL: FAIL TO PROVIDE A SIGN WITH THE WORDING "TO ANONYMOUSLY REPORT UNSAFE CONDITI...
-
CLASS - 2
SEC 3304.3.1 & 27-195 MISC VIOL: FAIL TO NOTIFY DOB WITHIN 24-48 HRS OF THE START OF EXCAVATION. AT TIME OF INSPECTIO...
-
CLASS - 2
SEC BC 3307.7 & 27-1021 MISC VIOL: FAIL TO PROVIDE & REQUIRED CONST FENCE. AT TIME OF INSPECTION OBSERVED A SECTION O...
-
CLASS - 2
SEC BC 3314.8 & 27-1009A MISC VIOL: FAIL TO PROVIDE REQUIRED GUARDRAILS & TOE BOARDS FOR SCAFFOLDING PLATFORM. AT TIM...
-
CLASS - 2
FAIL TO POST PROVIDE/POST SIGN AT JOB SITE PURSUANT TO SUBSECTION. AT TIME OF INSPECTION OBSERVED NO CONTRACTOR SIGN ...
-
CLASS - 2
SEC 1704.1.1 & 27-132 MISC VIOL: FAIL TO FILE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY PRIOR TO PERMIT ISSUAN...
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 1, 2009
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2008
2007
-
DOB violation Jan 19, 2007
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
-
DOB violation Jan 19, 2007
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2003
-
Alteration Type I
MINOR INTERIOR PARTITIONS WORK ON BSMT.L EVEL. MINOR INTERIOR WORK ON FL FUNERAL HOME WITH THE ADD OF A 2NDARY MEANS ...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records