265-269 West 37 Street, Manhattan
Manhattan • Block 00787 • Lot 0001 • Zip: 10018
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 9 min 4 walking, 5 riding
- Union Square 15 min 4 walking, 11 riding
- Times Square 16 min 4 walking, 12 riding
- Penn Station 22 min 4 walking, 18 riding
- Fulton Street 23 min 4 walking, 19 riding
- Downtown Brooklyn 31 min 4 walking, 27 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Elder
No description yet
Keens Steakhouse
Keens Steakhouse is a legendary New York City institution known for its historic charm and exceptional steaks. The el...
Los Tacos No. 1
Experience the authentic flavors of Mexico at Los Tacos No. 1! Located in the heart of NYC, enjoy hand-pressed tortil...
Nan Xiang Xiao Long Bao
No description yet
Sky Pavilion
Sky Pavilion is a rooftop restaurant offering stunning views of the New York City skyline. Enjoy modern American cuis...
Markette
No description yet
The View
No description yet
Tonchin
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
I OBSERVED IN "BARBIE DUNKIN' DREAM HOUSE" INSTALLATION/REPLACEMENTS OF LIGHT FIXTURES THROUGHOUT THE STORE WITHOUT A...
-
CLASS - 1
I OBSERVED INSTALLATION OF THREE NEW ILLUMINATED SIGNS "BARBIE DUNKIN' DREAMHOUSE" WITH AND APPROXIMATELY DIMENSIONS ...
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
Alteration Type II
CYCLE 8 FISP FACADES REPAIRS. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.
2024
-
CLASS - 2
OBSERVED SIDEWALK SHED IN PLACE AT EXP#1&4 NOT AS PER DRAWINGS. OBSERVED DRAWINGS CALLS FOR 20FT HIGH SHED WITH 3X2" ...
-
CLASS - 2
AT TIME OF INSPECTION OBSERVED SIDEWALK SHED ERECTED AT EXPOSURE #1- .OBSERVED NO LIGHT UNDER THE SIDEWALK SHED CREAT...
2023
2022
2021
-
CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONERS ORDER TO FILE A CERTIFICATE OF CORRECTION WITH THE DEPARTMENT OF BUILDINGS OF BU...
-
CLASS - 2
PEDESTRIAN PROTECTION DOESN'T MEET CODE SPECIFICATIONS @TIME OF INSPECTION RESPONDING TO COMPLAINT ON 23STYBLDG OBSER...
2019
-
Alteration Type II
MILLWORKS FOR REPLACEMENT OF EXISTING COUNTER AND CABINETS; NEW FLOORING, LIGHTING, PAINTING. NO CHANGE IN USE, EGRES...
-
Alteration Type III
PROPOSED FACADE SSP FILING (AS ALT3) IN CONJUNCTION WITH DOB JOB #: 123817735 FOR ADDITIONAL WORK. NO WORK PERMIT SHA...
2018
-
Alteration Type II
INSTALL TWO (2) GAS FIRED HIGH PRESSURE BOILERS, GAS METERS AND PIPING AND BOILER ROOM ENCLOSURES. NO CHANGE IN EGRES...
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records