754 9 Avenue, Manhattan
Manhattan • Block 01041 • Lot 0062 • Zip: 10019
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 5 days ago- Times Square 17 min 10 walking, 7 riding
- Penn Station 18 min 10 walking, 8 riding
- Grand Central 25 min 10 walking, 15 riding
- Union Square 28 min 10 walking, 18 riding
- Fulton Street 30 min 10 walking, 20 riding
- Downtown Brooklyn 35 min 10 walking, 25 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Gallaghers Steakhouse
Iconic steakhouse offering classic cuts & raw bar items in renovated digs with red banquettes.
Le Bernardin
No description yet
Chalong
No description yet
Los Tacos No. 1
Experience the authentic flavors of Mexico at Los Tacos No. 1! Located in the heart of NYC, enjoy hand-pressed tortil...
Sullivan Street Bakery
No description yet
Yingtao
No description yet
Jaz Indian Cuisine
No description yet
HYDERABADI ZAIQA
Hyderabadi Zaiqa offers authentic Hyderabadi cuisine in the heart of New York City. Featuring flavorful biryanis, keb...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
2023
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Jun 20, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
-
DOB violation Apr 25, 2023
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
2019
-
DOB violation Nov 8, 2019
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
2018
-
Place of Assembly
2015
-
DOB violation Mar 3, 2015
LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
2013
-
Alteration Type II
PROVIDE CONVENIENCE OPENING BETWEEN 754 AND 756 NINTH AVENUE ON THE FIRST FLOOR. NO CHANGE IN EGRESS, USE OR OCCUPANC...
2011
-
Alteration Type III
INSTALLATION OF 37 LINEAR FT OF HEAVY DUTY SIDEWALK SHED FOR BUILDING ALTERNATION, FILED SEPARATELY. LIVE LOAD 300 PS...
2010
2006
-
Alteration Type II
Install kitchen fire suppression system, as shown on plan. No change in use, occupancy, or egress.
2005
-
Alteration Type II
INTERIOR PLUMBING AND MECHANICAL WORK AT 1ST FL AND CELLAR. ALT I FILED FOR USE. NO CHANGE IN USE, EGRESS OR OCCUPANC...
-
Alteration Type II
Interior sprinkler work in the cellar,25 new heads. No change of use, egress or occupancy under this application.
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records