115 Stanwix Street, Brooklyn
Brooklyn • Block 03139 • Lot 0021 • Zip: 11206
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Union Square 39 min 7 walking, 32 riding
- Fulton Street 39 min 7 walking, 32 riding
- Downtown Brooklyn 43 min 7 walking, 36 riding
- Grand Central 50 min 7 walking, 43 riding
- Times Square 51 min 7 walking, 44 riding
- Penn Station 53 min 7 walking, 46 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Bark Barbecue
No description yet
Otis
No description yet
Eyval
Eyval is a cozy eatery in the heart of Brooklyn offering a fusion of Mediterranean and Turkish cuisine. With a warm a...
Nene’s Deli Taqueria
No description yet
Blue Hour
No description yet
Roberta's
Pizza place
Maloya
Maloya is a hidden gem in Brooklyn, offering a unique mix of eclectic decor and delicious cuisine. Enjoy a cozy atmos...
Carmenta’s
Carmenta’s is a cozy Italian restaurant in the heart of Brooklyn, serving up authentic dishes made with fresh, locall...
Available to rent
2 listings on the market in this building, from the feeds Hoodkit aggregates.
-
Unit 616 $3,350
-
Unit 415 $3,350
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
HPD violation Jul 6, 2026
Class A
§ 27-2017.3 HMC: TRACE AND REPAIR THE SOURCE AND ABATE THE VISIBLE MOLD CONDITION... LESS THAN 10 SQ FT AT CEILING IN...
-
HPD violation Jul 6, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 2nd ROOM FROM EAST LOCATED AT APT...
-
HPD violation Jul 6, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT AT CEILING AND WEST WALL AT ...
-
HPD violation Jul 6, 2026
Class B
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FIRE RETARDANT PLASTER AT CEILING AT...
-
HPD violation Jul 1, 2026
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR THE CEILING IN THE ...
-
HPD violation Jul 1, 2026
Class C
§ 27-2005, 2007 ADM CODE REMOVE THE ILLEGAL FASTENING KEY OPERATED DOUBLE CYLINDER LOCK INSTALLED AT VESTIBULE DOOR
2024
-
DOB violation Dec 1, 2024
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2022
-
CLASS - 2
FAILURE TO SUBMIT AN ACCEPTABLE REQUIRED CYCLE 9A REPORT OF CRITICAL EXAMINATION DOCUMENTING CONDITION OF EXTERIOR WA...
-
CLASS - 2
FAILURE TO MAINTAIN EXTERIOR BLDG WALLS & APPURTENANCES.AS NOTED:AT TIME OF INSPECTION I OBSERVED ON EXP.#1,2,3 & 4;F...
-
DOB violation Feb 22, 2022
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022
2021
-
DOB violation Oct 9, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Oct 9, 2021
E-ELEVATOR ELEVATORREQUIRED
-
DOB violation Oct 9, 2021
E-ELEVATOR ELEVATORREQUIRED
2020
-
DOB violation Oct 19, 2020
E-ELEVATOR ELEVATORREQUIRED
2019
-
New Building
SIDEWALK SHED FILED IN CONJUNCTION WTIH NB JOB NUMBER 321087131
-
Alteration Type III
-
Alteration Type II
INSTALLATION OF REPEATER AUXILIARY RADIO COMMUNICATION SYSTEM WITH A PASSIVE DISTRIBUTED ANTENNA SYSTEM IN CONJUNCTIO...
-
Alteration Type II
TEMPORARY STANDPIPE FILED IN CONJUNCTION WITH ALT 2 JOB NUMBER 321088425.
-
Alteration Type II
INSTALLATION OF AUTOMATIC SMOKE/HEAT/CO DETECTION & SPRINKLER FIRE ALARM SYSTEM WITH PURGE IN CONJUNCTION WITH NB...
2018
-
CLASS - 1
BC3314.4.3.3:INSTALLASTION INSPECTION FOR SUPPORTED SCAFFOLD.NOTE:AT TIME OF MY INSPECTION OF A 8 STORY BLDG AT ROOF ...
-
CLASS - 2
FAILURE TO INSTITUTE AND MAINTAIN SAFETY EQUIPMENT MEASURES AND TEMP CONSTRUCTION.NOTE:AT TIME OF MY INSPECTION OF A ...
-
CLASS - 1
BC3314.8.2:DEBRIS NETTING.NOTE;AT THE TIME OF MY INSPECTION OF A 8 STORY BLDG AT ROOF LEVEL CONSTRUCTION WORK I PROGR...
2017
2015
2014
2005
2003
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records