Luna Park Village Co Op, Brooklyn
Brooklyn • Block 07268 • Lot 0001 • Zip: 11224
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 45 min 3 walking, 42 riding
- Union Square 49 min 3 walking, 46 riding
- Fulton Street 52 min 3 walking, 49 riding
- Times Square 53 min 3 walking, 50 riding
- Grand Central 59 min 3 walking, 56 riding
- Penn Station 60 min 3 walking, 57 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Bus
Places nearby
Totonno's
No description yet
Georgian Corner
No description yet
Liman
Seafood is the focus of this Turkish restaurant with cocktails & mural-rich, nautical decor.
Gargiulo's
Tuxedo-clad waiters serve old-school Italian fare at this circa-1907 banquet hall-style eatery.
Ruby's Bar & Grill
Beachfront landmark designed with 1920s boardwalk wood doling out beers, cocktails & American grub.
Nathan's Famous
Brooklyn-born fast-food chain offering signature hot dogs, fries, burgers & more.
Pete's Clam Stop
No description yet
Williams Candy Shop
No description yet
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENTS RECORDS: ATOI ACCESS TO TH...
-
HPD violation Mar 25, 2026
Class C
§ 27-2005, 27-2007, 27-2041.1 HMC, §238, § 309; § 107 (2) ( C) MDL AND 28 RCNY §25-171: REPLACE OR REPAIR THE SELF-CL...
-
HPD violation Jan 28, 2026
Class A
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL WALLS AND CEILINGS IN TH...
-
HPD violation Jan 28, 2026
Class B
§ 27-2026 ADM CODE REPAIR THE LEAKY AND/OR DEFECTIVE FAUCETS AT SIMK IN THE KITCHEN LOCATED AT APT 3N, 3rd STORY, 1st...
-
HPD violation Jan 16, 2026
Class B
§ 27-2045(B)(1)(A) HMC, § 12-01, § 12-03 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL SMOKE DETECTING ...
-
HPD violation Jan 16, 2026
Class B
§ 27-2045(B)(1)(B) HMC, § 12-06, § 12-07, § 12-09 RCNY REPAIR, REPLACE OR PROVIDE AN APPROVED AND OPERATIONAL CARBON ...
2025
-
HPD violation Aug 12, 2025
Class B
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR ALL WALLS AND CEILI...
-
CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY THE CERTIFICATE OF OCCUPANCY OR BUILDING DEPARTMENT RECORDS. RECORDS STATED C O...
2024
-
CLASS - 2
OCCUPANCY CONTRARY TO THAT ALLOWED BY CERTIFICATE OF OCCUPANCY OR BUILDINGS DEPT RECORDS. NOTED: OBSERVED THE FIRST F...
-
CLASS - 2
FAILURE TO COMPLY WITH COMMISSIONER'S ORDER CONTAINED IN SUMMONS #38273193X ISSUED ON 7/4/2020, AND FAILURE TO FILE A...
2023
-
CLASS - 1
CEASE USE ITEM: WORN/MISLIGNED BRAKE PADS. 125% BRAKE TEST AND SEAL ADJUSTMENTS AS PER 8.6.4.20.4 CLASS 2 ITEMS: WORN...
-
CLASS - 2
MISALIGNED CAB MIRROR. REPLACE WORN GIBS WHERE NEEDED. OIL LEKING INTO OVERHEAD/DEFLECTOR SHEAVE. SEAL HOIST MACHINE ...
-
Alteration Type II
FILING APPLICATION IN CONJUNCTION WITH APPLICATION 320709140 FOR OT WORK TYPE ONLY.
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
-
DOB violation Feb 22, 2023
FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED
FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023
2021
-
DOB violation Aug 2, 2021
E-ELEVATOR ELEVATORREQUIRED
2019
-
Alteration Type II
INSTALLATION OF MECHANICAL SYSTEM AND RELATED GAS PIPING FOR NEW COGEN UNITS. INSTALL NEW BOILER AND RELATED PIPING A...
-
Alteration Type II
INSTALLATION OF COGENARATION UNIT AND RELATED PIPING. INSTALL NEW GAS METER AND BUILD A NEW BLOCK WALL AS PER PLANS F...
-
Alteration Type II
INSTALLATION OF COGENARATION UNIT AND RELATED PIPING. INSTALL NEW GAS METER AND BUILD A NEW BLOCK WALL AS PER PLANS F...
-
Alteration Type II
INSTALLATION OF COGENARATION UNIT AND RELATED PIPING. INSTALL NEW GAS METER AND BUILD A NEW BLOCK WALL AS PER PLANS F...
-
Alteration Type II
NEW BATHROOM ON 1ST FLOOR SEE CONSTRUCTION DOCUMENTS FOR COMPLETE PROJECT SCOPE AND DETAILS
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Registration Contracts
Contact information from multiple dwelling registrations
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records