786-808 East 92 Street, Brooklyn
Brooklyn • Block 08117 • Lot 0026 • Zip: 11236
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 4 days ago- Downtown Brooklyn 45 min 22 walking, 23 riding
- Fulton Street 51 min 22 walking, 29 riding
- Penn Station 60 min 22 walking, 38 riding
- Times Square 61 min 22 walking, 39 riding
- Union Square 61 min 22 walking, 39 riding
- Grand Central 64 min 22 walking, 42 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Railroad
Bus
Citi Bike
Places nearby
Rockaway Gourmet
Deli
Tropical Smoothie Cafe
Health-conscious cafe chain featuring a menu of custom smoothies, sandwiches & wraps.
Atlantis Diner
Mexican restaurant
Railroad Playground
Railroad Playground is a charming park in Brooklyn with a train theme, featuring a mini train station, tracks, and pl...
Tasty Delicious Bakery & Restaurant
Jamaican restaurant
Activity
Sales, filings, permits and violations from every dataset, in one order.
2026
-
CLASS - 1
USER JC STEEL ERECTORS UNDER CRANE OPERATIONS CN 367/26, DAVID ALLEN PERFORMING RIGGING OPERATIONS ON STRUCTURAL COLU...
-
CLASS - 1
AT GUIANFIA CORP SITE,UNDER CRANE OPERATIONS CN 367/26, DAVID ALLEN PERFORMING RIGGING OPERATIONS ON STRUCTURAL COLUM...
-
Alteration Type III
PROPOSED 509 LF OF BUILDERS PAVEMENT PLAN ASSOCIATED WITH DOB NOW NB APPLICATION #B01187717-I1 FILED AS PART OF MAJOR...
-
CLASS - 1
AT THE TIME OF MY INSPECTION OF A 1 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, I OBSERVED RAMP APPROXIMATELY ...
-
CLASS - 1
AT THE TIME OF MY INSPECTION OF A 1 STORY NEW BUILDING AT FOUNDATION/EXCAVATION PHASE, I OBSERVED SOLDIER PILES AND L...
-
CLASS - 1
AT THE TIME OF MY INSPECTION OF A 1 STORY NEW BUILDING AT FOUNDATION PHASE, I OBSERVED RAMP AND OFFICE TRAILER AT JOB...
2025
2023
2021
-
Alteration Type II
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
-
DOB violation Apr 29, 2021
EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE
FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
2020
-
Alteration Type II
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
2013
2007
-
Alteration Type II
PROPOSED SPRINKLER WORK TO CONVERT A DRY TO A WET SYSTEM NO CHANGE IN US E EGRESS OR OCCUPANCY
2006
2003
-
Alteration Type II
REPLACE EXISTING UNIT WITH NEW ROOFTOP. PACKAGED UNIT LUXAIR MDL #DACT090N165-MEA 165-92-E VOL #5. NO CHANGE IN OCCUP...
-
Alteration Type II
CHANGE DRY VALVE SYSTEM WITH COMPRESSOR INSTALL FIRE ALARM VALVE RECONNECT SIAME FOR WET PIPE SYSTEM. NO CHANGE IN OC...
2002
2001
1993
-
DOB violation Dec 8, 1993
C-CONSTRUCTION OTHER OPTIONAL
-
DOB violation Dec 8, 1993
C-CONSTRUCTION OTHER OPTIONAL
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records