32-11-32-19 Hunters Point Avenue, Queens
Queens • Block 00259 • Lot 0001 • Zip: 11101
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 3 days ago- Grand Central 25 min 9 walking, 16 riding
- Times Square 28 min 9 walking, 19 riding
- Penn Station 36 min 9 walking, 27 riding
- Union Square 36 min 9 walking, 27 riding
- Fulton Street 42 min 9 walking, 33 riding
- Downtown Brooklyn 50 min 9 walking, 41 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Ferry
Bus
Citi Bike
Places nearby
Wonder Pig K-BBQ
Korean barbecue restaurant
Spicy Nepal
No description yet
Rincón Melania
Relaxed restaurant specializing in Ecuadorian cuisine, including seafood dishes & hearty stews.
The Hungry Gnome
Bakery
The Kasbah Café
Algerian Restaurant
Sensible Edibles Bakery
Bakery
The Mulligans Golf Club
Sports bar
Royal Delight Cafe - Coffee Shop, Catering & Events
Royal Delight Cafe offers a cozy and inviting atmosphere for coffee lovers and food enthusiasts. From delicious coffe...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2025
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
-
DOB violation Nov 14, 2025
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
2023
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
-
DOB violation Jun 30, 2023
HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED
VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
2021
-
Alteration Type II
POINTING AND REPLACEMENT OF DAMAGED BRICK FOR THE BUILDING FACADE TO RESOLVE ECB VIOLATION# 35475588R. NO CHANGE OF U...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT. NOTE: AT TIMEOF MY INSPECTION OBSERVED SIDEWALK SHED INSTALL...
-
CLASS - 2
PEDESTRIAN PROTECTION DOES NOT CODE SPECIFICATIONS SIDEWALK SHED NOT MAINTAIN AS REQUIRED.NOTE:AT TIME OF MY INSPECTI...
-
CLASS - 1
WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENT.NOTE:AT TIME OF MY INSPECTION OBSERVED SIDEWALK INSTALLED AT ...
-
CLASS - 2
FAILURE TO MAINTAIN OR INSTALLED SIDEWALK SHED. NOTE: AT TIME OF MY INSPECTION OF A 1 STY BLDG FACADE REPAIR WORKING ...
2020
-
CLASS - 2
PEDESTRIAN PROTECTION DOES NOT MEET SPECIFICATION #3307.6.4.8 NOTE AT THE TIME OF MY INSPECTION I OBSERVED A SIDEWLAK...
2007
-
Alteration Type II
INSTALL FIXTURES TO ACCOMMODATE A FOOD PROCESSING ESTABLISHMENT (UG17, COMM) IN AN EXISTING MANUFACTURING SPACE (UG17...
-
Alteration Type II
INSTALL FIVE (5) HIGH PRESSURE BOILERS FOR FOOD PROCESSING PLANT (NOTE: THREE (3) BOILER TO BE MOVED FROM 108 CHARLTO...
-
Non-Hazardous
B4A,50A.50A-TEST GAUGE CONNECTION MISSING FOR STEAM GAUGE.
2005
2004
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Recent Building Permits
Owner information from recent DOB NOW filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records