Skip to content

Job filings

111 Street, Queens • Block 02018 • Lot 0001

669 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Jul 1, 2013 420458267 Alteration Type II PLAN EXAM - DISAPPROVED ALTER EXISTING FIRE ALARM SYSTEM TO ACCOMMODATE PROPOSED RENOVATION $25,000 USTA NATIONAL TENNIS CENTER
Jun 17, 2013 420583942 Alteration Type III SIGNED OFF SIDEWALK SHED PROPOSED INSTALLATION OF SIDEWALK SHED AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. $0 SPRING SCAFFOLDING LLC
May 8, 2013 420589321 Alteration Type III SIGNED OFF HOSPITALITY - ERECT PRE-ENGINEERED FREE STANDING WALL PANEL SYSTEM, LOCATED WITHIN THE INDOOR TENNIS BUILDING. $15,000 USTA NATIONAL TENNIS CENTER
May 3, 2013 401707079 Alteration Type II SIGNED OFF To install temporary natural gas piping for temporary Co-Generation unit to be used during the 2003 US Tennis Tournam... $3,000 USTA National Tennis Center
Apr 17, 2013 420598348 Alteration Type III SIGNED OFF PROVIDE TEMPORARY LIGHTING TRUSSES FOR USTA OPENING NIGHT LIGHT SHOW ON AUG 27, 2012 AT 12 LOCATIONS AT CONCOURSE (LE... $6,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420620466 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY DINING TRAILER TO BE USED DURING THE 2012 US OPEN TENNIS TOURNAMENT FROM AUGUST 20, 2012 THRU ... $790,504 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420616952 Alteration Type III SIGNED OFF ERECT TEMPORARY RUSSIAN TV STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420616462 Alteration Type III SIGNED OFF ERECT TEMPORARY SKY SPORT TV STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420616453 Alteration Type III SIGNED OFF ERECT TEMPORARY GALLERY TV STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420601575 Alteration Type III SIGNED OFF INSTALL TEMPORARY MERCEDES DISPLAY TENT FOR USE DURING THE 2012 US OPEN TENNIS TOURNAMENT FROM AUG 20, 2012 THRU SEPT... $230,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420601361 Alteration Type III SIGNED OFF INSTALL TWO GLASS KIOSK'S LOCATED ON SOUTH SIDE OF ARTHUR ASHE STADIUM FOR USE DURING THE 2012 US OPEN TENNIS TOURNAM... $30,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420601352 Alteration Type III SIGNED OFF INSTALL TEMPORARY AMEX EXPERIENCE DISPLAY LOCATED ON FLOOR 001 OF THE INDOOR TENNIS BUILDING FOR USE DURING THE 2012 ... $150,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420598366 Alteration Type III SIGNED OFF CONSTRUCT NEW TEMPORARY STAGE FOR USE DURING THE US OPEN, ARTHUR ASHE KIDS DAY ON AUGUST 25, 2012. $6,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420598357 Alteration Type III SIGNED OFF PROVIDE TEMPORARY PROJECTION TOWER FOR USTA OPENING NIGHT LIGHT SHOW ON AUG 27, 2012 AT 12 LOCATED ON ROOF OF LEVEL 0... $14,000 USTA NATIONAL TENNIS CENTER
Jan 15, 2013 420594716 Alteration Type III SIGNED OFF REPAIRS TO CONCRETE SPALLING AND CRACKING THROUGHOUT LOUIS ARMSTRONG STADIUM $90,000 USTA NATIONAL TENNIS CENTER
Dec 3, 2012 420616961 Alteration Type III SIGNED OFF ERECT TEMPORARY BASE LINE STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Dec 3, 2012 420616989 Alteration Type III SIGNED OFF ERECT TEMPORARY ESPN STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Dec 3, 2012 420616934 Alteration Type III SIGNED OFF ERECT TEMPORARY ESPN INTERNATIONAL STAGE FOR 2012 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Nov 21, 2012 420620457 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY BROADCAST TRAILER TO BE USED DURING THE 2012 US OPEN TENNIS TOURNAMENT FROM AUGUST 20, 2012 TH... $790,504 USTA NATIONAL TENNIS CENTER
Oct 18, 2012 420622909 Alteration Type II SIGNED OFF ERECT VARIOUS TENTS AND PLATFORMS AND OTHER PRODUCTION EQUIPMENT PER SITE PLAN FOR MAKER'S FAIRE IN FLUSHING MEADOWS/... $100,000 O'REILLY MEDIA INC.
Aug 10, 2012 420596386 Alteration Type III SIGNED OFF INSTALL TEMP. TENTS, PROPOSED TO INSTALLED TENTS, ORTABLE TOILETS, STAGES TO BE USED IN AN OUTSIDE PLACE OF PUBLIC AS... $10,000 HONG KONG DRAGON BOAT FESTIVAL
Aug 8, 2012 420053596 Alteration Type III SIGNED OFF INSTALL TEMP. TENTS, PROPOSED TO INSTALLED TENTS, ORTABLE TOILETS, STAGES TO BE USED IN AN OUTSIDE PLACE OF PUBLIC AS... $10,000 HONG KONG DRAGON BOAT FESTIVAL
Aug 7, 2012 420474427 Alteration Type II SIGNED OFF TO CONSTRUCT THREE TEMPORARY STRUCTURES (2 SIDE AND 1 CENTER) LOCATED ON THE INTERIOR TENNIS COURTS OF THE FIRST FLOO... $25,000 USTA NATIONAL TENNIS CENTER
Jul 25, 2012 420462234 Place of Assembly PLAN EXAM - DISAPPROVED $0 USTA NATIONAL TENNIS CENTER
Jul 12, 2012 420590532 Alteration Type III PLAN EXAM - APPROVED ERECTION PROCEDURES AND RIGGING COMPONENTS FOR INSTALLATION OF NEW PANASONIC VIDEO BOARDS AT THREE LOCATIONS THROUGH ... $136,800 USTA NATIONAL TENNIS CENTER
Jul 12, 2012 420590523 Alteration Type III PLAN EXAM - APPROVED ERECTION PROCEDURES AND RIGGING COMPONENTS FOR INSTALLATION OF NEW PANASONIC VIDEO BOARDS AT TWO LOCATIONS THROUGH OU... $85,800 USTA NATIONAL TENNIS CENTER
Jun 5, 2012 420204987 Alteration Type II SIGNED OFF OFFICE BUILD-OUT FOR ADVANCED MEDIA OFFICES LOCATED AT THE INDOOR TENNIS BUILDING THIRD FLOOR. INTERIOR WORK ONLY. NO... $62,000 USTA NATIONAL TENNIS CENTER
May 22, 2012 420551389 Demolition SIGNED OFF DEMOLITION OF CONCESSION STAND $0 ANCHOR CONTRACTORS
May 18, 2012 410131619 Alteration Type III SIGNED OFF SOUTH SIDE EXTERIOR SCISSORS STAIR WILL HAVE EXISTING DIAMOND PLATE LANDINGS REPLACED WITH NEW DIAMOND STEEL PLATE. T... $50,000 USTA NATIONAL TENNIS CENTER
Mar 15, 2012 410118064 Alteration Type II SIGNED OFF INSTALLATION OF SPRINKLER SYSTEM THROUGHOUT BUILDING AND SPRINKLER WATER MAIN, FILED IN CONJUNCITON WITH NB #40228581... $3,000 USTA NATIONAL TENNIS CENTER INC
Nov 29, 2011 420459015 Alteration Type III SIGNED OFF MINOR INTERIOR PARTITON CHANGES. NO CHANGE TO USE, OCCUPANCY OR EGRESS. $5,000 USTA NATIONAL TENNIS CENTER
Nov 29, 2011 420469549 Alteration Type III SIGNED OFF HOSPITALITY - ERECT PRE-ENGINEERED FREE STANDING WALL PANEL SYSTEM, LOCATED WITHIN THE INDOOR TENNIS BUILDING. $15,000 USTA NATIONAL TENNIS CENTER
Nov 21, 2011 420468185 Alteration Type III SIGNED OFF INSTALL TEMPORARY MERCEDES DISPLAY TENT FOR USE DURING THE 2011 US OPEN TENNIS TOURNAMENT FROM AUGUST 22, 2011 THRU S... $230,000 USTA NATIONAL TENNIS CENTER
Nov 1, 2011 420470582 Alteration Type III SIGNED OFF PROVIDE TEMPORARY LIGHTING TRUSSES FOR USTA OPENING NIGHT LIGHT SHOW ON AUG. 28, 2011 AT 12 LOCATIONS AT CONCOURSE (L... $6,000 USTA NATIONAL TENNIS CENTER
Nov 1, 2011 420470555 Alteration Type III SIGNED OFF PROVIDE TEMPORARY PROJECTION TOWER TO BE USED FOR USTA OPENING NIGHT LIGHT SHOW ON AUG 28,2011, LOCATED ON ROOF OF LE... $14,000 USTA NATIONAL TENNIS CENTER
Nov 1, 2011 420478922 Alteration Type III SIGNED OFF ERECT TEMPORARY ESPN TELEVISION PLATFORM FOR 2011 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Nov 1, 2011 420475925 Alteration Type III SIGNED OFF CONSTRUCT NEW TEMPORARY STAGE FOR USE DURING THE US OPEN, ARTHUR ASHE KIDS DAY ON AUGUST 27, 2011. $6,000 USTA NATIONAL TENNIS CENTER
Nov 1, 2011 420247254 Alteration Type III SIGNED OFF ERECT TEMPORARY BLUE SKY PLATFORM FOR 2010 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Oct 26, 2011 420247245 Alteration Type III SIGNED OFF ERECT TEMPORARY RUSSIAN TV PLATFORM IN STADIUM 2-3 FOR 2010 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Oct 24, 2011 420475104 Alteration Type III SIGNED OFF ERECT TEMPORARY RUSSIAN TV PLATFORM IN STADIUM 2-3 FOR 2011 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Oct 24, 2011 420475676 Alteration Type III SIGNED OFF ERECT TEMPORARY GALLERY TELEVISION PLATFORM FOR 2011 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Oct 24, 2011 420475113 Alteration Type III SIGNED OFF ERECT TEMPORARY SKY SPORT PLATFORM FOR 2011 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Oct 18, 2011 420468194 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY TRAILER TO BE USED DURING THE 2011 US OPEN TENNIS TOURNAMENT FROM AUGUST 22, 2011 THRU SEPTEMB... $176,178 USTA NATIONAL TENNIS CENTER
Oct 18, 2011 420468201 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY TRAILER TO BE USED FURING THE 2011 US OPEN TENNIS TOURNAMENT FROM AUGUST 22, 2011 THRU SEPTEMB... $790,504 USTA NATIONAL TENNIS CENTER
Oct 13, 2011 420468176 Alteration Type III SIGNED OFF HEINEKEN SPACE ERECT PRE-ENGINEERED FREE STANDING WALL PANEL SYSTEM, LOCATED WITHIN THE INDOOR TENNIS BUILDING, DURIN... $4,267 USTA NATIONAL TENNIS CENTER
Sep 30, 2011 420235999 Alteration Type III SIGNED OFF TRUCK DOCK WALL, DIAMOND PLATE THREADHOLDS, STAIR & SLAB REPAIRS FOR ARTHUR ASHE STADIUM #1. $53,130 USTA NATIONAL TENNIS CENTER
Sep 26, 2011 420483934 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK FILING FOR KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH NEW BUILDING JOB#400328409, AS SHOWN ON PLAN. NO PLUMB... $7,000 USTA NATIONAL TENNIS CENTER
Sep 22, 2011 401188754 Alteration Type I SIGNED OFF Alteration involving horizontal and vertical enlargement as per submitted drawin gs. $100,000 NYC Dept.
Sep 22, 2011 420477166 Alteration Type II SIGNED OFF ERECT VARIOUS RENTAL TENTS AND PLATFORMS AND OTHER PRODUCTION EQUIPMENT PER SITE PLAN FOR MAKER'S FAIRE IN FLUSHING M... $100,000 O'REILLY MEDIA INC.
Sep 8, 2011 420466230 Alteration Type III SIGNED OFF INSTALL TEMP. TENTS, PROPOSED TO INSTALLED TENTS, ORTABLE TOILETS, STAGES TO BE USED IN AN OUTSIDE PLACE OF PUBLIC AS... $10,000 HONG KONG DRAGON BOAT FESTIVAL