Skip to content

Job filings

111 Street, Queens • Block 02018 • Lot 0001

669 records

Work filed with the Department of Buildings under its legacy BIS system.

Latest action Job Type Status Work Cost Owner
Aug 22, 2011 410140618 Alteration Type III SIGNED OFF INSTALL TEMP. TENTS, PROPOSED TO INSTALLED TENTS, ORTABLE TOILETS, STAGES TO BE USED IN AN OUTSIDE PLACE OF PUBLIC AS... $10,000 HONG KONG DRAGON BOAT FESTIVAL
Aug 22, 2011 420213842 Alteration Type III SIGNED OFF INSTALL TEMP. TENTS, PROPOSED TO INSTALLED TENTS, ORTABLE TOILETS, STAGES TO BE USED IN AN OUTSIDE PLACE OF PUBLIC AS... $10,000 HONG KONG DRAGON BOAT FESTIVAL
Aug 18, 2011 402277610 Alteration Type II SIGNED OFF STRUCTURAL WORK ASSOCIATED WITH THE REPAIR & REPLACEMENT OF PORTIONS OF FACADE & COLUMNS AS PER PLANS FILED H... $1,500,000 NYC DEPT OF DESIGN & CONSTRUCTIO
Aug 18, 2011 420466702 Place of Assembly PLAN EXAM - DISAPPROVED $0 USTA NATIONAL TENNIS CENTER
Jul 28, 2011 420076679 Alteration Type II SIGNED OFF SUBSEQUENT APPLICATION FILED BY CIVIL ENGINEER RESPONSIBLE FOR THE DESIGN OF S HORING AND BRACING FORT THE PROTECTION... $675,000 NYCDDC
Jul 26, 2011 410131628 Alteration Type III SIGNED OFF STADIUM 2: SOUTH SIDE & NORTH SIDE VIDEO BOARD SUPPORT TOWERS HAVE BEEN ADAPTE D TO SUPPORT NEW VIDEO BOARDS. STA... $75,000 USTA NATIONAL TENNIS CENTER
Jul 26, 2011 420236444 Alteration Type III SIGNED OFF CHASE LOUNGE/HEINEKEN SPACE ERECT PRE-ENGINEERED FREE STANDING WALL PANEL SYSTEM, LOCATED WITHIN THE INDOOR TENNIS BU... $4,267 USTA NATIONAL TENNIS CENTER
Jul 19, 2011 420231902 Alteration Type III SIGNED OFF INSTALL TEMPORARY MERCEDES DISPLAY TENT FOR USE DURING THE 2010 US OPEN TENNIS TOURNAMENT FROM AUGUST 17, 2010 THRU S... $230,000 USTA NATIONAL TENNIS CENTER
Jul 6, 2011 410112612 Alteration Type II SIGNED OFF UPGRADE EXISTING KITCHEN FIRE SUPPRESSION SYSTEM, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. $10,000 USTA NATIONAL TENNIS CENTER
Jun 30, 2011 402584020 Alteration Type II SIGNED OFF Installation of interior underground plumbing in conjunction with New Building #402285816 as per plans filed herewith... $1,000 Revenue,City of NY Parks & Recre
Jun 27, 2011 401711527 Alteration Type II SIGNED OFF Upgrade existing fire suppression system, as shown on plan. (No Plumbing since electric cooking equipment) No change ... $3,000 National Tennis Center, Inc.
Jun 24, 2011 401875994 Alteration Type II SIGNED OFF Remove partial interior non-bearing partitions and to install new partitions and new toilets at first floor plan. No ... $180,000 U.S.T.A. National Tennis Center
Jun 20, 2011 420240554 Alteration Type III SIGNED OFF REPAIR OF MAJOR CONCRETE SPALLING & CRACKS OF THE LOUIS ARMSTRONG STADIUM GRANDSTAND COURT OF THE USTA NATINAL TE... $589,867 USTA NATIONAL TENNIS CENTER
Jun 13, 2011 402285807 Alteration Type II SIGNED OFF NONE $1,000 REVENUE, CITY OF NYC PARKS & REC
May 26, 2011 410112603 Alteration Type II SIGNED OFF INSTALL KITCHEN FIRE SUPPRESSION SYSTEM IN CONJUNCTION WITH JOB#402285816, AS SHOWN ON PLAN. NO CHANGE IN USE, OCCUPA... $14,000 USTA NATIONAL TENNIS CENTER
May 25, 2011 420323251 Place of Assembly PLAN EXAM - APPROVED $0 USTA NATIONAL TENNIS CTR
May 25, 2011 420143641 Place of Assembly PLAN EXAM - APPROVED $0 USTA NATIONAL TENNIS CENTER
Apr 27, 2011 420141714 Alteration Type II SIGNED OFF MINOR INTERIOR PARTITION WORK $70,000 USTA NATIONAL TENNIS CENTER
Apr 12, 2011 420337870 Place of Assembly PLAN EXAM - APPROVED $0 USTA NATIONAL TENNIS CTR
Mar 15, 2011 410166485 Alteration Type III SIGNED OFF PROPOSE TO INSTALL TENTS & MOBILE STAGE FILED IN CONJ. W/TPA Q2008-41 $10,000 KOREAN PRODUCE ASSOCIATION
Mar 8, 2011 420188460 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK MODIFICATION OF SEATING LAYOUTS ON COURT, COURTSIDE, CLUB SUITES, MEZZANINE SUITES AND UPPER BOWL. NO CHANGE IN EGRES... $525,000 USTA NATIONAL TENNIS CENTER
Feb 23, 2011 402435138 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK Addition of 328 seats and 24 barreir free positions to USTA court #2 corner infill. Remove 80 seats to expand and cnc... $200,000 U.S.T.A. National Tennis Center
Feb 23, 2011 401640104 Alteration Type I PERMIT ISSUED - ENTIRE JOB/WORK Add additional specator seating and demolish existing restaurant on 2nd floor. $1,250,000 USTA National Tennis Center
Feb 15, 2011 401214155 Alteration Type III SIGNED OFF FIRE PROTECTION PLAN. $1,000 NYC DEPT. OF DESIGN&CONSTRUCTION
Feb 2, 2011 401688599 Alteration Type II SIGNED OFF Erection of Stage and Towers as per plans filed. No change to use, egress or occupancy. $10,000 NTC Associates
Nov 30, 2010 420236408 Alteration Type III SIGNED OFF HOSPITALITY - ERECT PRE-ENGINEERED FREE STANDING WALL PANEL SYSTEM, LOCATED WITHIN THE INDOOR TENNIS BUILDING. $50,000 USTA NATIONAL TENNIS CENTER
Nov 30, 2010 420147120 Alteration Type II PERMIT ISSUED - PARTIAL JOB INSTALLATION OF EMERGENCY GENERATOR AND RELATED PIPING AT THE QUEENS WILDLIFE CONSERVATION CENTER AT FLUSHING MEADOW ... $313,000 NYC DEPARTMENT OF PARKS & RECREA
Nov 26, 2010 420236426 Alteration Type III SIGNED OFF INSTALLATION OF NON-BEARING INTERIOR PARTITIONS IN THE US OPEN CLUB & MOJITOS LOCATED ON THE FIRST FLOOR OF STADI... $5,000 USTA NATIONAL TENNIS CENTER
Nov 19, 2010 420240563 Alteration Type III SIGNED OFF GENERATOR ROOM ROOF REPAIRS AT USTA ARTHUR ASHE STADIUM $9,680 USTA NATIONAL TENNIS CENTER
Nov 15, 2010 420247236 Alteration Type III SIGNED OFF ERECT TEMPORARY GALLERY TELEVISION PLATFORM FOR 2010 OPEN TENNIS TOURNAMENT $9,680 USTA NATIONAL TENNIS CENTER
Nov 5, 2010 410150223 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY TRAILER TO BE USED DURING THE 2008 US OPEN TENNIS TOURN AMENT,FROM AUGUST 11 THROUGH SEPTEMBER... $50,000 USTA NATIONAL TENNIS CENTER
Oct 12, 2010 420254101 Alteration Type II SIGNED OFF ERECT VARIOUS RENTAL RENTS AND PLATFORMS AND OTHER PRODUCTION EQUIPMENT PER SITE PLAN FOR MAKER'S FAIRE IN FLUSHING M... $100,000 O'REILLY MEDIA INC.
Oct 6, 2010 420205003 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY TRAILER TO BE USED DURING THE 2020 US OPEN TENNIS TOURN AMENT FROM AUGUST 17, 2010 THRU SPETEM... $176,178 USTA NATIONAL TENNIS CENTER
Oct 4, 2010 420204996 Alteration Type II SIGNED OFF PROVIDE STAIR & PLATFORM FOR TEMP TRAILERS $30,000 USTA NATIONAAL TENNIS CENTER
Oct 4, 2010 420214128 Alteration Type I PLAN EXAM - DISAPPROVED FILING TO CREATE A NEW PLACE OF ASSEMBLY AT OPEN ROOFTERRACE AS PART OF QUEENS HALL OF SCIENCE $2,885,000 NYC DEPT. OF DESIGN AND CONSTRUC
Oct 4, 2010 420214119 Place of Assembly PLAN EXAM - DISAPPROVED $0 NYC DEPT OF DESIGN & CONSTR
Sep 1, 2010 402651563 Alteration Type II SIGNED OFF Erection of temporary tents for merchandise store tents and relocation of fence between construction site and event t... $25,000 USTA National Tennis Center
Aug 27, 2010 420030166 Alteration Type II SIGNED OFF TO PROVIDE A TEMPORARY TRAILER TO BE USED DURING THE 2009 US OPEN TENNIS TOURN AMENT, FROM AUGUST 18, 2009 THRU SEPTE... $790,504 TENNIS CENTER
Aug 27, 2010 402287253 Alteration Type II SIGNED OFF Installation of underground plumbing in conjunction with New Building as per plans filed herewith. No change to use, ... $1,000 Revenue,City of NY Parks & Recre
Aug 19, 2010 420236417 Alteration Type II PLAN EXAM - APPROVED TO CONSTRUCT THREE TEMPORARY STRUCTURES (2 SIDE AND 1 CENTER) LOCATED ON THE INTERIOR TENNIS COURTS OF THE FIRST FLOO... $25,000 USTA NATIONAL TENNIS CENTER
Aug 17, 2010 420240634 Alteration Type II PERMIT ISSUED - PARTIAL JOB INSTALL FIRE SUPPRESSION SYSTEM ONLY, NO CHANGE IN USE EGRESS OR OCCUPANCY. $3,000 FLUSHING GOLF CORP.
Aug 5, 2010 410227785 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER ... $0 NYC DEPT.OF DESIGN & CONSTRUCTIO
Aug 4, 2010 420196013 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK INSTALLATION OF MANUAL & AUTOMATIC SMOKE DETECTION AND SPRINKLER FIRE ALARM SYSTEM FOR JAGUAR EXHIBIT. $50,000 PARKS & RECREATION THE OLMSTED C
Jul 30, 2010 410227419 Alteration Type III SIGNED OFF PROPOSED INSTALLATION OF HEAVYDUTY SIDEWALK SHED FILED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY ... $0 NYC DEPT.OF DESIGN & CONSTRUCTIO
Jul 22, 2010 420205423 Alteration Type II PLAN EXAM - APPROVED REPLACEMENT OF ASPHALT TENNIS COURTS WITH CLAY TENNIS COURTS $210,000 USTA NATIONAL TENNIS CENTER
Jul 21, 2010 420073191 Alteration Type II SIGNED OFF UPPER SEATING STRUCTURAL REPAIRS $20,000 USTA NATIONAL TENNIS CENTER
Jul 14, 2010 420136285 New Building PLAN EXAM - APPROVED STRUCTURAL WORK IN CONJUNCTION WITH NEW BUILDING AS PER DRAWINGS $0 PARKS & RECREATION THE OLMSTED C
Jul 13, 2010 420210694 Alteration Type II PERMIT ISSUED - ENTIRE JOB/WORK PROPOSAL TO INSTALL TENTS, ALUMINUM FENCE, PORTABLE TOILETS AND EQUIPMENT STAGE TO BE USED IN AN OUTSIDE PLACE, EVENT... $7,000 CITY OF NY PARKS & RECREATION
May 7, 2010 420100839 New Building PLAN EXAM - DISAPPROVED NEW BUILDING $0 USTA NATIONAL TENNIS CENTER
May 5, 2010 401188781 Place of Assembly COMPLETED $0 NEW YORK HALL OF SCIENCE