93-38 Van Wyck Expressway, Queens
Queens • Block 09375 • Lot 0215 • Zip: 11418
Condition
What the city currently has open against this building, counted from its own records.
Address
Land use and zoning
Building
Latest assessment
Neighborhood
The area this lot falls inside, and the commute Hoodkit measures from it.
Getting around
Estimated 6 days ago- Downtown Brooklyn 54 min 12 walking, 42 riding
- Fulton Street 59 min 12 walking, 47 riding
- Grand Central 61 min 12 walking, 49 riding
- Times Square 63 min 12 walking, 51 riding
- Penn Station 64 min 12 walking, 52 riding
- Union Square 66 min 12 walking, 54 riding
Around this address
Transit and places within 0.5 miles of the lot.
Getting out
Subway
Railroad
Bus
Places nearby
Sybil's Bakery
No description yet
Pollo Campero
Guatemala-born counter-serve chain specializing in fried & grilled chicken & sides.
Bora Bora Smoothie Cafe - Jamaica Queens
Bora Bora Smoothie Cafe in Jamaica Queens offers a tropical escape with refreshing smoothies and healthy bites. Enjoy...
A Churrasqueira
Eatery dispensing Portuguese fare & drinks in a warm, intimate space with frequent live music.
Sangria
Corner eatery serving up Portuguese-style small plates, paella & other specialties, plus sangria.
Air Bar
Sports Bar
Blarney Bar
Blarney Bar is a cozy Irish pub in Jamaica, NY offering a wide selection of beers, cocktails, and traditional Irish f...
Activity
Sales, filings, permits and violations from every dataset, in one order.
2024
-
DOB violation Aug 3, 2024
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
-
DOB violation May 3, 2024
BENCH-FAILURE TO BENCHMARK NONE
FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
2020
-
Alteration Type III
MODIFICATION TO EXISTING TELECOMMUNICATIONS SITE. INSTALL ANTENNAS AND INSTALL RELATED RRH UNITS ON THE ROOF. ALL WOR...
2018
-
Alteration Type III
2017
-
Alteration Type III
MODIFICATION OF EXISTING ANTENNA SITE.REPLACE (6) EXISTING ANTENNAS ON THE ROOF. ALL WORK IS IN CONFORMANCE WITH TPPN...
-
Alteration Type III
INSTALLATION OF NEW TELECOMMUNICATIONS ANTENNAS AND REPLACEMENT OF EXISTING ANTENNAS ON ROOF. INSTALLATION OF RRH UNI...
2016
-
Alteration Type III
REMOVAL OF ANTENNA SECTOR ON THE ROOF. ALL WORK IS IN COMPLIANCE WITH TPPN 5/98. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
2015
-
Alteration Type III
MODIFICATION OF EXISTING ANTENNA SITE. INSTALLING (2) ADDITIONAL ANTENNAS ON THE ROOF. INSTALLING (1) ADDITIONAL CABI...
2013
-
CLASS - 2
FAILURE TO PROVIDE APPROVED ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION FOR JOB #420811633. RMDY: PROVIDE APPROV...
2003
-
DOB violation Mar 19, 2003
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
2002
-
DOB violation Mar 26, 2002
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1999
-
DOB violation Mar 16, 1999
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
1998
-
DOB violation May 4, 1998
LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
The most recent 6 events from each dataset, so no one source takes the axis. Each tab holds the full record.
Property Contacts
Contact information aggregated from multiple government sources
Building Permits
Owner information from Department of Buildings filings
Deed Records
Parties from ACRIS deed and mortgage records
Property Records
Owner information from assessment and PLUTO records