Job filings
David Geffen Hall, Manhattan • Block 01134 • Lot 0001
294 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Nov 11, 2025 | 141028741 | Alteration Type III | PLAN EXAM - DISAPPROVED | FILING HEREWITH BUILDERS PAVEMENT PLAN (BPP) - 810 LINEAR FEET - IN CONJUNCTION WITH ALT-CO APPLICATION #M01270545. C... | $0 | LINCOLN CENTER |
| Jul 1, 2025 | 120069683 | Alteration Type II | SIGNED OFF | SEE SECTION #24. | $888,200 | LINCOLN CTR FOR PERFORMING ARTS |
| Apr 23, 2025 | 110230697 | Alteration Type II | SIGNED OFF | GENERAL CONSTRUCTION ASSOCIATED WITH TEMPORARY STAGE FOR TEMPORARY PLACE OF ASSEMBLY. NO CHANGE IN OCCUPANCY USE OF E... | $1,000 | LINCOLN CENTER FOR PERF. ARTS |
| Apr 14, 2023 | 140931071 | Alteration Type III | SIGNED OFF | TEMPORARY TENTS FOR WEATHER COVER FOR CORPORATE OUTDOOR DINING ON LC NORTH PLAZA. NO CHANGE IN USE OR EGRESS. WEATHER... | $5,000 | EVENT PRODUCTION PERFORMANCE |
| Oct 28, 2022 | 140927870 | Alteration Type I | PERMIT ISSUED - ENTIRE JOB/WORK | FILING HEREWITH ALTERATION TYPE I FOR LINCOLN CENTER'S DAVID GEFFEN HALL. ALTERATION TYPE I PROPOSES CHANGE IN USE, E... | $105,830,206 | LINCOLN CENTER PERFORMING ARTS |
| Aug 5, 2022 | 140918372 | Alteration Type II | SIGNED OFF | FILING HEREWITH NON-STRUCTURAL DEMOLITION SCOPE - AKA SOFT INTERIOR DEMOLITION - INCLUSIVE OF REMOVING NON-LOAD BEARI... | $3,823,650 | LINCOLN CENTER PERFORMING ARTS |
| Jul 27, 2022 | 140970233 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY OVERHEAD PROTECTION AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| Jul 22, 2022 | 140921705 | Alteration Type II | SIGNED OFF | FILING HEREWITH STRUCTURAL MODIFICATIONS INCLUSIVE OF PARTIAL DEMOLITION, SLAB REMOVALS, STEEL SUPPORT, LOWER ROOF HA... | $1,131,000 | LINCOLN CENTER PERFORMING ARTS |
| Jul 20, 2022 | 140958024 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY PERSONNEL MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| Jul 20, 2022 | 140985575 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY WEATHER ENCLOSURE AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| Jun 15, 2022 | 140984273 | Alteration Type II | SIGNED OFF | INSTALLATION OF AN ADT ACCESS SYSTEM ON THE ROOF AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLI... | $0 | GREG LOGISTICS LLC |
| May 20, 2022 | 140969325 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY WORK PLATFORM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| May 20, 2022 | 140997651 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY GANTRY MATERIAL HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| Apr 26, 2022 | 120753942 | Alteration Type II | SIGNED OFF | MODIFICATIONS TO EXISTING FIRE ALARM SYSTEM AS PER PLANS SUBMITTED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS. | $6,200 | LINCOLN CTR FOR PERFORMING ARTS |
| Apr 15, 2022 | 140918381 | Alteration Type II | SIGNED OFF | FILING HEREWITH CELLAR,PENTHOUSE & ROOF SCOPE RENOVATIONS, INCLUSIVE OF REMOVAL OF EXTERIOR GLAZING, REMOVE EXIST... | $2,957,789 | LINCOLN CENTER PERFORMING ARTS |
| Dec 14, 2021 | 123488626 | Alteration Type II | SIGNED OFF | FACADE REPAIRS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY. | $4,433,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Dec 9, 2021 | 140953920 | Alteration Type II | PLAN EXAM - DISAPPROVED | FILING HEREWITH STRUCTURAL MODIFICATIONS TO EXISTING BUILDING - LINCOLN CENTER - DAVID GEFFEN HALL - STRUCTURE, INCLU... | $27,115,170 | LINCOLN CENTER PERFORMING ARTS |
| Sep 1, 2021 | 140898580 | Alteration Type II | SIGNED OFF | FILING HEREWITH INSTALLATION OF TEMPORARY SITE-OFFICE CONSTRUCTION TRAILER STRUCTURE. APPLICATION FILED IN ACCORDANCE... | $75,000 | LINCOLN CENTER PERFORMING ARTS |
| Dec 8, 2020 | 140965926 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY BETA MAX HOIST AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $0 | LINCOLN CENTER FOR THE PERFORMIN |
| Dec 3, 2020 | 140847680 | Alteration Type III | SIGNED OFF | INSTALLATION OF A TEMPORARY PERSONNEL/MATERIAL HOIST TOWER AS PER PLANS IN CONJUNCTION WITH GENERAL CONSTRUCTION CONS... | $0 | PLATFORMS SOLUTIONS, INC |
| Nov 23, 2020 | 123332456 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP PERFORMANCE CANOPY, TENTS AND TRUSSES FOR LC NORTH PLAZA EVENT SERIES, NO ALTERATIONS TO EXIST STRUCT... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Nov 23, 2020 | 123296496 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP TENTS FOR LIFEWTR GALLERY RAIN TENT SCHEDULED ON JUNE 28,2017. NO ALTERATION OF EXISTING STRUCTURES, ... | $5,000 | LLINCOLN CENTER FOR THE PRFRMNG |
| Sep 25, 2020 | 123370244 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP TENT, NO ALTERATIONS TO EXIST STRUCTURES, FOR THE ANNUAL BARONS CAPITAL CONF, LOCATED AT JOSE ROBERSO... | $5,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Sep 8, 2020 | 123761786 | Alteration Type II | SIGNED OFF | FILING FOR STRUCTURAL WORK AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, OCCUPANCY, AND EGRESS. | $150,000 | METROPOLITAN OPERA ASSOCIATION |
| Jul 24, 2020 | 123387110 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | SINGLE STORY ROOFTOP ADDITION TO EXISTING STRUCTURE WITH EXTENSION OF EXISTING ELEVATOR AND INSTALLATION OF MISCELLAN... | $630,000 | METROPOLITAN OPERA ASSOCIATION |
| Jul 1, 2020 | 140920500 | Alteration Type II | PLAN EXAM - IN PROCESS | FILING HEREWITH STRUCTURAL MODIFICATIONS INCLUSIVE OF PARTIAL DEMOLITION, SLAB REMOVALS, STEEL SUPPORT, LOWER ROOF HA... | $1,131,000 | LINCOLN CENTER PERFORMING ARTS |
| Mar 23, 2020 | 123773283 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP PLATFORMS, LIGHTING TRUSS, CANOPY,NO ALTERATIONS TO EXIST STRUCTURES, FOR LONGCHAMP AT HEARST PLAZA, ... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Apr 19, 2019 | 123486897 | Alteration Type II | SIGNED OFF | APPLICATION FILED FOR MINOR SPRINKLER WORK AS SHOWN AT ROOF GRID IRON SYSTEM. | $10,000 | METROPOLITAN OPERA ASSOCIATION |
| Apr 5, 2019 | 123476728 | Alteration Type II | SIGNED OFF | STRUCTURAL WORK AT ROOF AS SHOWN ON PLANS FILED HEREWITH. | $150,000 | METROPOLITAN OPERA ASSOCIATION |
| Mar 27, 2019 | 140839430 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED SPECIAL SUSPENDED RIGGING SCAFF. SYSTEM INSTALLATION (WITHOUT ANCHORAGE OR COUNTER WEIGHT) FOR REMEDIAL WORK... | $100 | QUANTUM DESIGN |
| Mar 25, 2019 | 123472429 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR TEMPORARY STRUCTURE FOR TPA EVENT - METROPOLITAN OPERA ASSOCIATION, HD SUMMER FESTIVAL 2018. STRU... | $5,000 | METROPOLITAN OPERA ASSOCIATION |
| Feb 4, 2019 | 123426024 | Alteration Type II | SIGNED OFF | MODIFICATION TO EXISTING HVAC SYSTEM AND PLUMBING FIXTURES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR O... | $87,500 | THE METROPOLITAN OPERA ASSOCIATI |
| Jan 30, 2019 | 123538895 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP PLATFORM AND INTERIOR TRUSS,NO ALTERATIONS TO EXIST STRUCTURES, FOR PFIZER AT DAVID GEFFEN HALL ON NO... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Dec 21, 2018 | 123147362 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP TENT, NO ALTERATIONS TO EXIST STRUCTURES, FOR THE BARONS CONF. REGISTRATION, LOCATED AT JOSE ROBERSON... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Aug 30, 2018 | 122926049 | Alteration Type III | SIGNED OFF | INSTALLATION OF CHAIN LINK FENCE ON TOP OF PLASTIC BARRIERS AS PER DRAWINGS. CHAIN LINK FENCE SHALL COMPLY WITH CHAPT... | $0 | SAFWAY ATLANTIC LLC |
| Aug 21, 2018 | 122379826 | Alteration Type III | SIGNED OFF | INSTALLATION OF OVERHEAD PROTECTION AS PER DRAWINGS DURING BUILDING ALTERATION FILED UNDER SEPARATE APPLICATION. OVER... | $0 | SAFWAY ATLANTIC LLC |
| Aug 21, 2018 | 122932620 | Alteration Type III | SIGNED OFF | INSTALLATION OF SYSTEM SCAFFOLD AS PER DRAWINGS. SYSTEM SCAFFOLD SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CO... | $0 | SAFWAY ATLANTIC LLC |
| Apr 3, 2018 | 123445147 | Alteration Type II | PLAN EXAM - DISAPPROVED | MANUAL/AUTOMATIC SMOKE DETECTION FIRE ALARM SYSTEM: CEL B, CEL A, STAGE LEVEL, 3RD FLOOR GALLERY LEVEL 1, GALLERY LEV... | $150,000 | METROPOLITAN OPERA ASSOCIATION |
| Apr 2, 2018 | 123390909 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALL OF TEMP PLATFORM AND TENT ON PLAZA, NO ALTERATIONS TO EXIST STRUCTURES FOR DOLCE GABBANA EVENT ON APRIL 8, A ... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Feb 12, 2018 | 122946553 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR TEMPORARY STRUCTURE FOR TPA EVENT - METROPOLITAN OPERA ASSOCIATION, HD SUMMER FESTIVAL 2017. STRU... | $5,000 | METROPOLITAN OPERA ASSOCIATION |
| Feb 6, 2018 | 121813207 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF A TEMPORARY SPRINKLER LOOP, NEW SPRINKLER HEADS ON THE CELLAR LEVELS AND RELOCATION OF AN EXISTING FI... | $35,000 | CITY CENTER OF MUSIC & DRAMA INC |
| Oct 5, 2017 | 123110739 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP PLATFORMS FOR WORKOUT WITH NYCB AND PUMA SCHEDULED ON SEPTEMBER 23, 2017, NO ALTERATION OF EXISTING S... | $5,000 | LINCOLN CENTER FOR THE PRFRMNG |
| Sep 25, 2017 | 122459133 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY EXTERIOR TENTS & PLATFORMS FOR THE LINCOLN CENTER NORTH PLAZA SPECIAL EVENT SERIES. TPA... | $5,000 | AVERY FISHER HALL |
| May 31, 2017 | 123062979 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP EXTERIOR TENT, PLATFORMS, TRUSSES,NO ALTERATIONS TO EXIST STRUCTURES, FOR THE L560 LAUNCH EVENT, LOCA... | $5,000 | LLINCOLN CENTER FOR THE PRFRMNG |
| Mar 1, 2017 | 122895723 | Alteration Type II | SIGNED OFF | APPLICATION IS FILED FOR STAIR REPAIR ON THE LOWER CONCOURSE LEVEL (SUB CELLAR)- RED LEVEL OF THE GARAGE AS SHOWN ON ... | $50,000 | LINCOLN CENTER FOR PERFORMING |
| Jan 17, 2017 | 122932648 | Alteration Type III | SIGNED OFF | INSTALL OF TEMP TENT,NO ALTERATIONS TO EXIST STRUCTURES, FOR THE BARONS CONF REGISTRATION, LOCATED AT JOSE ROBERSON P... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Jan 12, 2017 | 122428890 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS, PRODUCTION EQUIPMENT FOR THE FRAGRANCE FOUNDATION AWARDS EVENT, LOCATED ON ALICE TULLY HALL?... | $5,000 | AVERY FISHER HALL |
| Dec 6, 2016 | 122861732 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR TEMPORARY STRUCTURE FOR TPA EVENT - METROPOLITAN OPERA ASSOCIATION, HD SUMMER FESTIVAL 2016. STRU... | $5,000 | METROPOLITAN OPERA ASSOCIATION |
| Oct 14, 2016 | 140523011 | Alteration Type II | SIGNED OFF | INSTALLATION OF A/C FOR IT ROOM. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY | $28,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Aug 24, 2016 | 122004963 | Place of Assembly | COMPLETED | — | $0 | THE METROPOLITAN OPERA ASSOCIATO |