Job filings
David Geffen Hall, Manhattan • Block 01134 • Lot 0001
294 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Aug 25, 2008 | 110318157 | Alteration Type III | PLAN EXAM - DISAPPROVED | CURB CUT | $0 | LINCOLN CENTER FOR PERFORMING AR |
| Jul 10, 2008 | 110205180 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INTERIOR RENOVATION OF GIFT SHOP AT PLAZA LEVEL. NO CHANGE TO USE EGRESS OR OCCUPANCY UNDER THIS APPLICATION. | $40,000 | METROPLOITAN OPERA ASSOCIATION |
| Jul 1, 2008 | 110224604 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF PIPE SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $0 | ATLANTIC HOISTING & SCAFFOLDING |
| Jun 16, 2008 | 104895909 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Shoring of a portion of the first floor to accomodate the load of debris container as shown on plans. No change in us... | $21,000 | BREEZE NATIONAL INC. |
| Apr 25, 2008 | 110147957 | Alteration Type II | PLAN EXAM - APPROVED | STANDPIPE WORK ASSOCIATED WITH PROMENADE PROJECT REDEVELOPMENT. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $100,000 | LINCOLN CTR FOR PERFORMING ARTS |
| Apr 24, 2008 | 110142033 | Alteration Type II | PLAN EXAM - DISAPPROVED | SPRINKLER WORK ASSOCIATED WITH PROMENADE PROJECT REDEVELOPMENT. NO CHANGE IN OCCUPANCY, USE OR EGRESS. | $300,000 | LINCOLN CTR FOR PERFORMING ARTS |
| Mar 18, 2008 | 110069880 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALLATION OF SCAFFOLD AS PER DRAWINGS. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. | $0 | ATLANTIC HOISTING & SCAFFOLDING |
| Jan 14, 2008 | 110035738 | Alteration Type II | PLAN EXAM - DISAPPROVED | INSTALLATION OF SPRINKLER SYSTEM AS SHOWN ON PLANS FILED HEREWITH. NO CH ANGE IN USE, EGRESS OR OCCUPANCY. | $120,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Nov 23, 2007 | 110034338 | Alteration Type II | PLAN EXAM - DISAPPROVED | DOCUMENT EXISTING FIRE ALARM SYSTEMIN THE OFFICE AND MECHNACL SPACE AS PER PLANS NO CHANGES | $60,000 | LINCOLN CENTER FOR PERFORMNG ART |
| Oct 2, 2007 | 104890619 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Propose to install ADA wheel chair lift as shown on drawings filed herewith. No change in use, egress of occupancy. | $10,000 | METROPOLITAN OPERA ASSOCIATION |
| Jul 16, 2007 | 104832371 | Alteration Type II | PLAN EXAM - APPROVED | RECONFIGURE LOBBY FOR REVISED MAKE UPAIR GRILLS AND NEW MAGNETIC LOCKS @ STAIR DOOR. NO CHANGE IN USE EGRESS OR OCCUP... | $5,000 | NEW YORK STATE THEATRE |
| Jun 27, 2007 | 104811606 | Alteration Type II | PLAN EXAM - DISAPPROVED | MODIFICATION OF SPRINKLER SYSTEM. NOCHANGE IN OCCUPANCY,USE OR EGRES S. | $382,900 | LINCOLN CENTER FOR THE PERFORMIN |
| Jun 19, 2007 | 104801902 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | WE SHALL INSTALL 21 LINEAR FT OF HEAVYDUTY SIDEWALK SHED. THIS SHALL BE USED FOR FACADE REPAIR AND MINOR POINTING RES... | $0 | AVERY FISHER HALL |
| Jun 14, 2007 | 104797873 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Installation of lighting tower, platform and performance rigging for Temporary Place of Assembly for Midsummer Nights... | $30,000 | Lincoln Center for the Performin |
| Feb 16, 2007 | 104401577 | Alteration Type II | SIGNED OFF | Filing herewith for interior renovations. No change in occupancy, use or egress. | $10,000 | NYC Department of Design & Const |
| Jan 2, 2007 | 104466329 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED INSTALLATION OF 250 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY... | $0 | ARSENAL SCAFFOLD INC. |
| Dec 27, 2006 | 104455741 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | PROPOSED INSTALLATION OF 400 LINEAR FEET OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS. SIDEWALK SHED SHALL COMPLY... | $0 | ARSENAL SCAFFOLD INC. |
| Oct 12, 2006 | 104500906 | Alteration Type II | SIGNED OFF | INSTALL NEW PIPING TO TURBINE # & #2 . INSTALL NEW STEAM TRAPS AND CONDE NSATE DISCHARGE PIPING. NO CHANGE IN USE... | $50,000 | LINCOLN CENTER |
| Oct 2, 2006 | 103393418 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM ONLY. NO CHANGE, IN USE, EGRESS OR OCCUPANCY. ALL ELECTRIC APPLIANCES. NO GAS VALVE. | $3,000 | PANE VINO |
| Sep 25, 2006 | 104533284 | Alteration Type II | PLAN EXAM - DISAPPROVED | Application filed for egress review as a non-directive 14, as shown on drawings filed herewith. No change in use, egr... | $1,000 | METROPOLITAN OPERA ASSOCIATION |
| Aug 30, 2006 | 104429469 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | MODIFICATION OF EXISTING SPRINKLER WORKASSOICATED WITH NEW 63RD STREET DRIVE & RAMP. NO CHANGE IN USE,EGRESS OROC... | $15,000 | LINCOLN CENTER FOR PERFORMING AR |
| Aug 29, 2006 | 104536030 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Propose to demolish and install new interior finishes as shown on drawings filed herewith. No change in use, egress o... | $65,000 | METROPOLITAN OPERA ASSOCIATION |
| Jun 27, 2006 | 104454804 | Alteration Type III | SIGNED OFF | INSTALL HEAVY DUTY SIDEWALK SHED FOR A TOTAL OF 400 FT LONG AT 140 WEST 65 STREET. - INCLUDES 5 ENTRANCES AT PARKING ... | $0 | LINCOLN CENTER FOR PERFORMING AR |
| May 12, 2006 | 104116314 | Place of Assembly | PERMIT ISSUED - ENTIRE JOB/WORK | — | $0 | LINCOLN CENTER OF PERFORMING ART |
| May 3, 2006 | 104416981 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Temporary Tent to be used for special event on May 17, 2006. TPA filed with Borough Commissioners Office. | $10,000 | Lincoln Center/Perfm. Arts |
| Dec 15, 2005 | 104285453 | Alteration Type II | SIGNED OFF | Replace turbine and compressor in two (2) existing chillers and provide with R-134A refridgeration. Change refridgera... | $1,632,000 | Lincoln Center |
| Dec 7, 2005 | 104013112 | Alteration Type II | SIGNED OFF | Remove and replace 2 existing cooling towers on the roof. lnstall new roof drains. No change in use,egress, or occupa... | $1,200,000 | Lincoln Center |
| Dec 5, 2005 | 102786264 | Place of Assembly | COMPLETED | — | $0 | MET OPERA |
| Nov 7, 2005 | 104116323 | Place of Assembly | COMPLETED | — | $0 | LINCOLN CENTER OF PERFORMING ART |
| Nov 7, 2005 | 104116332 | Place of Assembly | COMPLETED | — | $0 | LINCOLN CENTER OF PERFORMING ART |
| Nov 7, 2005 | 104116341 | Place of Assembly | COMPLETED | — | $0 | LINCOLN CENTER OF PERFORMING ART |
| Sep 7, 2005 | 104224992 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Dig test pit and perform noise test inside property line in plaza. No change in use egress or occupancy. | $1,000 | Lincoln Center Develop Project |
| Aug 1, 2005 | 103864356 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | CONCRETE REINFORCEMENT AND REPAIRS ONTHE PARKING GARAGE AS PER PLANS NO CHANGES | $150,000 | LINCOLN CENTER FOR THE PERFOMING |
| May 5, 2005 | 104094873 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | Temporary tent to be used for one day only on May 18, 2005. No change in use, egress or occupancy. | $10,000 | Lincoln Ctr. for Performing Arts |
| May 19, 2004 | 103772785 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Temporary tent to be used for one day only on May 19, 2004. No change in use, egress or occupancy. | $10,000 | Lincoln Ctr. for Performing Arts |
| May 13, 2003 | 103452201 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Temporary tent to be used one day only on May 14, 2003.No change in use, egress or occupancy. | $10,000 | Lincoln Ctr.for Performing Arts |
| May 10, 2002 | 103160972 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Temporary Tent Pavilion. A Temporary Public Assembly Permit (TPA 144/02) has been granted by the Manhattan, Borough C... | $10,000 | Lincoln Center/Perfm. Arts |
| Mar 27, 2002 | 103107905 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | EXTENSION TO EXISTING FIRE ALARM SYSTEM - DOOR LOCKS THERE IS NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $15,000 | LINCOLN CENTER FOR THE PERF. ART |
| Mar 18, 2002 | 103102241 | Alteration Type II | PLAN EXAM - APPROVED | INSTALLATION OF NEW PRV STATION AND METE R STATION FOR REFLECTING POOL. O CHANGE IN USE, EGRESS OR OCCUPANCY. | $175,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Mar 11, 2002 | 103114176 | Alteration Type III | PERMIT ISSUED - ENTIRE JOB/WORK | Installation of Temporary Shell Structure, for 3 months starting March 13, 2002 to June 30, 2002. Temporary Public As... | $10,000 | Lincoln Center/Perfm. Arts |
| Feb 21, 2002 | 103103179 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | EXTENSION TI EXISTING CLASS E FIRE ALARM SYSTEM.DOOR LOCKS NO CHANGE IN USE EGRESS OR OCCUPANCY | $15,000 | LINCOLN CENTER FOR PERFOMNG.ARTS |
| Jun 12, 2001 | 102590395 | Alteration Type II | PLAN EXAM - APPROVED | Propose to rearrange the existing ductwork. Propose to remove & install plumbing fixtures along with related pipi... | $10,000 | Metropolitan Opera Association |
| Aug 23, 2000 | 102865614 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALL DIESEL GENERATOR IN NEWLY CREATE D ROOM. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $50,000 | LINCOLN CENTER FOR THE PERFORM. |
| Jul 24, 2000 | 102723714 | Alteration Type III | PLAN EXAM - APPROVED | TEMPORARY STRUCTURE_TENT | $10,000 | LINCOLN CTR FOR THE PERFORMER |