Job filings
David Geffen Hall, Manhattan • Block 01134 • Lot 0001
294 records
Work filed with the Department of Buildings under its legacy BIS system.
| Latest action | Job | Type | Status | Work | Cost | Owner |
|---|---|---|---|---|---|---|
| Jul 26, 2016 | 122827548 | Alteration Type III | SIGNED OFF | INSTALL INTERIOR LED TRUSS TOWERS & SCREEN, PERFORMANCE PLATFOM, DECKING FOR A TV BROADCAST OF THE 2016 HIPHOP HO... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Jul 25, 2016 | 122830829 | Alteration Type III | SIGNED OFF | INSTALL TEMP EXTERIOR TENTS, PLATFORMS, PERFORMANCE CANOPY FOR LINCOLN CENTER NORTH PLAZA SPECIAL EVENTS SERIES, LOCA... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Jul 25, 2016 | 122828119 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY EXTERIOR PRESS RISER AND PLATFORM FOR THE 2016 HIPHOP HONORS AWARDS RED CARPET ENTRY, LOCATED IN JO... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Jul 12, 2016 | 122426650 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS FOR THE ALVIN AILEY EVENT, LOCATED AT DAVID H. KOCH THEATER, UPPER PROMENADE, SCHEDULED FOR J... | $5,000 | DAVID H. KOCH THEATER AT LINCOLN |
| May 20, 2016 | 122717293 | Alteration Type III | SIGNED OFF | INSTALL PLATFORM & TRUSSES FOR THE DIGITAL INITIATIVES LAUNCH EVENTS, SCHEDULED FOR MAY 6-9 2016. TPA REQUIRED. E... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| May 20, 2016 | 122756017 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | CONCRETE SPALL REPAIR AND OVER PATCHING ON UNDERSIDE OF ROOF; NO CHANGE TO USE, EGRESS, OR OCCUPANCY. | $496,500 | METROPOLITAN OPERA ASSOCIATION |
| Apr 25, 2016 | 140418368 | Alteration Type II | SIGNED OFF | A/C FOR PARKING GARAGE OFFICE. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY | $5,250 | LINCOLN CENTER FOR THE PERFORMIN |
| Mar 17, 2016 | 122505173 | Place of Assembly | COMPLETED | — | $0 | MET OPERA |
| Mar 15, 2016 | 122545987 | Alteration Type II | SIGNED OFF | FILING MECHANICAL WORK FOR REMOVAL OF EXISTING BRANCH DUCT TO MAIN DUCT, REMOVE PORTIONS OF MAIN DUCTS AS REQUIRED, R... | $40,000 | METROPOLITAN OPERA ASSOCIATION |
| Feb 10, 2016 | 122432251 | Alteration Type II | SIGNED OFF | REMOVE EXISTING AC UNITS DURING ROOF REPLACEMENT AND RE-INSTALL THE SAME UNITS AFTER ROOF REPLACEMENT' REPLACE EXISTI... | $26,380 | LINCOLN CENTER FOR THE PERFORMIN |
| Feb 4, 2016 | 122329186 | Alteration Type II | SIGNED OFF | ASBESTOS ABATEMENT. REMOVE EXISTING PENTHOUSE ROOF AND REPLACE WITH NEW. REPLACE ROOF SCUTTLE AND LADDER. REPOINT OR ... | $1,069,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Dec 11, 2015 | 122474045 | Alteration Type II | SIGNED OFF | CONCRETE REPAIR OF THE EXISTING TUNNEL. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $267,750 | LINCOLN CENTER |
| Nov 27, 2015 | 122563706 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENT FOR THE BARON FUND CONFERENCE REGISTRATION TENT EVENT, LOCATED AT JOSIE ROBERTSON PLAZA, SCHED... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Nov 19, 2015 | 140391797 | Alteration Type II | SIGNED OFF | FILING FOR MODIFICATION OF EXISTING KITCHEN FIRE SUPPRESSION SYSTEM FOR THE GRAND TIER RESTAURANT IN CONJUNCTION WITH... | $4,000 | METROPOLITAN OPERA ASSOCIATION |
| Oct 20, 2015 | 122514975 | Alteration Type II | SIGNED OFF | HEREWITH FILING FOR TEMPORARY STRUCTURE FOR TPA EVENT - METROPOLITAN OPERA ASSOCIATION, HD SUMMER FESTIVAL 2015. STRU... | $5,000 | METROPOLITAN OPERA ASSOCIATION |
| Oct 20, 2015 | 140418331 | Alteration Type II | PLAN EXAM - IN PROCESS | A/C FOR PARKING GARAGE OFFICE. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY | $5,250 | LINCOLN CENTER FOR THE PERFORMIN |
| Oct 15, 2015 | 140416921 | Alteration Type II | PLAN EXAM - IN PROCESS | A/C FOR PARKING GARAGE OFFICE. THERE WILL BE NO CHANGE IN USE EGRESS OR OCCUPANCY | $5,250 | LINCOLN CENTER FOR THE PERFORMIN |
| Sep 24, 2015 | 122521486 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS, PLATFORMS, PRODUCTION EQUIPMENT FOR THE SHINNYO LANTERN FLOATING FOR PEACE 2015 EVENT, SCHED... | $5,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Aug 24, 2015 | 122422716 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | ARCHITECTURAL WORK AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $126,000 | METROPOLITAN OPERA ASSOCIATION |
| Jul 15, 2015 | 122438184 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY INTERIOR PLATFORMS FOR THE EVENT KNOWN AS THE, HENNESSEY 250TH ANNIVERSARY TOUR, LOCATED AT... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| May 4, 2015 | 122330815 | Place of Assembly | COMPLETED | — | $0 | JULLIARD SCHOOL |
| May 4, 2015 | 122330824 | Place of Assembly | COMPLETED | — | $0 | JULLIARD SCHOOL |
| Apr 30, 2015 | 121899464 | Alteration Type III | SIGNED OFF | TEMPORARY INSTALLATION OF TENTS (20'X200'), PLATFORMS, AND TRUSSES FOR THE GAME OF THRONES PREMIERE RECEPTION, ON LIN... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Apr 30, 2015 | 121708615 | Alteration Type II | SIGNED OFF | INSTALLATION OF A TEMPORARY PLATFORM, TRUSSING AND A TEMPORARY TENT FOR THE LINCOLN CENTER NORTH PLAZA, ?OUT OF DOORS... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Mar 13, 2015 | 122255362 | Alteration Type II | PERMIT ISSUED - ENTIRE JOB/WORK | INSTALL FIRE SUPPRESSION SYSTEM,GAS VALVE UNDER #104148968, NO CHANGE IN USE EGRESS OR OCCUPANCY. | $3,000 | METROPOLITAN OPERA |
| Feb 4, 2015 | 104148968 | Alteration Type II | SIGNED OFF | INSTALL FIRE SUPPRESSION SYSTEM ONLY. NOCHANGE IN USE, EGRESS OR OCCUPAN CY. | $3,000 | METROPOLITAN OPERA HOUSING |
| Nov 14, 2014 | 122175662 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS LOCATED IN JOSIE ROBERTSON PLAZA FOR GUEST REGISTRATION TO THE BARON FUND INVESTMENT CONFEREN... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Oct 28, 2014 | 110103254 | Alteration Type III | SIGNED OFF | PROPOSED: MECHANICAL MEANS AND METHODS. EXISTING SLAB REMOVAL LOCATED AT LINCOLN CENTER PROMENADE PROJECT PACKAGE 9. ... | $0 | LINCOLN CENTER FOR THE PERFFORMI |
| Oct 16, 2014 | 122121220 | Alteration Type III | SIGNED OFF | INSTALLATION OF ART EXHIBIT USING A SCAFFOLD SYSTEM FOR THE SOLAR CONSTRUCTION ART EXHIBIT EVENT, LOCATED IN THE J RO... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Oct 16, 2014 | 122063738 | Alteration Type III | SIGNED OFF | INSTALL OF TEMPORARY TENTS AND PLATFORMS FOR THE ANNUAL LINCOLN CENTER OUT OF DOORS MUSIC AND PERFORMANCE PROGRAM. A ... | $5,000 | PFLAMM@LINCOLNCENTER.ORG |
| Sep 24, 2014 | 122129927 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS, PLATFORMS & TRUSSES FOR THE SHINNYO LANTERN FLOATING FOR PEACE EVENT, LOCATED AT THE NOR... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Sep 24, 2014 | 122127992 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY CONNECTING CANOPY FROM AVERY FISHER HALL TO THE KOCH THEATER FOR THE PHILARMONIC FALL GALA EVENT ON... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Aug 7, 2014 | 121614100 | Alteration Type II | SIGNED OFF | THE FABRICATION AND INSTALLATION OF A STEEL FRAME COMPRISED OF 6 STEEL COLUMNS, 15 STEEL BEAMS, WITH CHANNEL BRACES A... | $150,000 | METROPOLITAN OPERA |
| Jun 25, 2014 | 122026734 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS FOR THE 2014 FRAGRANCE FOUNDATION AWARDS GALA EVENT, LOCATED ON THE PLAZA&STREET OF ALICE... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Jun 18, 2014 | 122026716 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY TENTS FOR ALVIN AILEY SPIRIT GALA EVENT, TENTS ARE LOCATED OUTSIDE OF THE KOCH THEATER, SCHEDULED F... | $5,000 | DAVID H KOCH THEATER |
| Jun 10, 2014 | 121420685 | Alteration Type I | PERMIT ISSUED - ENTIRE JOB/WORK | FILING ALTERATION 1 APPLICATION TO CAPTURE CHANGES MADE TO CERTIFICATE OF OCCUPANCY FILED UNDER ALT 263/82. ALL CONST... | $1,000 | MEROPOLITAN OPERA |
| May 27, 2014 | 110071920 | Alteration Type II | SIGNED OFF | REMOVAL OF EXISTING SPRINKLER SYSTEM INTHE 140 WEST 65TH STREET BUILDIN G AS PER PLANS FILED. NO CHANGE TO USE,EGRESS... | $30,000 | LINCOLN CENTER FOR THE PERFORMIN |
| May 12, 2014 | 121981882 | Alteration Type III | SIGNED OFF | INSTALL TEMPORARY ENTRY TENT FOR EVENT KNOWN AS THE 41ST ANNULA CHAPLIN AWARD TRIBUTE GALA SCHEDULED FOR APRIL 28TH 2... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| May 5, 2014 | 121126931 | Alteration Type II | SIGNED OFF | ROOF REPLACEMENT FOR METROPOLITAN OPERA HOUSE AS SHOWN ON DRAWINGS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPA... | $3,525,000 | THE METROPLITAN OPERA HOUSE |
| Apr 1, 2014 | 120069488 | Alteration Type III | SIGNED OFF | INSTALLATION OF APPROX. 20 LF OF HEAVY-DUTY SIDEWALK SHED AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, ... | $0 | DEDICATED INDUSTRIES |
| Mar 3, 2014 | 120063411 | Alteration Type II | SIGNED OFF | MODIFICATION OF SPRINKLER SYSTEM ASSOCIATED WITH FILM SOCIETY TENANT FITOUT. NO CHANGE IN USE, EGRESS OR OCCUPANCY. | $211,120 | LINCOLN CTR FOR PERFORMING ARTS |
| Mar 3, 2014 | 104010507 | Alteration Type II | SIGNED OFF | PLUMBING MODIFICATIONS TO THE INSTALLATI ON OF NEW DOUBLE CHAECK VALUES DCV) AND 2 NEW WATER METERS AT VARIOUS M AIN ... | $122,000 | LINCOLN CTR FOR PERFORMING ARTS |
| Feb 20, 2014 | 121914517 | Alteration Type III | SIGNED OFF | INSTALLATION OF TEMPORARY TENTS ON THE BROADWAY EXTERIOR PLAZA OF ALICE TULLY HALL FOR THE EVENT KNOWN AS AMERICA SON... | $3,000 | AVERY FISHER HALL |
| Nov 15, 2013 | 121822910 | Alteration Type II | SIGNED OFF | INSTALLATION OF TEMPORARY ATTENDEE REGISTRATION TENTS FOR THE, BARON EVENT, LOCATED AT JOSIE ROBERTSON PLAZA, SCHEDUL... | $5,000 | LINCOLN CENTER OF THE PRFMNG ART |
| Oct 22, 2013 | 121775061 | Alteration Type II | SIGNED OFF | INSTALLATION OF A TEMPORARY TENT FOR THE NEW YORK FILM FESTIVAL MEDIA, LOCATED OUTSIDE OF ALICE TULLY HALL, SCHEDULED... | $5,000 | FILM SOCIETY OF LINCOLN CENTER |
| Oct 15, 2013 | 120677712 | Alteration Type II | SIGNED OFF | ADDITIONS TO INTERIOR FIRE ALARM SYSTEM. INSTALLATION OF DUCT SMOKE DETECTORS, AND FAN MONITORING AND CONTROL MODULES... | $6,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Oct 15, 2013 | 120677721 | Alteration Type II | SIGNED OFF | ADDITIONS TO INTERIOR FIRE ALARM SYSTEM. INSTALLATION OF DUCT SMOKE DETECTORS, AND FAN MONITORING AND CONTROL MODULES... | $6,000 | LINCOLN CENTER FOR THE PERFORMIN |
| Oct 11, 2013 | 121705725 | Alteration Type II | SIGNED OFF | NEW RAISED PLATFORM IN CORRIDOR. REMOVAL AND INSTALLATION OF SCENIC CONSTRUCTI ON IN ORCHESTRA PIT. NO CHANGE IN USE,... | $25,000 | METROPOLITAN OPERA |
| Oct 7, 2013 | 121637880 | Alteration Type II | SIGNED OFF | INSTALLATION OF STEAM METER AND CONTROL VALVE. NO CHANGE IN USE, OCCUPANCY OR EGRESS. | $234,515 | LINCOLN CENTER FOR PERFORM ARTS |
| Sep 23, 2013 | 121760594 | Alteration Type II | SIGNED OFF | INSTALLATION OF TEMPORARY TENTS FOR THE SPECIAL EVENT KNOWN AS THE MCCA DIVERSITY HONORS GALA, SCHEDULED FOR SEPTEMBE... | $5,000 | MINORITY CORP COUNSEL ASSOCIATIO |